• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Libya Lost Or Exceeded Expectations

    2011/3/26 10:23:00 129

    Libya Enterprises China

    In from

    Libya

    After the smooth evacuation, China

    enterprise

    The most worrying thing is still happening.


    In March 25th, the reporter learned from an insider in Gezhouba Dam group that in the afternoon, Sahara Bank of Libya issued a letter of "advance payment letter of guarantee" to some Chinese enterprises, and the claims amount for each enterprise amounted to several hundred million yuan.


    "After the withdrawal of overseas Chinese, what we are most worried about is this matter, which is worse for enterprises."

    Beijing Fujian Hong Kong Industrial Group (hereinafter referred to as "Hong Fujian") deputy general manager of the International Engineering Department Liao Liying told reporters.


    In March 22nd,

    Ministry of Commerce

    Spokesman Yao Jian said at a regular news conference that the turmoil in Libya had caused a considerable impact on Chinese funded enterprises.

    But at present, the loss of Chinese enterprises will exceed the previous expectations.


    According to statistics from the Ministry of Commerce, there are a total of 50 large projects under construction in Libya, involving a total sum of $18 billion 800 million.

    At present, the Ministry of Commerce has not yet finished the assessment of the loss of overseas assets by Chinese enterprises in Libya, but the collection and collation of Assets Preservation data of most enterprises has been basically completed.


    The more you work, the greater the loss.


    According to the SASAC statistics, the investment of Chinese enterprises in Libya is mainly concentrated in the field of infrastructure.


    Liao Liying told reporters that the greater the amount of damage, the greater the loss, for the infrastructure contractor going to Libya.

    That is to say, the larger the contract amount is, the smaller the economic loss will be.


    Generally speaking, the payment method of project contract funds is to pay according to the progress of the project, plus 15% of the advance payment.

    Liao Liying told reporters that most contractors can get 15% advance payments, and some enterprises pay more in advance; while owners pay for progress payments, they generally need 60 to 90 days of audit.


    Take Fujian for example, when it withdrew from Libya, it completed 36% of the total project. Libya has already paid 15% advance payments and 15% progress funds, totaling about 1 billion yuan, and 660 million yuan of accounts receivable has not been recovered.


    The so-called "advance payment" means that before the project starts, the owner will pay the Contractor's engineering materials in advance according to a certain proportion of the total cost of the project, which is mainly used to purchase materials and equipment needed for the project.


    A project contractor told our reporter that although the enterprise can get some advance payment, the advance payment is usually deducted from the project progress payment according to the progress of the project every month, plus the progress payment will normally be delayed for 3 months or even half a year. Once the project is stopped due to uncontrollable factors, the contractor will lose more quickly.


    "If the construction progress is less than the proportion of the advance payment, it may temporarily cover the loss part."

    Liao Liying said.


    A person familiar with the matter told reporters that in the Chinese enterprises contracted for capital construction projects in Libya, the construction progress of the three companies, namely, Hong Fujian, Beijing construction, and Chinese construction companies, was the fastest, exceeding 30%.


    Among them, China's construction projects are currently government nationals housing projects, the scale of the project is 20 thousand sets, the total amount of the contract is about 17 billion 600 million yuan, the construction period is 40 months, and the project has completed nearly 50% of the project.


    China railway construction is one of the largest investment enterprises in Libya, with a total investment of US $4 billion 237 million.

    Before the evacuation, the progress of China railway construction project has exceeded 15%, and the total amount has reached US $684 million.


    It is understood that most of the contracts for Chinese enterprises in Libya have already started: in the total amount of $18 billion 800 million, the contract amount of $11 billion was signed before 2008 and 2008, and the amount signed in 2010 and 2009 was about 7 billion 700 million dollars.


    At present, the loss of Chinese enterprises in Libya is mainly concentrated in three aspects: first, the loss of fixed assets and raw materials; the two is the loss of accounts receivable which has not been recovered; and the three is the cost arising from the withdrawal of personnel.

    {page_break}


    Malicious claims


    However, Chinese enterprises have already received the "advance payment" of the owners of Libya.


    In March 25th, the reporter learned from an insider of the Gezhouba Dam group that Sahara Bank of Libya had made claims against the advance payment bond to Gezhouba Dam group, China Water Conservancy and hydropower construction group company, Hong Fujian and other companies, and must reply to the bank within five days.


    These people told reporters that the advance payment guarantee is still half a year before maturity, and now the bank claims in advance, which is a malicious claim.


    The so-called "advance payment guarantee" is a guarantee issued by the contractor to the owner through the bank to pay the owner's advance payment according to the regulations.

    According to the provisions of the guarantee, if the Chinese contractor fails to fulfill the contract, it will not refund the advance payment paid by the owner, the bank will refund the advance payment to the owner and claim the principal and interest of the prepayment to the contractor.


    The above Gezhouba Dam people said that Sahara Bank of Libya offered two options, one is to compensate the principal and interest of the advance payment, the two is to extend the prepayment guarantee period to December 31, 2012.

    "The two option is bad for us. Choosing compensation will further increase the loss, and not a small amount. If the guarantee is postponed, our risk and guarantee cost will be increased for another year."


    Liao Liying told reporters that the Sahara Bank of Libya claims about 400 million yuan to the macro Fujian workers.

    The Gezhouba Dam people refused to disclose the specific claim amount to our reporter, saying only that "the amount of compensation in Gezhouba Dam is the highest among claims enterprises."


    The person disclosed that the company has sought help from the Ministry of Commerce, hoping that the Libya bank will suspend the advance payment guarantee.

    However, even if banks stop making claims to Chinese enterprises, the credit record of Chinese enterprises overseas investment may be smeared.


    "This is a very urgent matter, and we have to make a decision within five days.

    We hope that the Ministry of Commerce will help us suspend the guarantee, while ensuring the credit rating of the enterprises, otherwise, it will cause potential adverse effects on the overseas business of the company. "

    The Gezhouba Dam people said.


    Risk of fermentation


    In addition to the loss of assets, the relocation of more than 30 thousand workers withdrawn from Libya and the increase in bad debts are also a major problem for Chinese enterprises.


    The reporter learned from the Beijing construction industry group that at present, most of the workers who were withdrawn from Beijing by construction workers in Libya are at rest, while a few management departments are placed in the domestic departments of the company.

    Liao Liying also confessed that the resettlement of more than 2000 workers withdrawn from Libya was difficult to solve. "Only the completion of the money let you go back to rest for the time being."


    In addition, due to the lack of building materials in Libya, which is unable to meet the engineering needs, contractors are generally required to purchase from countries other than Libya.

    The construction materials required by Chinese enterprises to contract projects are generally purchased from the mainland.

    Therefore, after the interruption of the Libya project, some enterprises failed to pay the upstream raw material suppliers on schedule, and many projects used subcontracting mode, which also led to the problem of triangle debts.


    In March 24th, Liao Liying told reporters that the company had lost more than 1 billion 100 million yuan in David Villa, and there was no way to recover the loss. It could only hope for the government.


    Of course, the damaged Chinese enterprises have also received some compensation from the insurance companies.

    Recently, the China Export and Credit Insurance Corp (hereinafter referred to as CITIC insurance) paid 162 million yuan or 48 million 150 thousand yuan to the Gezhouba Dam and China building materials import and Export Corporation respectively.

    This is the first insurance policy payment made by CITIC for the contracted project company in Libya.


     
    • Related reading

    International Morning News

    Global Perspective
    |
    2011/3/26 8:48:00
    71

    地震對日本紡織企業的一次考驗

    Global Perspective
    |
    2011/3/22 9:41:00
    141

    Vietnam'S Textile And Garment Industry Has An Average Wage Of 2 Million 200 Thousand Shields.

    Global Perspective
    |
    2011/3/21 15:35:00
    74

    China's "Labor Shortage" India Will Have The Opportunity To Replace China As The World's Factory.

    Global Perspective
    |
    2011/3/17 8:53:00
    68

    Hefei, China Accepts Japanese Textile Delegation'S Visit To China

    Global Perspective
    |
    2011/3/16 16:01:00
    89
    Read the next article

    Shoe Brand 361 Degrees For The First Time Sponsoring Chinese Football Tournament

    According to media related information Bao, recently, 23, 361 degrees (China) Co., Ltd. and Beijing Institute of Technology formally joined hands, Beijing Institute of Technology football team officially changed its name to the Beijing 361 degree college football team.

    主站蜘蛛池模板: jizz大全欧美| 亚洲精品国产高清在线观看| 久久久久久久久女黄9999| 一级成人a做片免费| 玖玖精品在线视频| 欧美一区二区三区久久久人妖| 国产麻豆剧传媒精品网站| 亚洲精品美女在线观看| 中文字幕久久久久| 翁止熄痒禁伦短文合集免费视频| 欧美亚洲国产精品久久高清| 好硬好爽老师再深点| 国产乱人伦偷精品视频不卡| 亚洲乱码一区二区三区在线观看| tube欧美69xxxx| 爽天天天天天天天| 少妇无码太爽了在线播放 | 国产18到20岁美女毛片| 亚洲不卡av不卡一区二区| 欧美日韩亚洲成色二本道三区| 最新黄色网址在线观看| 国内精品自产拍在线观看91| 午夜一级做a爰片久久毛片| 一个人免费观看日本www视频| 男人的天堂黄色| 岳的大白屁股光溜溜| 免费一级毛片无毒不卡| 91香蕉视频黄| 欧美videosgratis蛇交| 国产精品日韩专区| 亚洲精品无码久久久久久久| 67194熟妇在线观看线路| 男同免费videos欧美| 国产麻豆一精品一aV一免费| 亚洲gv天堂gv无码男同| 手机在线观看精品国产片| 欧美精品久久久久久久影视| 女同学下面粉粉嫩嫩的p| 亚洲欧美日韩综合在线播放| 99日精品欧美国产| 狠狠色综合网久久久久久|