• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    How Did Wenzhou Shoes Come Out?

    2008/7/28 0:00:00 10284

    Wenzhou Shoes

    In 2006, Wenzhou produced 1 billion 200 million pairs of leather shoes, 365 days a year, and 3 million 290 thousand pairs of shoes per day.

    So how did Wenzhou shoes come out?

    Recently, the reporter went to AOKANG production workshop for a visit. Unexpectedly, the birth process of a pair of shoes was so complicated.

    It is the complicated process and standard process that provides a guarantee for the quality of Wenzhou shoes.

    Section 1.

    Knowledge of leather.

    A cow skin, buttocks and back is the best, used as the top of the shoe and the head row. The axillary is the worst.

    2.

    Cut the material.

    According to the different standards and requirements, use the template to draw out the shape of the round bar, the chicken heart, the back row, the side row, the tongue, the horizontal bar and so on.

    3.

    Cutting.

    Use the punching machine to cut the finished parts one by one.

    Pay attention to the same position, the same direction and the same angle.

    4.

    Batch.

    Evenly cut the edges of the leather parts with different shapes.

    5.

    Inspection.

    Check whether there are any defects in each piece of leather, such as blood bars, skin scars, and so on.

    In this process, all parts outside the sole are sewn and assembled by a high head car. For example, sewing, sewing, packing and so on, there are 20 processes in general.

    Molding line 1.

    Soak chemical skin.

    A material used to soak the pads on the heel with disinfectant.

    2.

    Put the main heel.

    The material inside the heel.

    Stereotype.

    3.

    Let's play in Baotou.

    Objective to establish the main root.

    4.

    The side line.

    Add up front, stitch up, 5.

    Main and stereotyped.

    Use the main and setting machine.

    6. trim Lippi.

    Remove some unnecessary corners so that they can be sticky.

    7.

    Brush white glue.

    The purpose is to make the soles and the upper sides be able to bond.

    8.

    The front gear is clipped.

    Make the shape of the desired shoes.

    9.

    Pull the bag.

    In the middle part, it is necessary to repair the defects in the front parts.

    10.

    The back machine heels.

    Make the heel set.

    11.

    Beat your shoes.

    The head shape that hammers the leather shoes.

    Sharp head or round head, look here.

    12.

    Heat setting.

    Through the vacuum sulfur tank, heat bake.

    13.

    Packing feet.

    Pull out the nails in the cart section, remove the excess corners and trim the front work.

    14.

    Wash sole.

    Wash your shoes and keep them in reserve.

    15.

    Grinding wheel.

    Remove impurities and pores and smooth edges.

    16.

    Decontamination.

    Decontamination with sole treatment agent.

    17.

    Shoe upper shoe brush.

    Prepare for bonding.

    18.

    Brush the glue two times after the oven.

    19.

    Double bottom.

    Stick to the sole.

    20.

    Press.

    Pressurize, more stereotyped.

    21.

    Freezer.

    Speed up glue condensation and enhance firmness.

    22.

    Pull out the last.

    Take out the model.

    23.

    Touch nails.

    Check it again and clear the missing nails.

    24.

    Pads.

    Put in different sizes of insoles.

    25.

    The upper is sprayed.

    The blaster sprayed.

    26.

    Polishing.

    Polishing machine polishing.

    27.

    Check before acceptance.

    Quality Management Department sampling inspection and acceptance.

    28.

    Add the number sticker.

    For example, what materials, colors, codes and so on.

    29.

    Packing.

    Packing, shipping.

    How long does it take to produce a pair of shoes?

    A production line produces about 1000 pairs of shoes a day, 10 hours a day, and an average of 36 seconds can produce a pair of shoes.

    Quality control: source control, process monitoring, and results reverse tracking 1.

    Operate strictly according to the operation standard book.

    The operator of each process is the inspector of the previous process.

    2.

    Product sampling inspection.

    3.

    Analysis and summarize problems of returned shoes.

    4.

    Process monitoring.

    Standards are in place.

    5.

    Analyze the market complaints, feedback the analysis results to the production department, and improve the process.

    • Related reading

    Government Encourages Dongguan'S Processing Trade Enterprises

    Industry standard
    |
    2008/7/26 0:00:00
    10393

    Shoe Manufacturers Should Place Safety In The First Place

    Industry standard
    |
    2008/7/26 0:00:00
    10250

    Technological Secret Warfare Of Chinese Olympic Uniform

    Industry standard
    |
    2008/7/25 0:00:00
    10245

    New Technology Attaching Body Flying Powell Running Shoes

    Industry standard
    |
    2008/7/25 0:00:00
    10310

    Nike PK ADI Sports Shoes Technology And Innovation

    Industry standard
    ADI
    |
    2008/7/24 0:00:00
    10432
    Read the next article

    Search For Fashion Items In Nanchang

    主站蜘蛛池模板: 岳又湿又紧粗又长进去好舒服| yw在线观看成人免费| 91香蕉视频直播| 激情综合一区二区三区| 无遮挡动漫画在线观看| 国产在播放一区| 久久婷婷久久一区二区三区| 91网站网址最新| 最新欧美精品一区二区三区| 国产日韩欧美亚欧在线| 亚洲av无码专区在线播放| 欧美交换性一区二区三区| 波多野结衣巨女教师6| 天堂在线观看视频| 午夜视频1000部免费看| 久久精品99国产精品日本| 18国产精品白浆在线观看免费| 欧美日韩一区二区视频图片| 女人18毛片a级毛片| 啊灬啊别停灬用力啊老师在线| 久久精品国产精品青草| 香港三级电影在线观看| 杨晨晨脱得一二净无内裤全身| 国产日韩精品在线| 久久综合丝袜长腿丝袜| 超碰色偷偷男人的天堂| 日韩三级电影免费| 国产欧美久久一区二区三区| 久久精品国产亚洲av成人| chinese麻豆自制国产| 欧美日韩亚洲综合| 国产电影入口麻豆| 亚洲人成网亚洲欧洲无码| 800av在线播放| 污污视频网站免费观看| 国产精品久久久久鬼色| 亚洲国产日产无码精品| 4480新视觉yy理论片| 最新国产中文字幕| 国产AV人人夜夜澡人人爽麻豆| 一二三四视频社区在线|