• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Procurement Management System For Engineering Materials And Equipment

    2010/11/13 17:16:00 53

    Procurement Management System For Engineering Materials And Equipment

      

    Engineering materials

    Equipment procurement

    management system


    To enhance engineering materials

    Equipment procurement

    In accordance with the relevant laws and regulations of the state and in line with the actual situation of the company, the system is formulated.


    First, the project technology department is the first responsibility department of the procurement management of engineering materials and equipment, and the specific work is completed by the project technology department and the investment development department.


    Two, for the procurement of bulk materials and large equipment, public bidding or inviting tenders must be carried out.

    Through investigation and comprehensive selection, materials and equipment with relatively low price and quality guarantee are adopted.


    Three, for a small number of materials and equipment that are not suitable for tender projects, we need to have a detailed inspection and choose the right products.


    Four. The materials and equipment needed for the project should be made according to the quantity, specifications and time of use, etc., so as to ensure the time limit for the project.


    After determining the procurement of suppliers of engineering materials and equipment, detailed supply contracts should be signed, including origin, brand, grade, quantity, price, type, and delivery time. According to the stipulations of the contract, ensure timely supply.


    Five. Engineering materials and equipment shall be specially managed, and materials and equipment will be checked and checked in time after entering the field.

    For non qualified materials and equipment, it is strictly prohibited to go through the formalities of warehousing, materials and equipment, and go through the procedures for warehousing and warehousing. After processing, the materials and equipment shall be sent to the finance department in a timely manner to ensure that the accounts are consistent and the accounts are in line with each other.


    Six, the supplier should provide timely proof of engineering materials and equipment and related notes for settlement.


    Seven. The project technical department and its site representative strictly supervise and check the materials and equipment for entering the project, so as to ensure the quality of the project.

    • Related reading

    On The System Of Contracting Out Projects

    Rules and regulations
    |
    2010/11/13 17:13:00
    54

    Rare Earth Export Enterprises 2011 Quota Declaration Conditions Promulgated

    Rules and regulations
    |
    2010/11/12 11:09:00
    52

    Management Of Contracts

    Rules and regulations
    |
    2010/11/10 16:25:00
    64

    Handling Of Contract Disputes

    Rules and regulations
    |
    2010/11/10 16:24:00
    75

    Alteration And Dissolution Of Contract Performance

    Rules and regulations
    |
    2010/11/10 16:23:00
    57
    Read the next article

    Lu Yu Has Liu Yang And Liang Zi.

    主站蜘蛛池模板: 亚洲精品无码久久久久| 波多野结衣第一页| 操美女视频免费网站| 永久久久免费浮力影院| 日本簧片在线观看| 国产精品免费精品自在线观看 | 宝贝乖女好紧好深好爽老师| 国产欧美va欧美va香蕉在线| 人人添人人澡人人澡人人人人 | 老湿机一区午夜精品免费福利| 日本三人交xxx69| 国产日韩在线视频| 乡村大乱淫交换第一章| 91精品国产欧美一区二区| 美女扒开小内裤| 日本免费成人网| 四虎国产精品免费久久久| 中文字幕乱码人妻一区二区三区| 欧美性巨大欧美| 欧美性生活视频免费| 大象视频在线免费观看| 啊~怎么又加了一根手指| 中文字幕yellow在线资源| 青青操国产在线| 日韩精品欧美国产精品亚| 国产精品成久久久久三级| 亚洲色无码一区二区三区| 一二三四在线观看免费中文动漫版 | 日本人妻丰满熟妇久久久久久| 国产丰满眼镜女在线观看| 久久精品国产一区二区三区不卡| .天堂网www在线资源| 欧美破苞合集magnet| 在线精品国产一区二区三区 | 久久精品无码中文字幕| 裸体跳舞XXXX裸体跳舞| 日韩欧美中文精品电影| 国产v片成人影院在线观看| 久久人人爽人人爽大片aw| 老公去上班的午后时光| 手机看片你懂的|