• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    The First Three Star Wool Fabric Project Will Be Put Into Production In Dongguan

    2014/4/12 23:08:00 65

    Samsung First Wool WeavingWool Weaving ProjectDongguan

    < p > Samsung first woolen weaving project will be put into operation. The output value will be 780 million yuan after the commissioning. The main project of "a href=" http://www.91se91.com/news/index_p.asp "Dongguan" < /a > City -- the Samsung first wool high tech plastic project has entered the finishing stage. It is expected to be formally commissioned in the middle of this month. The construction period is shortened by two months.

    In August last year, Samsung signed the first wool weaving contract to become the second world top 500 in Dalang.

    The project will invest 120 million yuan and occupy 65 mu, and will become a production base integrating R & D, production and sales.

    It is estimated that the annual output value will be 780 million yuan and the annual tax amount will be 60 million yuan after the project is put into operation.

    < /p >


    < p style= "text-align: center" > img align= "center" border= "0" alt= "src=" /uploadimages/201404/12/20140412111121_sj.JPG "/" < < >.


    < p > < strong > multisectoral follow-up to solve problems < /strong > < /p >


    < p > "started in early December last year and is expected to be completed in half a year. Now the construction period is shortened by two months."

    The general manager of Samsung first wool weaving Co., Ltd. told reporters tomorrow that the speeding up of the construction period was benefited from the Dalang Town Committee and the town government, which opened up a "green channel" for key projects. At the same time, the municipal development and Reform Bureau, the Dalang foreign trade and economic Cooperation Bureau, the industrial and commercial sub Bureau and other departments jointly worked out project approval and business licenses for the enterprises, and speeded up the time of issuing licenses.

    < /p >


    < p > tomorrow, Dalang land, planning, construction and other departments have also made a quick start for the enterprises to start the construction process. The team has followed up specially to help enterprises solve practical problems and difficulties, effectively promoting the landing of the project.

    < /p >


    Less than 4 months, the time is short and the efficiency is high, so that p a http://www.91se91.com/news/index_c.asp http://www.91se91.com/news/index_c.asp is more amazing than the top three /a.

    Prior to that, Samsung's first wool weaving took only three months to enter the construction phase of the project from the signing stage. This speed has impressed the top executives of the enterprise: "Samsung is the fastest way to build Dongguan in the country's many investment projects."

    < /p >


    < p > < strong > annual output value is 780 million yuan < /strong > < /p > after commissioning.


    Last August, after the introduction of WAL-MART, Dalang successfully introduced the world's top 500 global electronics and chemical materials leading enterprises, South Korea's Samsung first hair weaving. The project specializes in developing PC plastics, synthetic resins, artificial marble and electronic materials.

    The project is located in Fumin Industrial Park, Dalang town. The project land is 65 mu, the first workshop area is 9560 square meters, and the annual output value is 780 million yuan after the commissioning, and the annual tax is 60 million yuan.

    < /p >


    < p > September 16th, Samsung's first woolen weaving and Yuanda city square, Pine Lake Lang yuan, de Jin high-end leather goods, < a target= "_blank" href= "http://www.91se91.com/" > textile > /a > creative industry center, textile trading square, cool industry, SYU Fu Garden, Yang Wu Sheng force center, Hai Nong Quan Yu, Hu Lian electronics, Wan Hao precision instruments and other 12 key projects started construction, 12 projects total investment amounted to 4 billion 360 million yuan.

    < /p >

    • Related reading

    Sales Of Guangzhou Department Store During Qingming Holidays Increased By 10% Over The Same Period Last Year.

    Guangdong
    |
    2014/4/9 18:39:00
    26

    Samsung'S First Wool Weaving Project Will Be Put Into Operation In Dongguan.

    Guangdong
    |
    2014/4/8 22:48:00
    54

    Where To Go?

    Guangdong
    |
    2014/4/7 14:36:00
    51

    Dun Bi Nu Guangzhou And Life Hall Dress Up Business

    Guangdong
    |
    2014/4/6 22:05:00
    62

    Ear 50% Autumn Winter Clothing Failed

    Guangdong
    |
    2014/4/4 8:40:00
    63
    Read the next article

    地區間的竄貨問題該如何解決?

    竄貨是商業行為,其目的是贏利。經銷商跨過自身覆蓋的銷售區域而進行的有意識銷售就是竄貨。水貨也好,非水貨也好,銷售的產品都是都是廠家自己的,那公司是否想真正的解決國際間竄貨呢?接下來,就和小編一起來看看詳細的資訊吧。

    主站蜘蛛池模板: 国产欧美日韩综合精品一区二区| 欧美成人精品大片免费流量| 成人免费午间影院在线观看| 国产jizzjizz免费视频| 久久久久综合一本久道| 豪妇荡乳1一5白玉兰免费下载| 菠萝蜜视频在线观看免费视频| 日韩在线你懂的| 国产做a爰片久久毛片| 久久久亚洲欧洲日产国码二区| 西西4444www大胆无码| 无人视频在线观看免费播放影院 | 骚视频在线观看| 日本高清二三四本2021第九页| 国产伦一区二区三区高清| 久久久久亚洲Av片无码下载蜜桃| 色吊丝av中文字幕| 幻女free性俄罗斯第一次摘花| 免费无码成人av在线播放不卡| h肉3d动漫在线观看网站| 法国性经典xxxxhd| 国产精品午夜在线播放a| 二区三区在线观看| 蜜臀91精品国产高清在线观看| 我要看a级毛片| 免费人成年轻人电影| 91大神在线免费观看| 欧洲美女与动zooz| 国产午夜一区二区在线观看| 中文字幕丰满伦子无码| 男男同志chinese中年壮汉| 国内自拍视频一区二区三区| 亚洲人成在线影院| 4444www免费看| 日韩精品国产另类专区| 国产日韩av在线播放| 久久久久亚洲av无码去区首| 精品久久久久香蕉网| 国产精品视频1区| 久久国产综合精品欧美| 精品国产三级a在线观看|