• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Procurement Management System For Engineering Materials And Equipment

    2010/11/13 17:16:00 53

    Procurement Management System For Engineering Materials And Equipment

      

    Engineering materials

    Equipment procurement

    management system


    To enhance engineering materials

    Equipment procurement

    In accordance with the relevant laws and regulations of the state and in line with the actual situation of the company, the system is formulated.


    First, the project technology department is the first responsibility department of the procurement management of engineering materials and equipment, and the specific work is completed by the project technology department and the investment development department.


    Two, for the procurement of bulk materials and large equipment, public bidding or inviting tenders must be carried out.

    Through investigation and comprehensive selection, materials and equipment with relatively low price and quality guarantee are adopted.


    Three, for a small number of materials and equipment that are not suitable for tender projects, we need to have a detailed inspection and choose the right products.


    Four. The materials and equipment needed for the project should be made according to the quantity, specifications and time of use, etc., so as to ensure the time limit for the project.


    After determining the procurement of suppliers of engineering materials and equipment, detailed supply contracts should be signed, including origin, brand, grade, quantity, price, type, and delivery time. According to the stipulations of the contract, ensure timely supply.


    Five. Engineering materials and equipment shall be specially managed, and materials and equipment will be checked and checked in time after entering the field.

    For non qualified materials and equipment, it is strictly prohibited to go through the formalities of warehousing, materials and equipment, and go through the procedures for warehousing and warehousing. After processing, the materials and equipment shall be sent to the finance department in a timely manner to ensure that the accounts are consistent and the accounts are in line with each other.


    Six, the supplier should provide timely proof of engineering materials and equipment and related notes for settlement.


    Seven. The project technical department and its site representative strictly supervise and check the materials and equipment for entering the project, so as to ensure the quality of the project.

    • Related reading

    On The System Of Contracting Out Projects

    Rules and regulations
    |
    2010/11/13 17:13:00
    54

    Rare Earth Export Enterprises 2011 Quota Declaration Conditions Promulgated

    Rules and regulations
    |
    2010/11/12 11:09:00
    52

    Management Of Contracts

    Rules and regulations
    |
    2010/11/10 16:25:00
    64

    Handling Of Contract Disputes

    Rules and regulations
    |
    2010/11/10 16:24:00
    75

    Alteration And Dissolution Of Contract Performance

    Rules and regulations
    |
    2010/11/10 16:23:00
    57
    Read the next article

    Lu Yu Has Liu Yang And Liang Zi.

    主站蜘蛛池模板: 国产成人无码av在线播放不卡| 另类欧美视频二区| 男男动漫全程肉无删减彩漫| 成年女人午夜毛片免费看 | 哦好大好涨拨出来bl| 亚洲欧美日韩在线精品2021| av区无码字幕中文色| 草草影院最新发布地址| 日本大乳高潮视频在线观看| 国产乱码一区二区三区爽爽爽| 久久久久琪琪去精品色无码| 视频一区视频二区在线观看| 日产精品卡一卡2卡三卡乱码工厂| 国产主播福利一区二区| 五月婷婷电影网| 97国产在线视频公开免费| 欧美日韩在线不卡| 国产精品亚洲成在人线| 亚洲免费人成在线视频观看| 99久久伊人精品综合观看| 毛片网站是多少| 天天摸天天操免费播放小视频 | 亚洲色av性色在线观无码| 99久久99久久精品| 欧美又黄又嫩大片a级| 国产黄在线观看免费观看不卡| 亚洲欧美一区二区三区九九九| gogo全球高清大胆亚洲| 波多野结衣在线观看一区| 国产精品无码dvd在线观看| 亚洲欧美日韩精品久久亚洲区| 2017狠狠干| 日本高清免费看| 嗯!啊!使劲用力在线观看| wwwjizzjizz| 欧美成人看片一区二区三区尤物| 国产真实乱人视频| 亚洲av中文无码乱人伦在线观看| 韩国中文电影在线看完整免费版 | 啊啊啊好大在线观看| jizzjizzjizz中国|