• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Adjustment Of Synchronous Belt Of Shoulder Pads

    2010/8/21 11:09:00 31

    Shoulder Pads

    With the increase of use time,

    Machine parts

    Wear is inevitable, especially the synchronous belt skidding, resulting in the machine can not be used normally.

    When the operator changes to the new synchronous belt, but because of the adjustment is not in place, it is easy to cause breakdowns, such as needle jumping, disconnection and no feeding. Therefore, the adjustment of synchronous belt is also the key to ensure the whole operation of shoulder pads.


    The structure of shoulder pads is basically the same as that of upper sleeves, but it is much more than that of upper sleeves.

    Cutter mechanism

    With the increase of use time, machine parts inevitably wear out, especially the synchronous belt skidding, causing the machine to be unable to use normally.

    If the operator changes to the new synchronous belt, but because the adjustment is not in place, it is easy to cause the breakdown of the needle jumping, disconnection and no feeding.


    To solve this problem, the following is a summary of the adjustment operation of the replacement of the synchronous belt of the shoulder pads by taking the 697 of the type of shoulder pad machine as an example for reference by colleagues.


    When the shoulder pads are replaced with the new synchronous belt, we can first hit the upper axle to the right. After installing the belt pulley, the upper axle can not move about and fix the upper shaft synchronous pulley. The wire pick rod is installed and placed in place, and placed in the pin rack (the needle slider should fall into the slot of the needle rack), then the needle rack block, the fixing block and the foot guide rail are installed.


    Secondly, connect the presser foot and the feed presser connecting rod, locate the upper shaft needle bar, the feed presser foot up and down movement and the positioning screw on the cutter driving cam, tighten the fastening screws; basically locate the pin cam to connect their respective connecting rods, and install presser feet, machine pins, needle bar covers, head side covers, belt pulley covers, synchronizer and so on.


    After installing the above components, you need to do the following

    adjustment

    :


    Adjustment of feeding of 1. needle and pendulum needle


    The correct timing of the machine needle and pin feeding is: when the feed is finished, the tip of the machine just leaves the pinhole of the lower feeding tooth and is in the same plane with the lower feeding tooth.

    Check the time phase of the feeding tooth and the machine needle, unscrewed the 3 screws to drive the cam, and turn the cam to the correct position, so that the needle is located in the center of the lower feeding tooth, then tighten the 3 screws of the driving cam.

    Improper adjustment will lead to faults such as the size of the needle, the tight bottom line and so on.


    Adjustment of cam driven by 2. and lower feeding teeth


    The correct time phase is: the needle descends to the bottom dead point, and the lower feeding tooth reaches the highest point.

    The upper and lower movements of the feed are controlled separately by the respective axes of the upper and lower axes, while the upper shaft has a positioning platform. When removing, the positioning screws must be removed and only the fastening screws are left.

    When adjusting the lower shaft cam, we can adjust the lower shaft synchronous pulley or directly adjust the cam. If the adjustment is not in place, there will be no feeding, bottom line start and so on.


    3. adjustment of feeding presser and presser presser foot.


    The upper and lower movements of the feed presser and the presser presser are controlled by the upper cam with the same cam (the cutter is driven by the cam).

    When the cam is installed, it can identify the positioning platform on the upper shaft. When the two presser work, the upper and lower switches are exchanged. The correct exchange phase is: the needle drops to the lower dead center, and the feed pressure foot also descends to the minimum, and the presser presser foot reaches the highest (the presser presser foot plate bottom is away from the needle plate 5mm).

    Loosening drives the first connecting rod screw on the cam, adjusts the exchange height of the two presser feet. If the adjustment is not in place, there will be failures such as failure of feeding or too small needle.


    Adjustment of 4. machine needle and rotary shuttle


    The correct hook time of the machine needle and the rotary spindle is that when the machine needle picks up, the spindle point is located along the needle thread hole of the machine, along the 1mm, loosening the two screws of the lower fan gear of the rotary spindle to adjust the hook time. (after adjusting the fastening screws of the first connecting rod shaft on the cam, adjusting the two corresponding six angle screws, the needle bar can be adjusted early or late).


    The left and right clearance between the spindle and the needle is 0mm to 0.01mm. The screws of the rotary spindle base are adjusted to adjust the left and right movements of the pendulum frame, and the needle can touch the needle slightly. If the adjustment is not in place, there will be a breakdown such as jumping and breaking.


    In addition, attention should be paid to the wear of the shuttle spindle when adjusting. (the new shuttle point is about 2mm with the supporting line hook). If the wear is serious, the new shuttle should be replaced in time.

    • Related reading

    Review Of Viscose Market This Week And Analysis Of Future Market

    Supporting resources
    |
    2010/8/21 11:07:00
    40

    Yuli County, Xinjiang, 550 Thousand Mu Of Cotton Harvest Is In Sight

    Supporting resources
    |
    2010/8/21 11:05:00
    37

    To Develop: The Central Cotton Industry Seeks Financial Management.

    Supporting resources
    |
    2010/8/21 10:54:00
    37

    From Volume To Cut: A Four Minute Journey Of A Garment

    Supporting resources
    |
    2010/8/21 10:52:00
    30

    Sewing Machine Industry 50 Strong Dealer Selection Activities Start

    Supporting resources
    |
    2010/8/21 10:50:00
    34
    Read the next article

    Qingdao Outdoor Sports Equipment Fair Opened In August 20Th.

    According to the organizing committee, the exhibition was hosted by the China Textile Business Association and the Qingdao municipal government. It gathered more than 200 well-known outdoor products manufacturers at home and abroad, and set up 1500 booths, with an indoor area of 30000 square meters and outdoor 15000 square meters.

    主站蜘蛛池模板: 亚洲精品无码专区| 天天视频天天爽| 国产亚洲综合激情校园小说 | 久久综合丝袜日本网| 三级日本高清完整版热播| 老师好长好大坐不下去| 欧美人七十二式性视频教程一| 国产精品高清全国免费观看| 午夜亚洲国产成人不卡在线| 亚洲免费人成视频观看| jizz.日本| 特黄特色大片免费播放路01| 在线观看网站禁入口不用下载| 亚洲精品亚洲人成在线观看麻豆 | 2021国产精品自产拍在线观看| 欧美日韩精品一区二区三区不卡 | 亚洲五月综合网色九月色| 狠狠综合久久久久综合小说网| 夜夜高潮夜夜爽夜夜爱爱一区 | 亚洲成AV人片在线观看ww| wwwxxxx在线观看| 激情按摩系列片AAAA| 女女女女BBBBBB毛片在线| 人妻熟妇乱又伦精品视频| 97在线视频免费公开观看| 欧美性狂猛xxxxxbbbbb| 国产熟睡乱子伦午夜视频| 久久婷婷五月综合97色直播 | 天天综合网网欲色| 亚洲欧美成人一区二区在线电影 | 天堂а√8在线最新版在线| 亚洲欧美人成综合导航| 日韩欧美一区二区三区免费看| 日韩三级视频在线| 变态Sm天堂无码专区| 中文字幕第四页| 男女一进一出呻吟的动态图| 女人被男人狂躁视频免费| 亚洲欧美日韩另类在线一| 免费专区丝袜脚调教视频| 新疆女人啪啪毛片|