• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Chinese And Foreign Contract For Assembling Parts Supplied By Customers

    2011/1/6 11:35:00 37

    Chinese And Foreign Contract For Assembling Parts Supplied By Customers

    Party A: China Ltd.


    Address: telephone, cable, telephone, telephone, telephone, telephone, telephone and telephone:


    The legal representative is: the position of the people's Republic of China.


    Party B: China, China, Hong Kong, Macao, China, Hong Kong and Macao.


    Address: telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


    The legal representative is: the position of the people's Republic of China.


    The two parties have signed the contract through friendly consultation on the basis of equality and mutual benefit in order to carry out the assembly business.


    Article 1 assembling project


    Party B shall provide Party A with the necessary spare parts for assembling the products of the company, and the products will be delivered to Party B.


    Second quantity and time of delivery and processing of finished products


       Party B During the month from January to September, the company will provide the Party A, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, and a port, or a station, to Party A, and deliver them to Party A, and deliver the finished products to the port (or the station) in batches and deliver them to Party B (or station) separately. Will be in the year of


    Third processing fees


    Party A shall assemble the processing fee for Party B, and each piece (or set) shall be counted as RMB.


    Fourth payment methods


    Party B shall deliver the loose parts which are not priced to Party A, and the processing fee shall be paid by Party B to Party A at sight.


    Fifth factories expert Technical training


    According to the actual needs, Party B has the obligation to dispatch experts to Party A and to train the necessary technical personnel for Party A, the number, time, tasks and cost burden of the factory experts and trainers.


    Sixth freight and insurance premiums


    Party B shall be responsible for Party A's freight and insurance premiums, and Party A shall be responsible for transporting the finished products to Party B's freight and insurance premiums. For the transportation insurance of finished products, Party A shall cover all risks and war risks (such as land transportation insurance on land transportation insurance) on the basis of the cost of spare parts plus freight, insurance and processing charges. During the period of assembly, Party A is responsible for insuring against fire risks.


    Seventh quality tests


    (1) Party A shall, after receipt of the parts, check its specifications and quality according to the technical standards provided by Party B. If Party B finds that the specifications and quality of the parts supplied by Party B are not up to the technical standard or the quantity is insufficient, Party B shall be responsible for the replacement or supplement of the inspection reports submitted by Party A to Party B.


    (2) after receiving the finished products of Party A, Party B shall inspect the goods according to the agreed standards of acceptance by both parties. If Party A fails to cause quality problems due to improper equipment, Party B shall submit the inspection report to Party A, and Party A shall be responsible for repairing or reparation.


    Eighth force majeure


    Due to war and serious natural disasters and other human irresistible incidents agreed by both parties, when a party fails to fulfill the contract, the party in case of such accidents should inform the other party of the accident as soon as possible and negotiate with the other party to extend the time limit for the execution of the contract. No compensation shall be made for the losses arising from the other party.


    Article 9 Liability for Breach of Contract


    Any party who fails to fulfill the terms of the contract and causes the other party to suffer economic losses must bear the liability of compensation, and the injured party shall have the right to impose a fine of RMB.


    The tenth arbitration


    During the execution of the contract, if there is any dispute, the two parties should resolve them in a friendly negotiation. If the case can not be settled, it shall be submitted to the arbitration agency of the Chinese arbitration agency for arbitration. The arbitral award is final. The cost of arbitration shall be borne by the losing party.


    Eleventh guarantees


    In order to ensure that both parties perform the contract and pay the penalty or compensate for the loss in time, the parties shall provide each other with the letter of guarantee issued by their respective banks.


    Twelfth transfers


    The rights and obligations specified in this contract shall not be transferred to any third party without mutual consent.


    The thirteenth contract is in two copies. It is signed in the name of the letter, and each party holds one copy, which is equally authentic.


    Party A: Party committee, Party committee, Party committee, Party committee, Party committee,
    Delegate: the representative of the Chinese people's Republic of China.
    The moon is full of the moon.
    • Related reading

    System Engineering Contract

    Contract template
    |
    2011/1/6 11:33:00
    44

    Contract For Feasibility Study Of Construction Projects

    Contract template
    |
    2011/1/6 11:31:00
    43

    Integrated Kitchen Production Contract

    Contract template
    |
    2011/1/6 11:29:00
    57

    Repair And Repair Contract

    Contract template
    |
    2011/1/6 11:26:00
    35

    Criminal Principal Agent Contract

    Contract template
    |
    2011/1/5 13:52:00
    86
    Read the next article

    Shoe Company XTEP Holds Annual Commendation Conference And New Year Party

    On the evening of December 31, 2010, "XTEP group 2010 annual summation and commendation conference and" let us gather together "2011 New Year's Eve party is held in Olympic Garden sports center.

    主站蜘蛛池模板: 亚洲国产精品成人综合久久久 | 57pao国产成永久免费视频| 动漫美女被到爽流触手| 免费无遮挡肉动漫在线观看| 亚洲综合伊人久久大杳蕉| 亚洲最大中文字幕| 久久精品国产久精国产| 一本大道AV伊人久久综合| 777精品成人影院| 99久久国产宗和精品1上映| 全黄大全大色全免费大片| 蜜桃视频一区二区三区在线观看| 黄瓜视频在线观看网址| 成人免费视频69| 精品无人乱码一区二区三区| 欧美精品免费在线| 欧美人与动性行为网站免费| 日本特黄特色aa大片免费| 日本国产中文字幕| 成全高清视频免费观看| 成人五级毛片免费播放| 女人张开腿让男人插| 国产欧美国产精品第一区| 又大又硬又黄的免费视频| 亚洲国产欧美另类va在线观看 | 亚洲成AV人片在线观看ww| 亚洲国产精品激情在线观看| 久久久久人妻精品一区三寸| Av鲁丝一区鲁丝二区鲁丝三区| 欧美色图一区二区| 男女啪啪高清无遮挡免费| 日韩欧美一区二区三区免费看 | 中文字幕理论电影理论片| 一级做a免费视频观看网站| 波多野结衣xfplay在线观看| 精品国产高清久久久久久小说 | 香港三级电影在线观看| 精品国产亚洲一区二区三区 | 精品久久亚洲中文无码| 琪琪色原网站在线观看| 欧美成人观看免费完全|