• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    System Engineering Contract

    2011/1/6 11:33:00 43

    System Engineering Contract

    Party A: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


    Party B: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


    A friendly negotiation between the two sides has made it possible.

    engineering

    The following agreements are reached:


    1. Party A shall provide Party B with equipment and software for the company.


    Total contract price: $, $, $, $, $, and $$


      

    among

    Software fee: $1 million yuan (capital): capital and trade.


    The cost of hardware is RMB.


    Project fee.


    Two

    payment

    mode


    Party B pays first party's total project advance payment.

    A total of $1 million yuan.


    Among them, the software fee is $.


    The cost of hardware is RMB.


    Project cost: $.


    After Party A's computer hardware is delivered to Party B's designated place, after Party B points, Party B shall pay all hardware costs to Party A.


    After the installation is completed, Party B will pay the remaining sum to Party A within seven days.


    All payment methods are cash payment.


    3. party a responsibility


    (1) Party A completes the software installation and commissioning before the time required by Party B.


    (2) the system administrator who is responsible for training party B and the maintenance period of the software are free of charge. The maintenance site is located at the location of party a company.

    Within one year, the software provided by Party A was damaged due to the failure of hardware supplied by Party A.


    (3) Party A can collect the cost of the expansion part if the functions are extended according to the requirements of Party B.


    (4) one year later, Party A will pay the maintenance of the equipment and software for maintenance. The maintenance cost will be RMB yuan / yuan (excluding the cost of replacing equipment and increasing the number of software support points).


    4. Party B's responsibility


    (1) the material used in the commissioning system of the Party A is only for system testing, and shall not be used for KTV business or any other commercial activities for profit. Otherwise, all civil and criminal liabilities involved shall be borne by Party B.


    (2) Party B shall not be responsible for the activities required by Party B for business or other business activities for profit.


    (3) Party B shall be responsible for Party A's expenses arising from the damage caused by the system and the need for Party A's on-site service.


    5. other matters


    (1) software should not be copied; software rights should not be removed, covered or applied.


    (2) in accordance with the second provision of this contract, if Party B fails to pay more than the time limit, Party A shall have the right to terminate the contract, and Party A shall not be responsible for the consequences arising therefrom.


    6. liability for breach of contract


    If both parties fail to do so, they shall be resolved by mutual consultation. If a party breaches or infringements, refer to the relevant laws and regulations of China. If there is any dispute between the two parties, submit it to the people's court for judgment.


    7. the contract shall come into force after signature and seal of the representatives of both parties. The original contract is made in duplicate. Each party holds one copy and has the same legal effect.

    Statement: this contract is invalid after photocopying or alteration.


    Party A: (seal)


    Person in charge: Mr. Yu, he is in charge.


    The time is: the first, the second and the third.


    Location: the first, the second and the third.


    Party B: (seal)


    Person in charge: Mr. Yu, he is in charge.


    The time is: the first, the second and the third.


      地點:_______________
    • Related reading

    Contract For Feasibility Study Of Construction Projects

    Contract template
    |
    2011/1/6 11:31:00
    42

    Integrated Kitchen Production Contract

    Contract template
    |
    2011/1/6 11:29:00
    57

    Repair And Repair Contract

    Contract template
    |
    2011/1/6 11:26:00
    35

    Criminal Principal Agent Contract

    Contract template
    |
    2011/1/5 13:52:00
    84

    Exclusive Agency Contract Agreement

    Contract template
    |
    2011/1/5 13:50:00
    103
    Read the next article

    中外來件裝配合同

    為了保證雙方履行合同和及時按合同規定支付罰款或賠償損失,雙方應分別向對方提供各自銀行所出具的保函。

    主站蜘蛛池模板: 国产精品久久99| 久久棈精品久久久久久噜噜 | 亚洲欧美日韩精品久久亚洲区 | 亚洲人成网站999久久久综合| 一区二区三区福利视频| 被窝影院午夜无码国产| 色综合五月婷婷| 欧美e片成人在线播放乱妇| 夜夜夜夜猛噜噜噜噜噜试看| 啊灬老师灬老师灬别停灬用力| 五月天亚洲色图| 你懂的免费在线| 正在播放西川ゆい在线| 好看的中文字幕在线| 四虎成人精品在永久免费| 久久精品一区二区影院| 韩剧学生的妈妈| 日韩欧美在线不卡| 国产福利在线视频尤物tv| 亚洲欧美日韩一区二区三区在线| 92午夜少妇极品福利无码电影| 男女抽搐一进一出无遮挡| 成人免费乱码大片A毛片| 国产一区二区电影在线观看| 久久国产乱子伦精品免| 黄频免费观看在线播放| 最近中文字幕免费mv视频| 国产精品久久久久免费a∨| 亚洲成人福利在线| www视频免费| 第一区免费在线观看| 成人免费看吃奶视频网站| 免费a级黄毛片| jlzz大全高潮多水老师| 粉色视频下载观看视频| 国语free性xxxxxhd| 亚洲经典在线中文字幕| 99久久精品免费看国产一区二区三区| 狠狠色噜噜狠狠狠合久| 在线播放精品一区二区啪视频| 亚洲综合第二页|