• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Matters Needing Attention In The Process Of Shoe Adhesive Operation

    2012/8/26 13:11:00 17

    Shoe Adhesive OperationFollow Up AgentDrying Temperature

      

    Adhesive operation of shoemaking

    Matters needing attention in process


    1. before processing, the material, material and treatment agent should be fully recognized.


    2. choose suitable glue according to different materials and combinations. Different series of agents should be treated with different series of treatment agents.


    3., strive to be completely uniform, and replace gauze and cotton regularly to ensure the processing effect.


    4. after the drying agent is fully dried, it is then glued and glued evenly to avoid accumulation of glue and thickness.


    5. rough surface material, suitable for high viscosity and high viscosity at one time.

    Following agent

    For the two time, it is necessary to dry for the first time and then to glue for two times.


    6. when the agent is added to the hardening agent, the general ratio is 3-5%. As the proportion of the hardening agent is large, it is easy to sink to the bottom, so the right and left sides are fully stirred to ensure uniformity.


    7. hardener is very easy to react with air moisture. After use, it should immediately tighten the mouth to avoid deterioration, and then affect the effect.


    8. hardener is mainly composed of polyisocyanate and organic solvent. Polyisocyanate is easy to react with various substances. Therefore, it should avoid contacting with human body. If it is touched, it can be cleaned with plenty of water.


    9. light coloured material, if you want the appearance, you can add light coloured hardener (such as AD652W, etc.) in addition to the light coloured agent.


    10. then nylon or rubber material, hardening agent, please use DESMODUR RF (650BF or 651RF).


    11. after gluing,

    drying temperature

    It should be set at 55~65 degrees. Drying time should be 5~8 minutes. After gluing and gluing, avoid blowing or placing in wet place, resulting in surface crust or surface mist, resulting in subsequent bad.


    12. choose the best time for sticking, one alignment, try to avoid rip up and fit again.


      

    • Related reading

    Key Points In The Field Of New Textile Machinery

    Shoemaking technology
    |
    2012/3/11 17:19:00
    19

    空調鞋如何降低鞋內溫度

    Shoemaking technology
    |
    2012/3/8 14:04:00
    29

    鞋材為何采用負離子技術

    Shoemaking technology
    |
    2012/3/8 13:55:00
    3

    The Main Direction Of Sewing Equipment Development Is Analyzed Again.

    Shoemaking technology
    |
    2012/3/8 11:29:00
    37

    Shoes With Built-In GPS Will Soon Be Available In The US.

    Shoemaking technology
    |
    2011/10/27 15:23:00
    41
    Read the next article

    Introduction Of Injection Molding Technology For Shoemaking Material TPR

    TPR injection molding process has high requirements for additives and molding temperature. In the process of injection molding, the accuracy of temperature setting is the key to the appearance and performance of the products. Here are some suggestions on how to control the temperature of TPR injection molding operation.

    主站蜘蛛池模板: 亚洲精品国产精品国自产观看| 欧美亚洲国产成人综合在线| 少妇高潮喷潮久久久影院| 在线一区二区三区| 亚洲精品老司机| 99视频在线观看免费| 波多野结衣一二三区| 波多野结衣第一页| 欧洲美熟女乱又伦免费视频| 国产欧美久久久精品影院| 久久国产高潮流白浆免费观看| 被男按摩师添的好爽在线直播| 成人爱做日本视频免费| 免费做暖1000视频日本| 91天堂国产在线在线播放| 桃子视频在线官网观看免费| 国产午夜鲁丝片AV无码| 中文字幕无线码中文字幕免费| 被夫上司持续入侵大桥未久 | 一区二区三区杨幂在线观看| 男女做www免费高清视频| 在打烊后仅剩两人接档泡面番 | 全彩里番acg里番本子| 91亚洲国产成人精品下载| 最近高清中文在线国语字幕| 国产乱理伦片a级在线观看| 一级毛片在线完整免费观看| 爆乳熟妇一区二区三区霸乳| 国产精品日韩欧美一区二区三区| 久久国产精品免费观看| 男人j放进女人p全黄| 国产成人综合美国十次| 一级日本强免费| 欧美三级香港三级日本三级| 啊用力点国产嗯快在线观看| 中国少妇无码专区| 欧美高清视频www夜色资源| 国产凌凌漆国语| CAOPORN国产精品免费视频| 99热这里只有精品66| 欧美成人精品第一区|