Equipment Repair Contract
The following terms are hereby negotiated through the amicable negotiation between the company and the company (hereinafter referred to as the ordering party) and through friendly negotiation.
The first definition
The "acceptance manual" refers to a document provided by the contractor and confirmed by both parties for the inspection equipment to be in conformity with the technical specifications and the specified data standards.
"Specified data" refers to the drawings, data and other information necessary for the implementation of this agreement related to this system.
"Defects or defects" refers to the equipment (structure or performance) that does not meet the relevant requirements of the acceptance manual.
"Site acceptance" is the final acceptance of the equipment repaired by the designated manufacturer according to the acceptance manual.
"Technical specification" means schedule A of this agreement.
Second repair items
Project content
The performance of the equipment must comply with the specified performance, meet the specifications of technical specifications and data, and submit all applicable, necessary drawings, data and other technical information. The Contractor shall accept the necessary supervision and inspection of the contractor during his work.
The Contractor shall prepare and submit 2 copies of the draft acceptance manual for the given supplier before September 2002. The authorized party shall consider and agree to the acceptance manual within the day.
The provisions of this Agreement shall be inconsistent with the provisions of the annex, subject to the provisions of this agreement. If the inspection manual is inconsistent with the technical specification or the specified data, the technical specification and the specified data shall prevail.
Third repairs
Fourth payments
After receiving the invoice from the contractor, the ordering party must pay the contractor the following time limit:
After the equipment is repaired, the vehicle must be paid 320 thousand yuan once a month after acceptance.
Fifth delivery and acceptance
The Contractor shall complete the repair and commissioning work of the equipment before November 25, 2002, and complete the inspection stipulated in the acceptance manual. At the same time, the Contractor shall sign the equipment acceptance document and prove that the inspection has been completed. The acceptance documents should be marked with the defects that both parties agree and should be corrected by the Contractor within the agreed time period.
Site acceptance should take place in November 26, 2002.
Sixth changes
Any changes to the main contents or schedules of this contract shall be made in writing from the date of entry into force of the contract. Details shall be made of the changes in the specifications, prices, performance, design, date of acceptance, the replacement performance of the delivered or ready to deliver spare parts, and other important matters of this agreement, and shall be signed by both parties.
In order to repair defects or improve equipment, the contractor may make minor changes or corrections to the technical specifications, provided that such changes do not seriously affect the total purchase price, functional characteristics, performance and replacement performance of spare parts.
Seventh guarantees
The contractor will not guarantee that the equipment will not meet the technical specifications due to defects in the material and process of the equipment and design imperfection.
From the date of acceptance of the equipment and parts, if the failure occurs within six months, the Contractor shall be responsible for the replacement or repair within 7 days from the receipt of the notice of the notifying party, and the expenses incurred therefrom shall be borne by the contractor.
If the Contractor fails to fulfill the above warranty, he shall bear all losses arising from the contractor.
Eighth others
This contract is a complete agreement between the parties hereto. All statements, negotiations, letters, commitments, agreements, consultations and contracts made by the previous two parties or their agents concerning any matter or thing that are applicable or involving the contract shall be revoked, whether written or oral.
Contractor party
Specific date
- Related reading
- Industry Overview | 2019 Beijing Fashion Week September Curtain Opening, There Will Be More Than 200 Brands Gorgeous Appearance.
- Industry Overview | The Jiangsu Provincial Market Supervision Bureau Sampled 100 Batches Of Children's Shoes With A Pass Rate Of 91%.
- Industry Overview | Cotton And Hemp Business Mode Change, Spot Inventory Pressure Greater
- Industry Overview | India Association Calls Cotton Yarn Into Subsidy Scheme
- Industry Overview | American Businessmen Have Joined In A Massive Protest Against Tax Increases: Tariffs Eroding Employment Growth.
- Popular this season | 2020 The Most Popular Printing Is To Wear Super Clean.
- Fabric accessories | Sheng Hong Group Miu Hangen: The Industry's Ambition Of Textile Giant
- Fabric accessories | Focusing On The Two Integration Conference Of Textile Industry In 5G Era To Explore New Mode And New Thinking
- Industry Overview | Focusing On The Two Integration Conference Of Textile Industry In 5G Era To Explore New Mode And New Thinking
- Industry Overview | Simple Elements Highlight Personality Design, 2019CICP Highlights Take The Lead.
- Proactive Fiscal Policy Is Costly But Worth Paying.
- 三鹿牌商標及12項專利技術撤拍
- Procedures For Registration And Examination Of Foreign Invested Enterprises In Shanghai
- Complete Baggage Handbook
- Etiquette And Matters Needing Attention In Foreign Affairs
- Code Of Workplace Etiquette In The Office
- Joint Venture Contract Model
- Agreement On Equity Pfer Of Limited Liability Company
- Model Contract For Foreign Equity Pfer
- Marketing Strategies That Customers Can'T Refuse