• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Zhejiang Province Convened Project Summary Meeting Of Sericultural Industry Technology Team

    2019/3/27 21:31:00 6042

    ZhejiangSericulture IndustrySummary Exchange Meeting

                                                                         

         

    In order to better promote Zhejiang sericulture industry technology team project implementation plan, further improve team work and promote project implementation, Zhejiang Agricultural Technology Extension Center held a project summing up and exchange meeting of Zhejiang sericulture industry technology team in Hangzhou City, Zhejiang Province on 19-20 March 2019.

    The meeting was chaired by the team leader and Wu Haiping, deputy director of the Provincial Agricultural Technology Extension Center.

    4 regional test station project leader, 12 demonstration promotion base county (city, district) project leader.

    Each of them has reported and exchanged with PPT for 2016-2018 years (first round) of the provincial sericulture industry technology team project implementation progress, achievements, problems and suggestions; 4 regional test station project leaders, 17 demonstration sites project leader.

    Each of them briefed PPT briefly on the progress of implementation of the technical team of sericultural industry in 2018-2020 years (Second Rounds), the results achieved, and the scientific and technological demand for sericultural industry, and the next work plan.

    This conference mainly summarized and reported the first round of Zhejiang sericultural industry technical team project, of which 4 regional test stations respectively summarized and summarized the "high quality and efficient production technology integration of silkworm eggs", "silkworm safety and efficient production technology integration and application", "silkworm labor saving high-efficiency production technology integration and application", "sericulture resource utilization mode integration and application".

    12 demonstration and extension base counties (cities and districts) respectively summarized and summarized 15 projects, namely, small silkworm rearing, male silkworm cocoon raising, mulberry silkworm pest control technology demonstration and extension, small silkworm artificial diet and silkworm rearing, color cocoon and mulberry production technology, continuous silkworm technology demonstration and promotion.

    Wang Yuejun, the director of Zhejiang Agricultural Technology Extension Center, the deputy director of Zhejiang Agricultural Technology Extension Center, Wu Haiping, the group leader of the sericulture industry team, the post scientist of the national sericulture industry system, Wang Yongqiang, the deputy director of the Zhejiang Academy of Agricultural Sciences, and the senior agronomist of the Zhejiang sericultural technology promotion center.

    Wu Haiping, deputy director of Zhejiang Agricultural Technology Extension Center and chairman of Zhejiang provincial sericultural industry technology team leader, made a summary of the meeting.

    The sericultural industry technology team of Zhejiang province has integrated 8 new technologies and modes, including small silkworm artificial feeding technology, high quality cocoon production technology, safe production technology of autumn silkworm mixed planting area, mulberry silkworm breeding, labor-saving feeding technology, multi batch continuous silkworm breeding mode and technology, hybrid mulberry density planting and cultivation management technology, fruit mulberry cultivation technology, natural color cocoon and silkworm variety breeding technology.

    At the same time, director Wu made a plan for the sericulture industry team work: he emphasized that the industrial technology team gathered three rural six parties, experts from provinces, cities and counties, and interdisciplinary cooperation. It is a platform for technological tackling, a platform for discussion and exchange, and a platform for technology integration.

    First, we should summarize and publicize the results of the first round of the industrial team project, and continue to work hard to implement the second round of sericultural technology projects.

    Industrial technology project is the carrier and key point of team work. Experts should conscientiously fulfill their responsibilities, actively guide, and make demonstration and propaganda for each demonstration point. Two, we must accurately grasp the direction of team work.

    Identifying the team orientation, facing the technology, facing the grass-roots, facing the production, checking the short board of the industry, focusing on solving the important problems that the industry urgently needs to solve in the selection of technology projects, and making proper use of the funds in the project. Three, we should give full play to the pilot test, maturation and integration of the regional test stations.

    The regional test station should take up the problems that need to be tackled in the process of popularization and application, such as new varieties, new technologies and new machines.

    The four is to ensure the standardized use of project funds while organizing and implementing them.

         

         

    • Related reading

    Xu Yingxin Led The Investigation Of Shengze, Rugao And Haian To Support The Industry With High Quality Reform.

    Zhejiang
    |
    2019/3/12 0:05:00
    214

    Zhejiang Long Sheng (600352): Part Of The Controlling Shareholder'S Share Lifted The Pledge Repurchase Paction.

    Zhejiang
    |
    2019/3/11 23:50:00
    21

    Haining "Quality Mall" Starts Quality Manufacturing Standard Work

    Zhejiang
    |
    2019/3/7 20:38:00
    108

    Jiahua Energy (600273): Share Repurchase Ratio Reached 2% And Repurchase Progress

    Zhejiang
    |
    2019/3/5 16:50:00
    22

    Zhejiang Resources (600070): Progress Of Share Repurchase Company

    Zhejiang
    |
    2019/3/2 9:49:00
    48
    Read the next article

    Embroidered Hands, Experience The Gentle And Beautiful In A Slow Time.

    There is a very old name called "needlework". Embroidery is called "embroidered mother &rdquo".

    主站蜘蛛池模板: 中文字幕欧美日韩| 亚洲精品无码久久毛片波多野吉衣 | 精品国产三级a∨在线观看| 惩罚憋尿花蒂揉搓震动| 免费无遮挡无码永久视频| 99视频有精品| 欧美亚洲国产精品久久高清| 国产成人AV免费观看| 中文字幕在线看日本大片| 狠狠躁夜夜躁人人爽超碰97香蕉| 国产精品第9页| 久久夜色精品国产网站| 综合网小说图片区| 国内自产一区c区| 久久精品麻豆日日躁夜夜躁| 美女扒开尿眼让男人桶爽视频 | 曰本女人一级毛片看一级**| 国产乱码精品一区二区三区四川人| 七次郎成人免费线路视频| 深夜放纵内射少妇| 国产成视频在线观看| 上原亚衣一区二区在线观看| 欧美综合区自拍亚洲综合图区| 国产成人精品电影| 三级精品视频在线播放| 欧美精品国产综合久久| 国产卡1卡2卡三卡网站免费| 一区二区三区国产精品| 欧美国产日韩1区俺去了| 国产一级一片免费播放视频| a级毛片免费完整视频| 曰批免费视频观看40分钟 | 国产精品久久福利网站| 久久91精品国产91久久麻豆| 激情综合五月天| 国产婷婷成人久久av免费高清 | 精品国产亚洲一区二区三区在线观看| 国产老肥熟xxxx| 中文字幕精品无码亚洲字| 欧美色视频在线| 国产AV一区二区精品凹凸|