• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    System Engineering Contract

    2011/1/6 11:33:00 43

    System Engineering Contract

    Party A: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


    Party B: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


    A friendly negotiation between the two sides has made it possible.

    engineering

    The following agreements are reached:


    1. Party A shall provide Party B with equipment and software for the company.


    Total contract price: $, $, $, $, $, and $$


      

    among

    Software fee: $1 million yuan (capital): capital and trade.


    The cost of hardware is RMB.


    Project fee.


    Two

    payment

    mode


    Party B pays first party's total project advance payment.

    A total of $1 million yuan.


    Among them, the software fee is $.


    The cost of hardware is RMB.


    Project cost: $.


    After Party A's computer hardware is delivered to Party B's designated place, after Party B points, Party B shall pay all hardware costs to Party A.


    After the installation is completed, Party B will pay the remaining sum to Party A within seven days.


    All payment methods are cash payment.


    3. party a responsibility


    (1) Party A completes the software installation and commissioning before the time required by Party B.


    (2) the system administrator who is responsible for training party B and the maintenance period of the software are free of charge. The maintenance site is located at the location of party a company.

    Within one year, the software provided by Party A was damaged due to the failure of hardware supplied by Party A.


    (3) Party A can collect the cost of the expansion part if the functions are extended according to the requirements of Party B.


    (4) one year later, Party A will pay the maintenance of the equipment and software for maintenance. The maintenance cost will be RMB yuan / yuan (excluding the cost of replacing equipment and increasing the number of software support points).


    4. Party B's responsibility


    (1) the material used in the commissioning system of the Party A is only for system testing, and shall not be used for KTV business or any other commercial activities for profit. Otherwise, all civil and criminal liabilities involved shall be borne by Party B.


    (2) Party B shall not be responsible for the activities required by Party B for business or other business activities for profit.


    (3) Party B shall be responsible for Party A's expenses arising from the damage caused by the system and the need for Party A's on-site service.


    5. other matters


    (1) software should not be copied; software rights should not be removed, covered or applied.


    (2) in accordance with the second provision of this contract, if Party B fails to pay more than the time limit, Party A shall have the right to terminate the contract, and Party A shall not be responsible for the consequences arising therefrom.


    6. liability for breach of contract


    If both parties fail to do so, they shall be resolved by mutual consultation. If a party breaches or infringements, refer to the relevant laws and regulations of China. If there is any dispute between the two parties, submit it to the people's court for judgment.


    7. the contract shall come into force after signature and seal of the representatives of both parties. The original contract is made in duplicate. Each party holds one copy and has the same legal effect.

    Statement: this contract is invalid after photocopying or alteration.


    Party A: (seal)


    Person in charge: Mr. Yu, he is in charge.


    The time is: the first, the second and the third.


    Location: the first, the second and the third.


    Party B: (seal)


    Person in charge: Mr. Yu, he is in charge.


    The time is: the first, the second and the third.


      地點:_______________
    • Related reading

    Contract For Feasibility Study Of Construction Projects

    Contract template
    |
    2011/1/6 11:31:00
    42

    Integrated Kitchen Production Contract

    Contract template
    |
    2011/1/6 11:29:00
    57

    Repair And Repair Contract

    Contract template
    |
    2011/1/6 11:26:00
    35

    Criminal Principal Agent Contract

    Contract template
    |
    2011/1/5 13:52:00
    84

    Exclusive Agency Contract Agreement

    Contract template
    |
    2011/1/5 13:50:00
    103
    Read the next article

    中外來件裝配合同

    為了保證雙方履行合同和及時按合同規定支付罰款或賠償損失,雙方應分別向對方提供各自銀行所出具的保函。

    主站蜘蛛池模板: 人人爽人人澡人人高潮| 天天躁夜夜躁狠狠躁2021西西| 国产成人综合久久亚洲精品| 亚洲国产成人精品无码区二本| 91福利国产在线观一区二区| 波多野结衣456| 在线观看成人网| 亚洲精品午夜视频| 91香蕉视频黄| 欧美成人免费观看| 国产精品入口麻豆免费观看| 亚洲国产成人久久综合一区| 2021在线观看视频精品免费| 欧美变态另类刺激| 国产精品久免费的黄网站| 亚洲伊人成无码综合网| 免费福利在线视频| 日韩电影免费在线观看| 国产午夜电影在线观看不卡| 久久午夜无码鲁丝片直播午夜精品| 青青青青青青久久久免费观看| 日本三级在线视频| 又黄又骚的网站| www.日日干| 武则天一边上朝一边做h| 国产精品自产拍高潮在线观看| 亚洲人精品亚洲人成在线 | 最近高清中文在线国语字幕| 国产日本在线视频| 久久亚洲国产成人精品无码区| 翁与小莹浴室欢爱51章| 娃娃脸中文字幕1080p| 亚洲综合久久成人69| 91东航翘臀女神在线播放| 欧美丰满熟妇xx猛交| 国产在线精品99一卡2卡| 久久一区二区三区精品| 精品国产第一国产综合精品| 在线播放免费人成视频在线观看| 亚洲欧洲国产视频| 麻豆高清区在线|