• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Procurement Management System For Engineering Materials And Equipment

    2010/11/13 17:16:00 53

    Procurement Management System For Engineering Materials And Equipment

      

    Engineering materials

    Equipment procurement

    management system


    To enhance engineering materials

    Equipment procurement

    In accordance with the relevant laws and regulations of the state and in line with the actual situation of the company, the system is formulated.


    First, the project technology department is the first responsibility department of the procurement management of engineering materials and equipment, and the specific work is completed by the project technology department and the investment development department.


    Two, for the procurement of bulk materials and large equipment, public bidding or inviting tenders must be carried out.

    Through investigation and comprehensive selection, materials and equipment with relatively low price and quality guarantee are adopted.


    Three, for a small number of materials and equipment that are not suitable for tender projects, we need to have a detailed inspection and choose the right products.


    Four. The materials and equipment needed for the project should be made according to the quantity, specifications and time of use, etc., so as to ensure the time limit for the project.


    After determining the procurement of suppliers of engineering materials and equipment, detailed supply contracts should be signed, including origin, brand, grade, quantity, price, type, and delivery time. According to the stipulations of the contract, ensure timely supply.


    Five. Engineering materials and equipment shall be specially managed, and materials and equipment will be checked and checked in time after entering the field.

    For non qualified materials and equipment, it is strictly prohibited to go through the formalities of warehousing, materials and equipment, and go through the procedures for warehousing and warehousing. After processing, the materials and equipment shall be sent to the finance department in a timely manner to ensure that the accounts are consistent and the accounts are in line with each other.


    Six, the supplier should provide timely proof of engineering materials and equipment and related notes for settlement.


    Seven. The project technical department and its site representative strictly supervise and check the materials and equipment for entering the project, so as to ensure the quality of the project.

    • Related reading

    On The System Of Contracting Out Projects

    Rules and regulations
    |
    2010/11/13 17:13:00
    54

    Rare Earth Export Enterprises 2011 Quota Declaration Conditions Promulgated

    Rules and regulations
    |
    2010/11/12 11:09:00
    52

    Management Of Contracts

    Rules and regulations
    |
    2010/11/10 16:25:00
    64

    Handling Of Contract Disputes

    Rules and regulations
    |
    2010/11/10 16:24:00
    75

    Alteration And Dissolution Of Contract Performance

    Rules and regulations
    |
    2010/11/10 16:23:00
    57
    Read the next article

    Lu Yu Has Liu Yang And Liang Zi.

    主站蜘蛛池模板: 大伊香蕉在线精品视频人碰人| 你懂的在线视频网站| 精品国产精品久久一区免费式 | 九色综合狠狠综合久久| a毛片免费观看完整| 被猛男cao尿了| 欧美国产日韩另类| 在线观看国产精品日韩AV| 人妻少妇精品久久| 中文字幕成人网| 美女扒开屁股给男人看无遮挡| 日韩欧美成末人一区二区三区| 国产精品午夜电影| 亚洲另类无码专区丝袜| 99精品一区二区三区| 精品国产福利在线观看一区| 巨大黑人极品hdvideo| 国产乱理伦片在线观看| 九九综合九九综合| 高清在线一区二区| 最新日韩在线观看| 国产真实乱对白mp4| 亚洲日韩精品一区二区三区| Aⅴ精品无码无卡在线观看| 精品久久久久久久久中文字幕 | 久久免费福利视频| 欧美激情videossex护士| 日韩激情无码免费毛片| 国产乱女乱子视频在线播放| 中文免费观看视频网站| 男男gay做爽爽的视频免费| 好紧好爽欲yy18p| 冈本视频老版app下载安装进入口| zztt668.su黑料不打烊| 精品久久综合1区2区3区激情| 成人精品视频一区二区三区尤物| 国产一级大片在线观看| 久久久久久九九99精品| 色视频在线观看免费| 成年免费视频黄网站在线观看| 国产69久久精品成人看|