• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Heng Tian Heavy Industry's First Overseas Filament Direct Spinning Project Delivered Smoothly To Users.

    2015/1/12 17:41:00 30

    Heng Tian Heavy IndustriesOverseasFilament Direct Spinning Project

    With the signing of the acceptance sheet by Manish, general manager of India RajRayon, Heng Tian heavy industry Limited by Share Ltd in India's first direct melt spinning 125 polyester filament project was formally passed and successfully delivered to users.

    The project has a contract value of about 40000000 yuan, which is a 125 item polyester filament project set up (135 winding heads), including 5 production lines, 3 spinning side blowing cooling production lines, two spinning ring blowing cooling production lines, all use dual cavity (DIO) spinning components, and integrated online information monitoring system. The spinning part of the project is subcontracted to Dalian Tianlun company, and the winding part is made by Hua Ying company. All the 1680 winding heads of Huaying technology are used. In addition, the project is in the International Trade Department of Heng Tian Group, Huaying company and its partner, Yangzhou. Dalian Under the joint efforts of Xin Lun, after two or three years of tracking, through many technical exchanges and business talks, defeated many competitors, successfully signed the project at the end of August 2013.

    It is reported that the project has been highly valued by Heng Tian Group and Huaying company. After signing the project, the company has worked closely with the group's international trade partners to ensure the smooth completion of the project. When the 1680 type of winding head had not been put into the domestic market in large quantities, Huaying company set up a tackling group to strictly control the quality of all links in the manufacturing process, and the sub contractors also went to Dalian production site several times. Technical Supervision Acceptance of important parts ensures timely delivery and product quality.

    During the commissioning phase, Hua Ying sent the most powerful equipment, electrical appliances and craft technicians to India to guide the installation. We should give full play to the backstage effect and solve the problem of feedback on the spot in time, so as to create conditions for the smooth delivery of the project. At the user site, the installation team, solidarity, no conditions, overtime day and night, not only completed the winding part of the installation and commissioning work, but also carried out detailed inspection and trial operation for the mechanical and electrical systems of the 135 winding heads, so that it had the production of machine parts, and at the same time, made mechanical and electrical training materials in both Chinese and English, trained users of electrical and mechanical professionals, analyzed and found the reasons for the dissatisfactory problems raised by the users, and finally formulated the solutions to the users, so that the users' production could be stabilized as soon as possible, and the users were well received.

    stay Heng Tian Group Among the many projects, this project has created several "first": it is the group's first total melt direct spinning project. It is the first melt direct spinning filament project in India market. It is the first set of long filament project set up by the group, and it is also the first large-scale project to use the 1680 type winding head. The successful driving of the project not only shows the capacity of the Limited by Share Ltd, but also lays a solid foundation for further development of domestic and foreign filament package projects. Next, Heng Tian Group will take this opportunity as an opportunity to increase the strength of the filament equipment from the aspects of technology, sales and services.


    • Related reading

    Three Pitfalls In The Development And Operation Of Shopping Centres

    Project Finding Funds
    |
    2015/1/10 20:28:00
    21

    Science And Technology Innovation Project "Shaanxi Industrial Textiles Engineering Technology Research Center" Was Accepted

    Project Finding Funds
    |
    2015/1/9 22:00:00
    45

    Xuancheng Xintang Down Industrial Park Officially Landed

    Project Finding Funds
    |
    2015/1/9 21:34:00
    90

    "Spring" Of Xiangxiang Leather Industrial Park

    Project Finding Funds
    |
    2015/1/1 20:51:00
    26

    Ruyi Textile Garden Opens In Pakistan

    Project Finding Funds
    |
    2014/12/16 19:52:00
    27
    Read the next article

    Short Skirts, Short Skirts, Layers, Mashup, And Perfect Sense Of Freshness.

    In the cold winter, winter clothing is thicker and thicker and smaller. The clever use of shorts, short skirts, such as a single product level mix and match, creates visually slender, and it will be higher. Next, let's take a look at the detailed information.

    主站蜘蛛池模板: 国产毛片哪里有| 67194在线看片| 亚洲成a人片在线看| 精品视频一区在线观看| 欧美巨大xxxx做受中文字幕| 性做久久久久久| 国产在线第一区二区三区| 亚洲自偷自偷在线制服| 二级毛片免费观看全程| WWW夜片内射视频在观看视频 | 欧美激欧美啪啪片sm| 斗鱼客服电话24小时人工服务热线| 国产精品无码久久久久| 免费一级大片儿| 中文精品无码中文字幕无码专区 | 国产综合在线观看| 免费高清av一区二区三区| 久久精品女人毛片国产| 91久久精品一区二区| 第一次处破女18分钟高清| 日本19禁啪啪无遮挡免费| 国产真实偷乱小说| 亚洲精品无码久久久久久久| 一级毛片大全免费播放下载| 被公侵犯电影bd在线播放| 日本三级香港三级人妇99| 国产成人AAAAA级毛片| 亚洲另类激情综合偷自拍图| 99久9在线|免费| 欧美日韩一区二区三区麻豆| 在线观看免费人成视频| 亚洲精品乱码久久久久久自慰| 一个人看的日本www| 男人操女人视频网站| 少妇人妻偷人精品视蜜桃| 国产99久久久久久免费看| 久久精品国产99国产精品澳门| 青青草国产免费| 日本黄大片在线观看| 国产欧美色一区二区三区| 久久精品国产亚洲AV蜜臀色欲|