• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    How To Compile Annual Maintenance Plan For Clothing Equipment

    2012/10/24 16:37:00 39

    Clothing EquipmentAnnual Maintenance PlanGarment Enterprises

     

    Compile the basis of annual maintenance plan for garment equipment.

    The repair interval and overhaul cycle of garment equipment.

    Clothing equipment

    Archives.

    Complex coefficient of clothing equipment repair.

    The quota of repair and maintenance work.

    Annual census of clothing technology.

    Because the distance, speed and cloth control of the cloth spreading machine are all executed by the computer. With the high-tech numerical control motors, the instructions of the computer can be executed without any difference, so as to achieve the absolute accuracy of synchronous delivery and ensure the perfect cloth laying effect.

    Clothing equipment next year plan to start the number of units and product requirements for clothing equipment.



      

    Annual maintenance plan

    Compilation.

    Attention should be paid to the production of clothing equipment urgently needed and key processes affecting product quality.

    The single key garment equipment on the production line should be repaired as far as possible during the holidays and without affecting production, so as to shorten the rest time.

    The balance of maintenance workload should be taken into account in the compilation, so that the whole year maintenance work can be carried out evenly, and the same type of clothing equipment can be arranged as a continuous repair as far as possible.

    The control software is permanently stored and cannot be rewritten. It is absolutely free from the power dryness and the external magnetic and electrical interference. It does not need to worry about the failure of the control software. The disadvantage is that the mechanical pmission can only reach the approximate synchronization and is impossible to be accurate.

    Mechanical constant speed pmission is easy to be influenced by velocity changes, and it is also a wear resistant device. The longer it takes, the more unreliable its accuracy is.

    The stability and safety were one hundred.

    The workload of the fourth quarter repair project should be appropriately reduced, so as to allow more production preparation time for the next year.

    Annual maintenance plan should include annual repair plan, two level maintenance plan and preventive test plan.

    The maintenance plan should be carefully investigated and prepared for technical and spare parts.


    Annual maintenance schedule.

    In order to ensure the necessary preparatory work for production technology before maintenance, the overall coordination of computer precision software can be combined with a variety of cloth laying modes. The features are: various functions such as cutting or not, cutting length, cutting speed, automatic lifting height, automatic sharpening, etc. these functions can be easily changed through data display.

    More choices can be made for cloth laying.

    The annual maintenance plan shall be made at least two months before the next year.

    Clothing enterprise

    The clothing equipment power section (group, stock) is responsible for the organization and completion.

    • Related reading

    Select The Needle According To The Strong Toughness Of The Fur.

    Equipment matching
    |
    2012/10/24 15:35:00
    32

    Knowledge About Cloth Spreading Machine

    Equipment matching
    |
    2012/10/24 15:07:00
    33

    Bonding Process Of Sewing Machine

    Equipment matching
    |
    2012/10/24 14:19:00
    11

    New Technology Of Sewing Machine Development

    Equipment matching
    |
    2012/10/24 11:52:00
    16

    Knowledge Of Automatic Cloth Spreading Machine

    Equipment matching
    |
    2012/10/24 11:24:00
    13
    Read the next article

    Fiber Inspection Experts To Support The Cotton Fair Inspection Technology Services

    The deputy director of the State Administration of quality supervision, inspection and quarantine, Pu the Great Wall, put forward three requirements for the Xinjiang cotton inspection work in the new cotton year: first, cotton quality supervision and notarization work should have new results; two, there are new progress in the cotton inspection system reform; three, the quality inspection system has a new capacity to improve the development of science and technology.

    主站蜘蛛池模板: 欧洲成人r片在线观看| 91精品全国免费观看含羞草| 色片网站在线观看| 日本黄色激情片| 国产欧美久久一区二区三区 | 国产在线jyzzjyzz免费麻豆| 欧美日韩国产精品| 国产精品天堂avav在线| 亚洲国产三级在线观看| 182tv免费视视频线路一二三| 欧美性黑人极品hd| 日韩电影免费在线观看| 国产成人精品亚洲精品| 久久无码人妻精品一区二区三区 | 色综合色综合久久综合频道| 欧美又大粗又爽又黄大片视频| 国产精品蜜臂在线观看| 亚洲国产欧美在线观看| 日本wwwxxxxx| 日韩人妻无码一区二区三区久久99| 国产农村乱子伦精品视频| 久久久xxxx| 精品国产不卡一区二区三区| 女人是男人的女未来1分49分 | 久久精品人人做人人爽电影蜜月| 香蕉一区二区三区观| 扒开双腿猛进湿润18p| 全肉高h动漫在线看| 99久久精品午夜一区二区| 欧美最猛黑人xxxx黑人猛交黄| 国产精品一区12P| 久久婷婷香蕉热狠狠综合| 美女内射毛片在线看3D| 奇米影视7777狠狠狠狠色| 亚洲熟妇av一区二区三区宅男| 永久免费视频网站在线观看| 日韩美视频网站| 咪咪色在线视频| a级成人毛片完整版| 欧美yw193.c㎝在线观看| 国产午夜精品一区二区|