• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    What Are The Responsibilities Of Planning And Material Accounting?

    2010/12/25 18:28:00 206

    Plan Accounting Material Accounting Post Duties

     

     

    Responsibilities of planning and material accounting

    :


    (1) conscientiously abide by the state's financial policies, regulations and systems.


    (two) settle accounts and keep accounts according to the accounting rules.


    (three) responsible for the price adjustment of external materials and the adjustment of backlog materials.


    (four) to accept the material plan of each unit, to keep records, to collate and archive, to summarize the material requirements, to indicate the time needed to establish, and to set up the required amount of accounts. To grasp the resources and balance, timely submit the application plan for the material plan, and to provide and specify the technical requirements; the material plan of the whole project requires that the above work be done in two days within a week, and report to the chief of the Department in writing.


    (five) fill in the check list of incoming goods, and check the contract number, name, specification, type, quantity, unit price and total price in detail. If the credentials of odometer, pound code sheet, checklist, certificate, certificate of quality, certificate of consignment, insurance list, receipt and so on are all complete, check with the storehouse, check the acceptance situation, there is a problem to refuse payment, and immediately contact with the supplier, and the goods can not be paid until they arrive.

    Only after acceptance of all the indicators is acceptable, can the inspection documents be filled and the accounts paid.


    (six) according to the material plan of the project, according to the project schedule, the quota will be issued. If the plan is changed or replaced, it must be signed by the technical department and the engineering supervisor.

    In addition to the material requisition for infrastructural projects, other production, maintenance, units and individual pfer materials must be approved and signed by the section chief, and the internal materials of the infrastructure must be signed by the director.


    (seven) from 26 days to 3 days per month, we will input the receipts, requisition lists and allocation documents to the computer, and report the income, consumption and inventory of the materials to the school finance.

    All statistical reports should be reported before 3 days of each month. The number must be accurate and the time should be timely.

    Before 10 every month, report the financial statements of last month to the school finance section and supply section chief.


    (eight) use computers to set up the consumption ledgers and inventory dynamic tables of individual engineering materials. After the completion of the single project, the materials consumption statement of the project should be printed in time and reported to the budget section. The inventory dynamic report will be reported to the chief of the Department and the warehouse 5 days before the end of each month.


    (nine) other temporary tasks assigned by the completion office and the branch leaders.

    • Related reading

    Basic Accounting Knowledge: After Balance Sheet Events

    Accounting teller
    |
    2010/12/24 11:35:00
    70

    Accounting Basis: Drawer

    Accounting teller
    |
    2010/12/24 11:34:00
    47

    會計基礎知識:內部轉移價格

    Accounting teller
    |
    2010/12/24 11:33:00
    53

    會計基礎知識:內部結算

    Accounting teller
    |
    2010/12/24 11:31:00
    41

    Financial Terms: Comprehensive Leverage

    Accounting teller
    |
    2010/12/24 11:30:00
    43
    Read the next article

    How Long Does It Take To Handle Trademark Registration And Business License?

    According to the provisions of the trademark law, the validity period of a registered trademark is ten years, counting from the date of approval. Six months before the expiry of the validity period, the renewal and renewal fee can be renewed, and the validity period of each renewal is still ten years.

    主站蜘蛛池模板: 男人团vip每日更新番号库| javaparser日本高清| 久久久久女教师免费一区| 99精品全国免费观看视频| 男男全肉高h视频在线观看 | 观看国产色欲色欲色欲www| 日韩亚洲翔田千里在线| 夜夜夜夜猛噜噜噜噜噜试看| 免费日产乱码卡一卡| 一区在线免费观看| 男生和女生在一起差差的很痛| 天天综合天天综合| 国产jizzjizz免费视频| 九九电影院理论片| 韩国中文字幕电影| 拍摄直播play文h| 另类欧美视频二区| www.成人在线| 永久不封国产毛片AV网煮站| 国产美女久久精品香蕉69| 全彩acg本子| 99国内精品久久久久久久| 欧美视频自拍偷拍| 国产理论在线观看| 久久国产午夜一区二区福利| 色av.com| 婷婷久久香蕉五月综合| 亚洲综合欧美日韩| 色吧首页dvd| 日韩制服丝袜在线| 啦啦啦资源视频在线完整免费高清| а√天堂中文资源| 残虐极限扩宫俱乐部小说| 国产精品一区二区久久不卡| 久久福利视频导航| 精品国产福利在线观看| 在线观看免费视频一区| 亚洲一级理论片| 视频在线免费观看资源| 好好的日视频www| 亚洲国产精品综合久久网络|