• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    South China Textile Base Environmental Protection Facility Phase 1 Factory Building Will Be Built At The End Of July.

    2020/6/15 12:45:00 2

    South Hunan Textile Industry BaseInvestment

    On the morning of June 11th, the reporter learned from the Symposium of the first phase of the environmental protection facility Park of the South China textile industrial base that the first phase of the environmental protection facility phase project will be launched in the end of June, and the key infrastructure projects such as sewage treatment plants and cogeneration will be implemented simultaneously. The first phase of the enterprise standard workshop will be fully opened at the end of July, and will be injected into the 17 enterprises that have signed up. "This also marks a new substantive stage in the construction of the environmental protection facilities park. Changning has promoted the high quality development of the" 100 billion class "aircraft carrier in the South Hunan textile industry base with the most effective execution.

    The textile industrial base in southern Hunan is a key industrial project in Hunan Province, and also a key project for Hengyang to build 100 billion industrial clusters. The project is divided into two major parts: clothing production Park and environmental protection facilities park. Among them, the environmental protection facility project plans to invest 1 billion 500 million yuan, with a total construction area of about 394 thousand, including 355 thousand standard factory buildings, 1 planning and construction of sewage treatment plants, 1 central heating projects of heat and power cogeneration, 2 water washing plants, 2 printing and dyeing plants, 1112 sets of staff apartments, and 40 kilometres of Lingshui (double circuit) 40 kilometers water supply and drainage network project, and matching construction to drainage. Power supply, distribution, fire fighting, HVAC, square, greening and other infrastructure.

    At the symposium, the CITIC environmental technology team introduced the design concept, progress and current effect of the environmental protection facility phase 1 project, as well as the sewage treatment and cogeneration projects, and explained the issues of sewage discharge, steam demand and the entry of enterprises. The Design Institute of Hunan University and Hunan chemical engineering geological survey were also discussed. The hospital has respectively expounded the design of the drainage pipeline project and the geological survey of the environmental protection facilities.

    The first phase of the Marine Silk Road company, Guangzhou Guangying sci tech Textile Co., Ltd. and Zhongshan sunny Textile Co., Ltd. put forward opinions and suggestions on the plant area, storey height, gas consumption and water consumption. CITIC environmental technology team listened carefully to the representatives of the enterprises who signed the contract, and responded one by one. At the same time, the actual situation of these enterprises was thoroughly explored to facilitate the planning and design of sewage treatment plants and cogeneration.

    "We need unified planning, unified action, unified steps and unified requirements." Duan Ming, deputy mayor of Changning City, is determined to take the most effective execution, speed up the pace of action, ensure the implementation of project funds as soon as possible, push forward the implementation of various projects, and strive to be more thoughtful and perfect in detail, and make joint efforts to make the whole South Hunan textile industry base project bigger and stronger, and strive to become a benchmark for the textile industry in China and the world.

    • Related reading

    CIC Capital (600061):80 Billion Yuan Convertible Bond Plan Approved

    Fabric accessories
    |
    2020/6/15 12:43:00
    2

    Capital Investment (600061):2019 10 Rights And Interests Allocated 1.4 Yuan

    Fabric accessories
    |
    2020/6/15 12:43:00
    4

    Changshan North Ming (000158): Received Part Of The Land Compensation 300 Million Yuan.

    Fabric accessories
    |
    2020/6/15 12:43:00
    2

    *ST Jin Yu (000803): Progress In Tender Offer

    Fabric accessories
    |
    2020/6/15 12:43:00
    4

    Shanghai Sanmao (600689): Annual Report Push 10 Faction 0.13 Yuan

    Fabric accessories
    |
    2020/6/15 12:43:00
    2
    Read the next article

    CIC Capital (600061):80 Billion Yuan Convertible Bond Plan Approved

    In June 12th, 600061.SH announced that the company has received the following report from the China Securities Regulatory Commission recently.

    主站蜘蛛池模板: 国产va免费精品观看精品| 蜜芽国产尤物AV尤物在线看| 波多野42部无码喷潮在线| 天天综合网色中文字幕| 伊人久久大香线蕉综合电影网| 久久精品国产99久久99久久久| 欧美精品www| 日韩免费高清视频网站| 国产色综合久久无码有码| 午夜毛片不卡免费观看视频| 久久看免费视频| 韩国免费一级片| 无码国产精品一区二区高潮| 国产111111在线观看| 丁香花免费高清视频完整版 | 精品人妻中文无码av在线| 日本波多野结衣电影| 国产亚洲精久久久久久无码| 丰满老熟妇好大bbbbb| 老司机午夜在线| 好男人资源在线观看高清社区| 国产亚洲sss在线播放| 中文字幕日韩欧美一区二区三区| 黑人巨大白妞出浆| 日本一区视频在线播放| 吃奶呻吟打开双腿做受动态图| 一个人看的日本www| 美女扒开尿口让男人捅| 日本精品少妇一区二区三区| 国产三级在线电影| 一本色综合网久久| 没带罩子让老师捏了一节课| 国产精品亚洲一区二区三区在线 | 国产色婷婷精品免费视频| 亚洲国产成人一区二区精品区| 99热99在线| 欧美人猛交日本人xxx| 国产免费观看视频| 久久天天躁狠狠躁夜夜2020一| 国产精品午夜剧场| 扫出来是很污的二维码2021|