Contract For Housing Decoration
Contract for housing decoration
Housing decoration contract, housing decoration contract
First party:
Party B:
After friendly consultations, Party A and Party B have reached agreement on the contract for the renovation and construction of Party A and sign this contract.
1. Party B shall undertake all the construction work of the house decoration, that is to say, the Contractor shall not carry the materials, but Party A shall have the decoration materials, and Party B shall only be responsible for the construction.
Two, contract cost: RMB whole (lowercase 13800 yuan).
In addition, Party A will not pay any cost to Party B.
Three, payment method:
1. Party B will pay RMB per thousand yuan ($100) for Party B's day of construction.
2, after the completion of all decoration works, Party B will pay the progress RMB RMB thousand yuan ($100).
3. After the completion of all decoration works, Party A will pay the balance of RMB in the day after tomorrow.
Four, construction period: the two sides confirm that the construction period of the building is days, and that Party B should complete all the construction tasks within the agreed time limit.
Five, other conventions:
1, Party A is responsible for purchasing decoration materials in time according to the list provided by Party B.
2, Party A should pay in time according to the contract, otherwise it will pay 200 yuan / day for breach of contract.
3, Party B shall prepare its own tools, hire personnel, and be responsible for the safety of the construction itself, strictly in accordance with the drawings provided by Party A and Party A's requirements, so as to ensure the quality of the project. If the quality unqualified behavior is found during the construction process, it will cause rework, so the loss of the decoration materials and the loss of labor will be borne by Party B.
4, Party B shall not waste or misuse the decoration materials of Party A, otherwise, it will be punished according to 500 yuan / time, and compensation for Party A shall be compensated.
5, Party B shall complete all construction tasks within the time limit stipulated in the contract, and shall be punished according to 200 yuan per day for each extension.
Party B shall not be liable for breach of contract if Party A fails to pay in time, the material of the decoration is delayed or the content of the new construction is delayed.
6, the repair period of the house is two years, and Party B shall be responsible for free maintenance of Party A in time of warranty.
Six. This contract is made in two copies. Each party holds one copy and the two parties sign it into force.
Party A (signature): Party B (signature):
Time: time:
Contents of housing renovation contract
(1) living room production and painting
1. Door entry.
2, shoe cabinet;
3, the entrance;
4, wine cabinet;
5. TV cabinet;
6, kitchen door sets;
7, television background wall;
8. Ceiling of TV background wall.
10, the living room and balcony door sliding door;
11, bathroom doorway aisle ceiling.
(two) master bedroom
1, wardrobe;
2. Double side door cover and door panel.
3, aisle ceiling.
(three) supine manufacture
1. Double side door cover and door panel.
2, wardrobe.
(four) children's room
1, two door double doors, door panels;
2, wardrobe;
3, computer desk and bookshelf;
4, tatami bed;
(six) toilet
1, ceiling;
2 change to sink water bay.
4. Floor tile and wall tiles.
(seven) kitchen
1. Stick floor tiles and wall tiles.
2, ceiling.
(eight) two life balcony
1. Floor tile;
2, making, hanging cabinet.
(nine) living room balcony
1, desk, bookcase;
(ten) comprehensive category
1, living room,
Bedroom
Living room balcony top and
metope
Putty 3 times, wall paint 2 times;
2.
Kitchen
The water pipe of the toilet is supplementing and modifying.
3, all circuit pformation;
4. Leveling all the ground.
5, toilet wall waterproof treatment;
6, wardrobe, bookcase moisture-proof treatment;
7, lamps and lanterns, sanitary ware installation;
8, the windows are paved with marble.
9, bathroom, kitchen doorway laying threshold stone;
10, living room balcony, life balcony stick skirting line;
11, pack all water pipes and lampblack pipes.
(eleven), others:
1, decoration materials handling (from the main entrance to the house);
2, decoration sanitation, garbage cleaning to the garbage station;
3, decoration management fees, garbage clearing fees shall be the responsibility of Party A.
- Related reading
- Market quotation | Domestic Shoe Companies Pay Attention To Shoe Industry Standardization
- Enterprise information | Anta Orders Growth Gross Margin Is Expected To Rise To 38%
- Celebrity endorsement | Niki Chow Has A Funny Record Of Love Shoes.
- Exhibition focus | Quanzhou Shoes And Clothing Enterprise Exhibition Will Show Its Strength
- Pay attention to employees | 182 Shoe Manufacturers In Wenling Prepare To Build 100 Meters International Shoe Material City
- Market quotation | How Do Non Olympic Shoe Marketing Enterprises Plan Their Development Strategy?
- Shoe Express | 347 Foreign Companies In Guangzhou Shut Down Last Year
- Consumer rights protection | The Consumption Of Mobile Phones And Footwear Makes People Most "Upset."
- Market quotation | The Brand Of Jacket Is Ranked The First Three In Jinjiang.
- Market quotation | Shoes Enterprises Authorized The Production Of Supporting Products To Add Value To The Brand.
- 2010 Asian Games Mascot Toys Business Opportunities
- The Best Distance Between Managers And Ordinary Employees
- Zhang Hanyun'S Hot Pants Appeared Slightly Matured.
- Workplace: The Politics Of Office Politics
- How To Solve This Kind Of Trouble Skillfully?
- Ye Yiqian And Sang Lan Watch Drama And Overflow With A Happy Smile.
- Topic: How To Get A Good Job In The Workplace
- 故事:初涉職場,有話好好說
- Workplace: How To Distinguish Between Noble And Villain In The Workplace
- Shanghai Registered Company Should Choose High Tax Rate Park