• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Adjustment Method Of Dual Needle Vehicle Phase Time

    2014/2/15 17:19:00 100

    Double Needle CarTextile MachineryTextile Equipment

    < p > all kinds of < a href= "http://www.91se91.com/news/index_c.asp" > double needle car < /a > have a headache problem, that is, the car is unstable.

    Maintenance rate is very high, especially after a few years, a lot of phase time is a bit messy, a lot of machine repair is how to adjust the adjustment is not good, according to the editor's point of view, a lot of phase time is well adjusted, there are no many problems.

    < /p >


    < p > first, let's start with pins and cloth teeth.

    First, the cloth delivery (adjusting dial) is pferred to zero. When the cloth is not delivered, the flywheel is rotated so that the needle post is at the bottom dead center.

    Loosen the horizontal delivery arm rocker fastening screws, adjust the distance between the inner side of the needle bar and the presser bar to 1.5mm.

    If it is not adjusted, it will cause needle jumping and broken needles.

    < /p >


    < p > notice that there will be a change in the needle dropping point after adjusting the hole of the cloth hole, and it is necessary to adjust the feeding gear to cooperate.

    The delivery time should be adjusted to the point of the horizontal feeding cam and the cutting point of the lower shaft.

    The horizontal feeding cam should not be misplaced, otherwise it will make the rotation heavy, so that the needle will enter the center of the feeding hole. (very important, otherwise there will be a floating line phenomenon.) one mistake is that the general machine repair will adjust the needle bar to match the feeding hole and the drop point is not in the middle of the feeding hole, especially the long Kong Shihou! < /p >


    < p > again is the time of needle and shuttle.

    The lower dead point of the needle is adjusted according to the cloth condition of < a href= "http://www.91se91.com/news/index_c.asp" > sewing < /a >.

    When the needle goes up from the lower dead point to 2.2mm (or the lower end of the lower line and the needle sleeve is flat), the distance between the needle and the shuttle spindle is 0-0.05mm, the distance between the needle and the needle is 0-0.07mm, and the center line of the needle is consistent with that of the spindle.

    It depends on the actual situation.

    < /p >


    < p > turn the handwheel, so that the back line is placed in the final position.

    The inner shuttle is rotated to the opposite direction in the reverse direction of the rotating shuttle to make the shuttle gear contact with the needle plate slot.

    Loosen the fastening screws of the withdrawal line hook, so that the gap between the inner shuttle triangular block and the back line hook is too large for the 0.2-0.3mm. gap, causing loose and broken lines.

    The clearance is too small, resulting in the damage of the thread withdrawal hook.

    < /p >


    < p > don't forget that the gap between the top of the needle slot and the shuttle is adjusted to 0.8-1.0mm.. The replacement of the a href= "http://www.91se91.com/news/index_c.asp" > the shuttle spindle < /a > is replaced by the sleeve plate on the rotating spindle.

    Misunderstanding two is that the general machine repair will pad the needle board to adjust its clearance.

    < /p >


    < p > finally, the matching time of the upper shaft and the lower shaft is removed from the gear wheel.

    Turn the handwheel to make the marking of the hand wheel and the cutting edge of the car on the top.

    Rotate the lower shaft, so that there is a small hole on the frame and first screws on the lower shaft gear wheel.

    Ensure that the upper axle and the lower shaft are not moved, and the synchronous toothed belt is installed.

    If the time is not right, the needle dropping point, delivery time and mechanical clamping will be sent.

    < /p >

    • Related reading

    The Total Number Of Spindles Exceeds 120 Million, And The Scale Of Textile Machinery Industry Needs To Be Changed.

    Equipment matching
    |
    2014/2/12 19:02:00
    47

    How To Make Chinese Lace Stand Alone In Xin Gang Spinning Machine

    Equipment matching
    |
    2014/2/12 15:01:00
    27

    Eyeball: Where Is The Adjustment Of Textile Machinery?

    Equipment matching
    |
    2014/2/10 11:18:00
    115

    Development Of SALS Small Angle Laser Scattering Measuring Instrument For Chemical Fiber Measurement

    Equipment matching
    |
    2014/1/31 21:47:00
    10

    臺州市2013年工業縫紉機量增價漲

    Equipment matching
    |
    2014/1/26 20:28:00
    17
    Read the next article

    10 Major Tax Time Requirements

    When the relevant costs and expenses actually incurred in the year are not available in time for various reasons, the enterprise can calculate the amount of the quarterly income tax in advance according to the amount of the book payment. However, when the settlement is paid, the effective certificate of the cost and cost should be supplemented. Next, let's take a look at the 10 major tax time requirements that must be focused.

    主站蜘蛛池模板: 国产成人综合久久亚洲精品| 日韩精品极品视频在线观看免费| 女人被男人躁到呻吟的| 和阿同居的日子hd中字| 丰满白嫩大屁股ass| 草莓视频网站下载| 无码日韩精品一区二区免费| 国产人妖视频一区二区破除| 久久婷婷五月综合色精品| 91香蕉污视频| 日本边添边摸边做边爱的视频| 国产卡一卡二贰佰| 久久久不卡国产精品一区二区| 色噜噜狠狠一区二区三区果冻| 护士的小嫩嫩好紧好爽在线播放 | 久久这里只有精品18| 国产精品2019| 日本动态120秒免费| 国亚洲欧美日韩精品| 一区二区中文字幕在线观看| 男人日女人动态视频| 国自产精品手机在线视频香蕉| 亚洲成a人片在线观看中文!!!| caoporn成人| 日韩中文字幕在线观看视频| 国产a级一级久久毛片| 一本久久a久久精品亚洲| 狠狠爱天天综合色欲网| 国产精品毛片va一区二区三区 | yellow字幕网在线zmzz91| 理论片2023最新在线观看| 国产美女自慰在线观看| 亚洲Aⅴ在线无码播放毛片一线天| 高清色本在线www| 推油少妇久久99久久99久久| 全彩acg本子| 8x8x华人永久免费视频| 日韩精品无码一本二本三本色| 国产chinasex对白videos麻豆 | 欧美成人精品第一区| 国产在线观看首页123|