    Pingyu County Huicheng Leather Co., Ltd. Sewage Treatment Plant Off-Site Technical Pformation Project Environmental Impact Assessment Two Publicity

    2014/11/26 13:07:00 46

    Pingyu Hui Cheng Leather Co.Ltd.Sewage Treatment PlantOff-Site Technological Pformation Project

    1. Project outline

      

    Pingyu County

    Hui Cheng

    Leatherwear

    The technical pformation project of the sewage treatment plant of the limited company is located in the Eastern District of Pingyu county industrial agglomeration area. It is invested by 28 million yuan from Pingyu County Luyuan Pollution Control Co., Ltd., which covers an area of 20973.4m2 and a construction area of 8700m2.

    The project is designed to deal with the sewage capacity scale of 3000m3/d. The main process is sedimentation + high efficiency air flotation + aerobic + advanced oxidation. At present, the project has been completed and put into operation. This EIA is for the EIA procedure.

    project

    Water collection area

    The effluent from the six leather factories affiliated to Huicheng Leather Co., Ltd., Pingyu, and the comprehensive waste water produced after the technical pformation were carried out. The effluent discharge standards of tanning and fur processing industrial water pollutants (GB30486-2013) were used to limit the indirect emission concentration of pollutants from newly built enterprises. After reaching the standard, they entered the Pingyu municipal sewage treatment plant for further treatment.

    After the completion of the project, Huicheng Leather Co., Ltd. can ensure the normal operation of the Huicheng leather company and discharge of the effluent to meet the target standard, so as to achieve pollution reduction.

    The main contents of the project include chromium containing waste water grid wells, chromium containing wastewater treatment pond, chromium containing wastewater treatment sedimentation tank, comprehensive wastewater grid well, gathering well, pre sedimentation tank, efficient flotation tank, regulating pond, primary settling tank, improved A/O tank, intermediate sedimentation tank, advanced oxidation pond, two stage biochemical tank, two settling, final settling tank, sludge collecting tank, sludge concentration tank, dosing room, distribution room, integrated engine room and other structures, as well as fans, pumps and other equipment and facilities.

    2. Environmental impact analysis of the project during its operation period

    The main environmental impact of the project after operation is: the influence of ammonia gas and hydrogen sulfide on the surrounding atmospheric environment; the effect of the tailings on the water environment after the project has been processed; the influence of grid slag, sand grit, sludge, chrome mud cake and the garbage of workers on the surrounding environment; the influence of various pumps, fans and other high noise equipment on the surrounding environment.

    3. The main points of environmental protection measures:

    In view of the environmental impact arising from the operation of the project, the following measures are to be taken:

    (1) wastewater: the integrated wastewater treatment process of this project adopts the technology of "sedimentation + high efficiency air flotation + aerobic + advanced oxidation process". After treatment, the effluent meets the indirect discharge limit of the new enterprises in the tanning and fur processing industrial water pollutants discharge standard (GB30486-2013), and then enters the Pingyu municipal sewage treatment plant through the municipal sewerage network.

    Exhaust gas: for odor emission, 1 sets of low temperature plasma deodorizing devices are set up to remove odor from gratings, regulating tanks, biochemical aeration tanks, etc., and further strengthen the plant greening to further reduce the influence of odor gas on the surrounding environment.

    Solid waste: during the period of project operation, there are mainly grate residue, surplus sludge, chromium sludge filter cake and workers' domestic waste. The chromium mud cake is temporarily stored in the temporary storage yard of the construction area, and is regularly sent to the units with hazardous waste disposal qualification. The solid waste is regularly sent to the Pingyu municipal solid waste treatment plant for disposal. The solid waste disposal rate is 100%, which has little impact on the surrounding area.

    Noise: mainly for the noise generated by all kinds of pumps, so as to choose low-noise equipment as much as possible. Noise and sound absorption measures should be adopted in the pump room, which can effectively avoid noise's influence on the surrounding environment and staff.

    4, the key points of environmental impact assessment:

    The project is in line with the current industrial policy of the country. The measures adopted during the operation of the project are effective and feasible, and all pollutants can meet the standard discharge. The environmental risk is acceptable. From the perspective of environmental protection, the project is feasible.

    5. Scope and feedback time

    The scope of this public participation survey: residents, units and experts affected by the project.

    The main topics of this public participation survey are: to understand the public's satisfaction with the environment, the degree of understanding of the project, the attitude towards the project and other opinions of the public.

    In order to make the public know more about the information of the project more accurately and fully, people who need further information about the project can ask the construction unit or evaluation unit.

    The deadline for inquiry and opinion is 10 working days from the date of promulgation of this announcement.

    6, the main way of public opinion.

    Public feedback can be submitted to the construction unit or evaluation unit in writing, such as fax, letter or e-mail.

    According to the working procedures stipulated in the Interim Measures for public participation in environmental impact assessment, after the announcement of the information, the contents of the announcement of the construction project will be announced one after another; the simplified version of the environmental impact statement of the construction project will be published; public questionnaires will be taken, and public opinions will be sought in the form of seminars or hearings. The public's opinions and suggestions can be submitted to the construction units, evaluation units or provincial and municipal environmental protection administrative departments by fax, letter or e-mail.

    • Related reading

    Ministry Of Industry Formulating Robot Industry Plan

    Frontier invention
    |
    2014/11/8 21:23:00
    22

    應用納米技術 三至五年內口罩防霾將不再是夢

    Frontier invention
    |
    2014/11/5 10:10:00
    30

    四年悶頭搞研究 煙臺萊陽一農民發明獲國家專利

    Frontier invention
    |
    2014/10/23 21:40:00
    24

    The Old Man Invent Fitness Board To Teach Production Technology.

    Frontier invention
    |
    2014/10/23 21:37:00
    160

    成都供電公司一員工發明充電魔方

    Frontier invention
    |
    2014/10/23 21:35:00
    26
    Read the next article

    National Bureau Of Statistics: In September 2014, The Growth Of Yarn And Textile Clothing Output Declined All The Way.

    According to the statistics of the National Bureau of statistics, the national yarn production in September 2014 is 3405163.93 tons, up 3.54% from the same period, because most Chinese textile enterprises deal with the shortage of raw materials in the way of stopping production and limiting production, and the growth of textile production has declined obviously.

    主站蜘蛛池模板: 一个人看的日本www| 你是我的城池营垒免费观看完整版 | 久久久国产99久久国产久| www.尤物在线| 欧美aaaaaa| 最新中文字幕电影免费观看 | ts人妖系列在线专区| 韩国成人在线视频| 樱花草视频www| 国产成人无码精品一区不卡| 亚洲av无码专区电影在线观看| 777丰满影院| 日韩女同互慰专区| 国产你懂的视频| 中文字幕日韩精品在线| 老司机67194精品线观看| 暖暖直播在线观看| 国产女人高潮抽搐喷水免费视频 | 男女猛烈xx00免费视频试看| 放荡的女老板bd| 午夜激情电影在线观看| 一本一本久久a久久精品综合麻豆| 亚洲成熟人网站| 晚上看b站直播软件| 国产人成视频在线观看| 中文在线最新版天堂| 秋葵app官网免费下载地址| 大陆三级理论电影有哪些| 亚洲欧美日韩一区在线观看| 美女被免费网站91色| 日韩欧国产精品一区综合无码| 国产一级黄毛片| 久久亚洲国产精品五月天婷| 欧美亚洲日本另类人人澡gogo| 欧美大香线蕉线伊人图片| 国产欧美久久一区二区| 久久久噜噜噜久久久午夜| 精品国产一区二区二三区在线观看| 夜夜影院未满十八勿进| 亚洲人成网站在线观看播放| 18末成年禁止观看试看一分钟|