    What Matters Should We Pay Attention To To Ensure The Safety Of Tailings?

    2010/10/21 17:14:00 74

    Tailing Pond Safe And Reliable Matters Needing Attention


      

    tailing pond

    There is a similarity between the reservoir and the reservoir.

    So the key problem is to ensure tailings dam.

    Safe and reliable

    For this reason

    Be careful

    Following

    Matter

    :


    (1) tailings reservoir must have flood control facilities.

    The tailings reservoir not only contains the water from the tailings pulp, but also the water in the tailing pond catchment area will enter the tailings reservoir through the surface runoff channel.

    When designing tailings reservoir, flood volume should be calculated according to design specifications.

    In order to prevent accidental accidents, due to the large amount of surface runoff in the flood season, a river closure should be constructed, and a part of the surface runoff will be taken out of the reservoir upstream.

    In some old tailings reservoirs, some drainage wells are constructed along the longitudinal direction of the tailings pond, and the wells are connected, and the excess clear water is discharged outside the reservoir through underground drainage pipes or drainage ditches.

    When the tailings pile reaches a certain height, the upstream drainage of the tailings dam ends to close the drainage well that has completed the task.

    When designing and constructing such drainage facilities, we should give full consideration to the pressure of the drainage pipeline system to bear the accumulated tailings, so that the drainage and drainage system will be crushed, so as not to cause the whole drainage system to be scrapped.


    A flood control channel is built at the beginning of the dam, and the main standby floating pump station is located in the middle and rear part of the tailings reservoir.


    (2) ensure the stability of the sub dam.

    No matter what kind of dam construction method is adopted, the size composition of tailings of the sub dam should be strictly controlled according to the test results.

    Production practice has proved that when the proportion of fine tailings of less than 37 microns is too high, the stability of sub dam will be affected.


    (3) tailings dam must have a certain safe height.

    In the process of tailings production, the height of tailings dam is higher than the actual discharge of the tailings in the reservoir for more than 1-2 meters, so as to ensure the safety of tailings dam.

    If the height of the tailings stacking surface is almost the same as that of the tailings dam, this is a risk factor. A rainstorm may cause the tailings to overflow the top of the dam, especially using the tailings to build the sub dam stage to ensure the safe height.


    (4) tailings dam should be a permeable dam.

    The water in the tailing pond is continuously discharged through the dam body (dam wall), and the dam below the drainage line is all water content or wetted by water, which is usually called the wetting curve.

    The lower the wetting curve is, the more stable the dam is.

    If the wetting curvature has risen to the top of the highest level of the sub dam, the tailings water has been submerged to the top of the sub dam. The tailings dam is already a sand pile immersed in water, and the dam may collapse at any time.

    In order to ensure the safety of the dam, the discharge of tailings slurry should be discharged from the top of the dam to the upstream direction of the reservoir evenly, and the tailings water will be pressed into the reservoir as far as possible, so that the internal slope of the dam will have a considerable distance from the accumulated tailings water.

    The length of the longitudinal slope of the tailings reservoir is usually 50-120 meters, and the small tailings can be shortened accordingly. The length of the dry slope (that is, the surface without water) is inversely proportional to the height of the wetting curve.

    • Related reading

    Chinese Reading Of World Ports

    Logistics skills
    |
    2010/10/20 18:29:00
    150

    Strategy Of Reducing Freight Cost

    Logistics skills
    |
    2010/10/19 16:57:00
    79

    Declaration Of Direct Return Procedures

    Logistics skills
    |
    2010/10/18 18:36:00
    85

    What Are The Pros And Cons Of Charter Shipping Market?

    Logistics skills
    |
    2010/10/15 18:15:00
    248

    What Is Special Logistics?

    Logistics skills
    |
    2010/10/15 18:12:00
    70
    Read the next article

    The State Will Exempt Employees From Domestic Business Services For 3 Years.

    The reporter learned from the 21 national development video conference on family service industry held at the inter ministerial Joint Conference on family service promotion to understand that in order to vigorously promote the development of domestic service industry, the state will provide a certain period of time (3 years) exemption from business tax for eligible domestic employees.

    主站蜘蛛池模板: 亚洲欧洲国产成人精品| 国精品在亚洲_欧美| 国产三级日产三级日本三级| 久精品国产欧美亚洲色aⅴ大片| 窝窝女人体国产午夜视频| 欧美日本韩国一区二区| 国外bbw免费视频| 亚洲欧美人成综合导航| 7777精品久久久大香线蕉| 欧美日韩一级二级三级| 国产精品福利一区二区| 亚洲午夜无码久久久久| jlzzjlzz亚洲jzjzjz| 校花被扒开尿口折磨憋尿| 国产无遮挡又黄又爽高清视| 国产人久久人人人人爽| 久久人人爽人人爽人人片av不| 青青青视频免费| 日本一区二区三区日本免费| 国产av无码久久精品| 中国国产aa一级毛片| 精品久久久久久中文字幕大豆网 | 日韩免费在线视频| 国产亚洲精品bt天堂精选| 久久96国产精品久久久| 综合激情网五月| 女人张开腿让男人插| 亚洲综合校园春色| 1000部羞羞禁止免费观看视频 | 出轨的女人2电影| h视频免费高清在线观看| 波多野结衣动态图| 国产精品久久久福利| 久久精品国产亚洲AV果冻传媒| 色老头成人免费视频天天综合| 成人免费无码大片a毛片| 交换年轻夫妇无删减| 2018天天弄| 日韩一级在线播放| 同城免费妇女寂寞| 99久久综合精品五月天|