• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Simple Contract Model

    2010/5/25 18:01:00 112

    A simple model of contract contract -- the model of processing contract.


    Contract No: No.


    The designated person: the place of signature, the location of the contract, the location of the contract, the following points:


    The Contractor: the time of signing the contract.


    Article 1. Fixed crop, quantity, remuneration and delivery deadline


    It is very popular.


    Fixed crop name, specification, type, unit of measurement, quantity, remuneration, delivery date and quantity.


    Unit price sum


    The total amount of Renminbi (capital): (Note: space is not enough, can be connected).


    It is very popular.


    Second materials provided by the contractor


    Name of serial number, trademark, trademark, type, manufacturer, unit of measurement, quantity of material, quality, unit price and amount.


    (Note: if space is not enough, you can pick up another).


    Third criteria, methods, time and time for objection to the materials provided by the contractor to the Forwarders:


    It is very popular in the world.


    Fourth, the technical standard and quality requirements of the fixed crops are: the following are the technical standards and the quality requirements for the crops.


    It is very popular in the world.


    Fifth terms and conditions for the responsibility of the contractor to determine the quality of crops.


    It is very popular.


    Sixth, the time, method and confidentiality requirements of technical documents, drawings and samples, process requirements and so on:


    It is very popular in the world.


    It is very popular in the world.


    Article seventh if the contractor finds that the drawings and technical requirements provided by the ordering party are unreasonable, he shall make a written objection to the ordering party within days.

    The ordering party shall reply within days after receiving written objection.


    The packaging requirements of eighth fixed crops and the cost burden.


    It is a matter of fact.


    The ninth parties (yes / no) allow third people to complete the main work of determining crops.


     
      

    The tenth way and place for the delivery of fixed crops are: the first and the second.


    It is very popular.


    The eleventh set of standards, methods, locations and time limits for crop determination: the following are: 1.


    It is very popular in the world.


    The twelfth prefix will prepay the material (capital) to the Contractor before the month of the month.


    The thirteenth terms of payment and material cost are: the settlement and the time limit.


    It is very popular.


    The fourteenth parties will pay the deposit (capital) in the year of the month of the year.


    Fifteenth conditions for rescission of this contract are: 1.


    It is very popular in the world.


    If the Sixteenth Party fails to pay the remuneration or material fee to the contractor, the contractor (or / or) can detain the fixed crop.


    The seventeenth liability for breach of contract is: liability for breach of contract.


    It is very popular in the world.


    The eighteenth way to settle disputes in a contract: the dispute arising from the execution of this contract shall be settled through consultation between the two parties. It can also be mediated by the local administrative department for Industry and commerce.


    (1) to submit arbitration to the Arbitration Commission;


    (two) bring a lawsuit to the people's court according to law.


    The nineteenth other items are: 1.


    It is very popular in the world.


    The opinion of the Contractor's contractor (public) card:


    The contractor (Chapter): the contractor (Chapter):


    Residence: Residence:


    Legal representative: legal representative:


    Identity card number: ID card number:


    Principal agent: principal agent:


    Tel: Telephone:


    Bank of opening: Bank: Certificate (public) Certificate Authority (Chapter)


    Zip code: zip code: year, month and date


    Supervision department: printing unit:


    Key points of document


     

    A fixed contract is a contract whereby the contractor processes the fixed crops and pays the remuneration according to the requirements of the ordering party.

    The difference between a fixed contract and a processing contract is that the processing contract is the supply of raw materials by the ordering party, and the contractor is responsible for processing the fixed crops. The contract is for the contractor to make use of his own technology, manpower and raw materials to complete the specific crops' addition according to the requirements of the ordering party.

    The requirements of the ordering party usually appear in the form of drawings, technical conditions or samples.

    This format is the model text (GF - 2000 - 0302).


    The main contents of the contract include: the name, quantity, remuneration and delivery time of the designated crops; the basic conditions of the name, brand, trademark, specification, type, manufacturer, unit of measurement, quantity, unit price and amount of the raw materials provided by the contractor; the acceptance and objection of the designated person to the timber; the technical standard and quality requirement of the fixed crop; and the time for the blueprint to provide the drawings, samples and process requirements.


    hot tip


    (1) the quality and quantity of materials provided by the contractor and the acceptance of the contractor should be clearly defined.

    As to what materials and materials to be used, the contractor should provide detailed list to the ordering party before he agrees with the consent of the ordering party.

    In the contract, the content of the acceptance material should be clearly determined, and the material quality of the material is disagreed. The ordering party shall submit it within the prescribed time limit.


     

    (2) the remuneration of a fixed contract is higher than that of a processing contract.

    Because the materials provided by the Contractor shall include the price of the material.

    Therefore, both sides should agree on the price of the materials and write them into the contract to prevent disputes arising from the price of the materials.


    (3) the ordering party shall provide technical data and processing drawings, etc., and stipulate the time and quality contract provided.

    If the drawings and technical data provided by the ordering party are unreasonable, the contract should specify the time for the contractor to raise objections and the contents of the amendment.


    (4) the delivery and acceptance of fixed crops are the same as processing contracts.

    • Related reading

    設(shè)備技術(shù)協(xié)議范本

    Contract template
    |
    2010/5/22 16:51:00
    122

    About Technology Stock Contract Model

    Contract template
    |
    2010/5/22 16:49:00
    151

    Contract Model For Garment Hair Processing

    Contract template
    |
    2010/5/21 18:19:00
    95

    Mortgage Loan Contract Template

    Contract template
    |
    2010/5/20 18:30:00
    37

    How To Deal With Collective Contract Disputes?

    Contract template
    |
    2010/5/19 15:44:00
    36
    Read the next article

    Garment Processing Contract

    Party A (Supplier): the contract number is: the contract number is: the contract code is: the contract number is: the first party, the processing area, the contract location is: the first place of the contract is the following:

    主站蜘蛛池模板: 成年女性特黄午夜视频免费看 | 国产精品久久久久久久久齐齐| 久久99精品国产免费观看| 波多野结衣在线一区二区| 国产午夜无码福利在线看网站| 99久久人妻精品免费二区| 日产精品一卡2卡三卡4乱码久久| 亚洲欧美4444kkkk| 精品国产免费一区二区三区| 国产成人精品综合久久久久| 99国产精品免费视频观看| 我的极品岳坶34章| 亚洲av中文无码乱人伦在线视色| 男人肌肌插女人肌肌| 大学生初次破苞免费视频| 久久午夜伦鲁片免费无码| 欧美日韩一区二区成人午夜电影| 再深点灬舒服灬太大了添老师 | 成年18网站免费视频网站| 亚洲AV无一区二区三区久久| 特黄特色大片免费播放| 国产a级特黄的片子视频免费| 99久久精品免费精品国产| 成人网视频免费播放| 九九热精品免费| 欧美日韩在大午夜爽爽影院| 公洗澡时强要了| 色播在线永久免费视频网站| 国产欧美日韩亚洲一区二区三区| 99re国产精品视频首页| 强开小娟嫩苞又嫩又紧| 亚洲国产aⅴ成人精品无吗| 看亚洲a级一级毛片| 国产一区二区三区不卡在线观看| 欧美日韩第一区| 小小视频最新免费观看在线| 久久久久国产精品免费看| 有人有看片的资源吗www在线观看 有坂深雪初尝黑人在线观看 | 国产在线不卡一区| bt天堂在线最新版在线| 国内精品伊人久久久久777|