    Contract For Survey Of Construction Project

    2008/12/8 14:11:00 41868

    The construction unit (Jia Fang): it is the following:

    Address: the address of the telephone, the telephone code, the telephone and the telephone.

    The legal representative is: he is in charge of duty.

    Reconnaissance unit (Party B): it is located in the second part of the city.

    Address: the address of the telephone, the telephone code, the telephone and the telephone.

    The legal representative is: he is in charge of duty.

    In order to clarify the economic responsibilities of construction units and reconnaissance units, divide and cooperate, promote each other, and accomplish the investigation tasks of construction projects quickly and economically. According to the approved construction project plan, the two sides have fully negotiated the contract, so that both sides can abide by it.

      第一條 工程名稱、規(guī)模、投資額、建設地點________________________.

      第二條 勘察的范圍、進度和質量________________________.

      第三條 甲方的義務

    1. signing

    contract

    Party A shall submit to Party B a copy of the plan task document approved by the capital construction process, and submit a land approval document and a copy of the red line diagram for engineering geological investigation.

    2. signing

    contract

    Party A shall submit to Party B one of the topographic maps and architectural layout plans of the survey area agreed by the design unit and submit the survey technical requirements and drawings completed by the construction unit entrusted by the design unit and submit the time, schedule and quality of the submitted time to Party B.

    3. party a must do the work of water and electricity supply, leveling the road, cleaning the site and preparing materials for the site investigation before the month of the year.

    4. party a must complete the compensation procedures for land requisition, demolition, tree cutting, green seedling and other projects before Party B enters the scene in the year of the year.

    5. party a must be responsible for solving the conditions of Party B's reconnaissance personnel such as food and housing, office and so on.

    Party B shall be responsible for the cost of housing and housing for Party B's on-site reconnaissance personnel. If Party A arranges a guest house or hotel, the cost will be borne by Party A.

    The collective welfare facilities of the Party A (such as bathroom, hairdressing, medical treatment, etc.) shall provide convenience for Party B personnel.

    In the survey and construction, the workers, fuel materials, and the installation of life and heating in winter and the supply of coal and wood shall be supplied by Party A (the cost is borne by Party B).

    6. the pportation and labor costs of Party A's surveyors and reconnaissance machines entering the project area shall be borne by Party A.

    7. Party A shall not alter the investigation results document of Party B without authorization, nor pfer it to the third party for reuse.

      第四條 乙方的義務

    1. Party B shall carry out engineering survey, engineering geology and hydrogeological investigation work according to the existing standards, specifications and technical regulations, and submit the survey results according to the progress and quality stipulated in the contract.

    2. Party B shall enter the site investigation at the month of the year of the year of the year of the year of the year of the people's Republic of China.

    If Party B has more than 3 days' construction site due to climate or Party A's reasons, the construction period can be postponed.

      第五條 定金及勘察收費標準及撥付辦法

    1. the survey fee will be charged according to the standard of engineering investigation issued by the competent authority of the state. The total price will be estimated to be RMB yuan.

    In the days after the entry into force of this investigation contract, Party A shall pay to Party B a deposit equivalent to 30% of the survey fee, and the deposit shall be paid for the investigation fee after the contract has been fulfilled.

    If Party A fails to perform the contract, it has no right to claim repayment of the deposit. If Party B fails to perform the contract, it shall double the deposit.

    Party A shall pay Party B 30% of the survey fee after commencement of survey work. After the completion of all survey works, Party B shall submit party a reconnaissance report and drawings to Party A according to the stipulations of the contract and settle the project.

    The payment of survey fees is handled by the CCB for collection and acceptance.

    2. the fees for special projects (such as complicated geological conditions, high technical requirements, more than the current specifications, especially important, urgent, special requirements, especially small projects) shall be charged in accordance with the total cost of survey projects, which will be 20% to 40% of the survey fees.

      第六條 甲方的違約責任

    1. if Party A changes the plan or the information provided is inaccurate, or fails to provide reconnaissance, design necessary information or working conditions for investigation and design rework, stoppage, deactivation or modification design, Party A shall pay an additional fee according to the actual workload consumed by Party B. the investigation period will be postponed, and due to the responsibility of Party A, a major rework or redesign shall be made, and the additional time for the investigation will be increased and the duration of the investigation will be postponed.

    2. Party A shall pay liquidated damages to Party B in accordance with the provisions of the bank's delay in payment, if the party exceeds the time stipulated in the contract for payment of survey fees or deposits.

      第七條 乙方的違約責任

    1. Party B shall rework or cause losses due to poor quality of the survey. It should continue to improve the investigation and assume the economic and technical responsibility according to the losses caused. Party A can reduce or not pay the survey and design fees depending on the magnitude of the losses.

    2. if Party B fails to make a major quality accident due to investigation errors, it shall also pay compensation equal to the cost of investigation and design directly from the loss except for the cost of investigation and design.

    3. due to the delay in the provision of investigation documents by Party B, the time limit for the above investigation is more than ten days. Each delay shall be paid to Party A for the total amount of the total cost of the project investigation fee.

      第八條 糾紛的處理

    In the event of a dispute in the execution of this contract, the two parties shall settle the dispute in time.

    When negotiations fail, both sides belong to the same department, and the higher authorities shall mediate. If mediation fails, or if they do not belong to the same department, they shall be settled according to the following (1) way: (I) apply for the arbitration of the Arbitration Commission; (2) to prosecute the people's court.

      第九條 其他約定

    It is very popular.

    The contract shall be effective after the signature of both parties.

    If there is anything unsettled in this contract, it is necessary to make a supplementary agreement through mutual consultation.

    The supplementary agreement has the same effect as this contract.

    The contract is in two originals, one for each party, one copy for the contract, and one for the Planning Commission, the Construction Committee and the China Construction Bank.

    Keep one copy each.

     

    Construction unit (Jia Fang):

    The representatives are: the people, the people and the people.

    In the year of the year

    Reconnaissance unit (Party B):

    The representatives are: the people, the people and the people.

    In the year of the year


    • Related reading

    Contract For Patent Assignment

    Contract template
    |
    2008/12/8 14:08:00
    41871

    Contract Specifications For Futures Exchanges In China

    Contract template
    |
    2008/12/8 14:06:00
    41866

    Legal Opinion On Rights Issue Of Listed Companies

    Contract template
    |
    2008/11/15 14:47:00
    41893

    Nominal Shareholder Agreement

    Contract template
    |
    2008/11/15 14:46:00
    41895

    Business Account Management Service Agreement

    Contract template
    |
    2008/11/15 14:42:00
    41930
    Read the next article

    Contract For Assignment Of The Right To Apply For Patents

    Project Name: technical assignee: (official seal) (Party A) technical pferor: (official seal) (Party B) intermediary: (official seal) contract registration authority: date of signing: date of contract execution: date from month to year.

    主站蜘蛛池模板: xx视频在线永久免费观看| 亚洲日本一区二区三区在线不卡 | 高清欧美性猛交xxxx黑人猛交| 欧美日韩生活片| 国产精品无码免费视频二三区| 亚洲欧洲无码av不卡在线| 7777精品久久久大香线蕉| 欧美日韩一区二区三区四区| 国产精品自产拍在线观看| 亚洲小视频在线观看| 2022国产在线视频| 欧美丝袜高跟鞋一区二区| 国产男女猛烈无遮挡免费视频网站| 亚洲AV无码乱码在线观看代蜜桃 | japanese国产在线观看| 特级毛片a级毛片在线播放www| 夜夜爽夜夜叫夜夜高潮漏水| 亚洲福利电影在线观看| 717午夜伦伦电影理论片| 欧美三级香港三级日本三级| 国产成人精品曰本亚洲78| 久久国内精品自在自线400部o | 一级毛片一级片| 狠狠躁夜夜躁av网站中文字幕 | 国产妇乱子伦视频免费| 久久久久免费精品国产| 色噜噜视频影院| 好紧好湿太硬了我太爽了网站| 人妻少妇精品久久久久久| 777777农村一级毛片| 李莫愁好紧好湿好滑| 国产在线看片网站| 中文天堂在线视频| 爱情岛论坛网亚洲品质自拍| 国产综合色在线视频| 久草视频免费在线| 老熟妇高潮一区二区三区| 天天操天天干天天拍| 亚洲午夜无码久久久久| 谷雨生的视频vk| 女人与公拘交酡全过程i|