• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Yi Shi Da Investment Projects Dragged On And Dragged Down By Pollution From Partners.

    2013/10/12 12:44:00 28

    Yi ShidaPollutionIPO

    < p > Listing 3 years or less a href= "http://news.sjfzxm.com/news/list.aspx Classid=101112107105" > Yi Shi Da < /a > besides the change of performance and stock price, the core recruitment project of the company at the time of IPO has been dragged on, and has not yet achieved the expected benefit.

    < /p >


    The reason why "P" is so, or has been dragged down by the unsettled pollution problem of the India Cements Limited of the Hubei century new peak, Lei Shan India Cements Limited (hereinafter referred to as "new century peak"), and when Yi Shi Da was listed, it was not disclosed in the prospectus that the new century peak was polluted by the local villagers.

    < /p >


    < p > IPO raise investment project dragged on "/p >"


    < p > 2010, Yi Shi Da, who landed on the growth enterprise market, raised 825 million yuan of funds, of which more than 600 million yuan was raised.

    In the year of listing, Yi Shi Da achieved a net profit of 66 million 168 thousand yuan, an increase of 73.60% over the year before 2009.

    Unfortunately, Yi Shi Da's performance was not as good as a year later.

    In 2011 and 2012, the net profit of Yi Shi Da was 51 million 790 thousand and 600 yuan and 14 million 343 thousand and 900 yuan respectively, down 21.73% and 72.30% respectively.

    By the middle of 2013, the net profit of Yi Shi Da was 12 million 314 thousand and 400 yuan, down 33.32% from the same period last year.

    < /p >


    < p > the stock market is also losing its strength.

    As of October 11th, the closing price of Yi Shi Da after the resumption of power was 28.18 yuan / share, compared with the 55 yuan / share issue price at the time of listing.

    < /p >


    Less than P, it is worth noting that Yi Shi Da's IPO core investment project has been dragging its feet and failed to achieve its expected revenue. This will be one of the reasons for the downturn in the company's listing.

    < /p >


    < p > public information shows that Yi Shi Da's < a href= "http://news.sjfzxm.com/news/list.aspx Classid=101112107107" > IPO < /a > recruitment projects are supplementary company working capital, Yi Shida Technology Park R & D center project and Hubei century new peak Lei Shan India Cements Limited contract energy management project (hereinafter referred to as "century new peak contract project").

    < /p >


    < p > according to the prospectus, the construction period of the century new peak contract project is one year, and the project reported in the 2010 annual report is scheduled to be used for June 1, 2011. In the middle of 2011, the company postponed the project construction until September 1, 2011. The 1# line and the 2# line of the new century peak contract project were basically completed. The company is preparing for the commissioning and networking.

    By the end of 2011, the company postponed the project construction until April 30, 2012, and said that all the 2 projects were equipped with grid connected generation conditions. The owners and item company were handling the grid connection procedures and solving the problem of cooling water shortage caused by continuous rainfall in Ezhou, Hubei.

    At the end of 2012, the company extended the new century peak contract project to January 1, 2013, and failed to achieve any benefit in the reporting period.

    < /p >


    < p > by 2013, Hubei Yi Shi Da, the main body of the contract for the implementation of the new century peak project, was simply cancelled, while the original assets of Hubei Yi Shi Da were absorbed and merged by Yi Shida's wholly-owned subsidiary, Shandong Shi Da.

    In the first half of 2013, the investment progress of the new century peak contract project was 94.23%, and not yet fully completed. The first half of the year achieved a profit of 1 million 850 thousand and 200 yuan, and the distance between the 37 million 357 thousand and 500 yuan business income and the 13 million 517 thousand and 600 yuan net profit annual benefit calculated in the prospectus seems to be very long.

    < /p >


    < p > pollution caused by partner pollution? < /p >


    < p > New Century peak is supervised by environmental protection bureau, < /p >.


    < p > so-called causality. The new century peak contract project is the core recruitment project of Yi Shi Da IPO. It has been dragged on for many years, or is dragged down by the pollution problem of the partner's new century peak.

    < /p >


    < p > according to the data of Ezhou Environmental Protection Bureau, the pollution problem existed in the cement production in the new century peak. It happened in Hongqiao village in 2007. Therefore, Ezhou Environmental Protection Bureau carried out investigation, handling, and supervision.

    In July 2012, the Hubei provincial environmental protection department again received the reflection of villagers in Hongqiao village. The Ezhou Environmental Protection Bureau organized the City Supervision Detachment on-site supervision personnel to go to the scene for investigation and treatment.

    According to the investigation, when the new century peak was built in the construction project of the 4000t/d dry rotary kiln production line, the government of the city of Hubei promised to remove the residents within the health protection distance. The EIA report of the project also requested this item, but it has not yet been implemented.

    The yellow village of Hongqiao village has a distance of 200 meters from the northwest factory boundary. The health protection distance has not reached the EIA requirement. The production of unorganized dust from the enterprise has a real impact on the living environment of the villagers.

    < /p >


    < p > by the end of 2012, the dust pollution problem of new century peak was supervised by the Ezhou Environmental Protection Bureau, and it was required to be completed before June 30, 2013.

    Up to the middle of 2013, although the dust noise pollution control of the Xinfeng peak was basically completed, the relocation was slow.

    < /p >


    < p > investors said that the contract for the new century peak project was built on the basis of the new century cement production line. The pollution problem based on the new century peak has been long-standing, and has been repeatedly complained by local villagers. Therefore, the new century peak contract project has not seen any benefit, or is being dragged down by the pollution problem of the new century peak.

    < /p >


    What P needs to point out is that when it was listed, Yi Shi Da did not disclose the pollution of the new century peak in the prospectus.

    < /p >


    < p > October 11th, the reporter contacted Yi Shi Da on the above issues. A staff member said that before the cooperation with the new century peak, the documents such as project approval and environmental impact assessment were complete, which belonged to normal investment, while the delay in construction period was affected by civil engineering or other factors. Moreover, the current a href= "http://news.sjfzxm.com/news/list.aspx Classid=101112107108" > cement market < /a > is not as good as before, and can not start at full load, thereby affecting the yield of the company.

    < /p >

    • Related reading

    Versace Versace Equity Acquisition First Phase Bidding Ended

    Listed company
    |
    2013/10/12 10:50:00
    22

    Versace Versace Plans To Finance Banks

    Listed company
    |
    2013/10/12 10:31:00
    18

    新野紡織特種紗項目2013年底投產(chǎn)

    Listed company
    |
    2013/10/11 14:22:00
    25

    Lafuma Runs Or Degenerates Calida Group Wants To Buy Majority Stock.

    Listed company
    |
    2013/10/11 10:35:00
    15

    Prada Handbag Has Been Growing Rapidly In China.

    Listed company
    |
    2013/10/11 10:26:00
    59
    Read the next article

    芭迪品牌深得國內(nèi)外女士們的信任及推崇

    芭迪時尚女鞋品牌加盟爭創(chuàng)財富新高度,芭迪patty時尚品牌不僅提供優(yōu)質(zhì)的產(chǎn)品,更提供超前的經(jīng)營模式,成為女鞋市場上一個亮點。這種獨一無二的創(chuàng)新營銷模式就是4S體驗?zāi)J剑丛谔峁┛钍骄喇a(chǎn)品的同時,免費為店鋪提供專業(yè)的鞋具保養(yǎng)設(shè)備.

    主站蜘蛛池模板: 婷婷久久久五月综合色| 日韩A∨精品日韩在线观看| 国产乱子伦农村叉叉叉| gogo全球高清大胆亚洲| 欧美一区二区三区在观看| 国产一卡二卡≡卡四卡无人区| 99热精品久久只有精品| 日韩在线高清视频| 人妻18毛片a级毛片免费看| 精品四虎免费观看国产高清午夜| 影音先锋亚洲资源| 亚洲专区区免费| 综合网小说图片区| 国产精品亚洲а∨天堂2021| 中国人观看的视频播放中文| 欧美性猛交xxxx免费看| 又紧又大又爽精品一区二区| 男女一进一出抽搐免费视频| 性xxxx黑人与亚洲| 亚洲av成人综合网| 男女很舒服爽视频免费| 国产午夜视频高清| 91香蕉视频成人| 成人精品一区二区不卡视频| 亚洲免费福利视频| 粗大黑人巨精大战欧美成人| 国产情侣91在线播放| 99久久免费精品高清特色大片| 日本一区二区三区四区视频| 亚洲妇女水蜜桃av网网站| 精品无码国产污污污免费网站国产| 国产福利在线导航| a级毛片100部免费观看| 日日夜夜嗷嗷叫| 亚洲伊人久久精品影院| 神马伦理电影看我不卡| 国产免费69成人精品视频| 2021国产精品露脸在线| 妖精的尾巴ova| 久久人人爽人人爽人人爽| 欧美夫妇交换完整版随便看|