• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Contract Of Loans For Special Funds

    2010/4/30 9:28:00 59

    Contract

    Lenders:



    Borrowers:



    The two sides jointly abide by the "loan contract regulations" issued by the State Council and sign the contract.



    The first is based on (project approval authority and document number).



    Approved borrowers (name and main contents)



    The total investment of the project is 10000 yuan, of which 10000 yuan is raised by itself, and the other ten thousand yuan is applied to the loan unit (loan type).



    The loan is ten thousand yuan.



    Second borrowers agree to borrow money under the borrower's loan purpose.



    Ten thousand yuan.

    Loan period: from year to month to year.

    The borrower shall collect interest from the borrower in accordance with the interest rate grades and calculation time stipulated in the various loan methods.

    Loan use: purchase equipment table (set) ten thousand yuan;



    The construction cost is RMB 10000 yuan.



    Other ten thousand yuan.



    The third party guarantees that within the approved loan amount, the fund will be provided in time according to the time limit stipulated in the loan contract. If it fails to provide loans on time due to its responsibility, it should pay the borrower a penalty for breach of contract and the number of days delayed.

    The liquidated damages shall be paid by the borrower according to the loan interest rate of this loan.



    The fourth borrowers promise to repay the principal in accordance with the following period: ten thousand yuan per year, ten thousand yuan per year, ten thousand yuan per year, ten thousand yuan per year, ten thousand yuan per year, and ten thousand yuan per year.



    The fifth borrowers repay their principal and interest. The two sides agree to pay the following funds according to the relevant regulations:



    1. after the loan project is put into operation, the new income tax will be increased by 10000 yuan.



    2. after the loan project is put into operation, the new tax increase will be $10000.



    3. own funds (including renovation and upgrading funds, trial production fees for new products and production development fund).



    Ten thousand yuan,



    4. depreciation of new fixed assets is $10000.



    5. the cost of the loan project to the competent department is $10000.



    6. other funds are 10000 yuan.



    The sixth lender has the right to supervise the borrower to use the loan in accordance with the approved project implementation plan, design plan and contract stipulations. Without the consent of the lender, the borrower shall not change the content of the project and the purpose of the loan at any time. Otherwise, the lender shall have the right to withdraw or stop the loan, and add part of the interest to the misappropriated part of the loan.



    Seventh, if the borrower fails to repay the loan on time, the guarantor or the guarantor unit shall bear the responsibility to repay the principal and interest.



    The eighth contract is effective after signing the contract by the borrower, the lender and the guarantor, and terminates after the repayment of the principal and interest of the loan.

    The original contract is three copies: the borrower, the lender and the guarantor shall hold one copy; four copies shall be submitted to the one or two branches of the people's Bank of China, the local administration for Industry and commerce, and the Inland Revenue Department.



    Borrower (unit) (official seal)



    Legal representative (position, name) (signature)



    The lender (unit) (official seal)



    Legal representative (position, name) (signature)



    Guarantor (unit) (official seal)



    Date of signing:



    Place of signing:

    • Related reading

    Contract Of Loans For Special Funds

    Contract template
    |
    2010/4/24 11:39:00
    68

    Contract For Assignment Of The Right To Apply For Patents

    Contract template
    |
    2010/3/31 11:08:00
    59

    Written Description Of Land Contract For Sale And Purchase

    Contract template
    |
    2010/3/30 13:14:00
    293

    Written Rules For Compensation Trade Contracts

    Contract template
    |
    2010/3/29 12:56:00
    42

    Specification For Printing Order Contract

    Contract template
    |
    2010/3/27 13:42:00
    44
    Read the next article

    Red Dragonfly Mount Emei International Fashion Integration Shop Completed

    As the largest integrated store in China, the international fashion integration store of Chinese shoes red dragonfly Mount Emei has been unveiled in Mount Emei recently.

    主站蜘蛛池模板: 正能量www正能量免费网站| china同性基友gay勾外卖| 9久热这里只有精品免费| 精品午夜福利在线观看| 成a人片亚洲日本久久| 四虎永久免费地址在线观看| 久久久久亚洲精品无码蜜桃| 18级成人毛片免费观看| 精品国偷自产在线视频| 日韩欧美国产高清| 国产天堂亚洲国产碰碰| 亚洲国产精品一区二区九九| 一本色综合网久久| 精品一区二区三区无卡乱码| 日本伊人精品一区二区三区| 国产免费一区二区三区不卡| 久久久久亚洲AV成人无码 | 99re这里只有精品6| 色五月在线视频| 成人免费一级片| 国产专区在线播放| 亚洲AV日韩AV永久无码色欲| 国产精品亚洲综合五月天| 日韩在线看片免费人成视频播放 | swag合集120部| 漂亮人妻被黑人久久精品| 国产精自产拍久久久久久蜜| 亚洲午夜精品久久久久久人妖| 9久9久热精品视频在线观看| 欧美日韩精品久久久免费观看| 天天摸天天操免费播放小视频 | 军人野外吮她的花蒂无码视频| 久久久久久久久久国产精品免费| 亚洲h在线观看| 日本欧美成人免费观看| 啄木乌欧美一区二区三区| 久久99久久99精品免观看| 第一福利官方导航| 成人免费网站视频| 国产一区二区电影在线观看| 一区二区三区在线播放视频|