Construction And Installation Contract
In the year of 20__, the joint Ocean Shipping Company Limited (hereinafter referred to as Party A) signed the project contract with the blue sky Marine Equipment Co., Ltd. (referred to as Party B).
1. installation engineering name: 12V-400ZC mainframe.
2. project location: the first party is the port of the first, the second, the second and the third.
3. scope of works: drawings and valuations attached to this contract.
4. completion date: the installation work will cooperate with Party A.
Port
Installation works will be completed within sixty (60) days after completion of construction, including 12V-400ZC main engine test run.
5. the total price of installation works: the total cost of the project is $1 billion.
6. payment for installation works:
The first stage: when Party A begins to implement the contract, Party B will pay Party B 15% of the total project price, that is, the total amount of USD.
Second phase: Party A shipbuilding in A port
engineering
At the beginning, Party B will be paid 15% of the total price of the project, that is, the total amount of USD.
The third stage: when installing pipelines,
First party
The total cost of the works to Party B is 10%, that is, the amount of US dollars.
Fourth stage: when the main equipment of the main engine arrives at the construction site, Party A pays Party B 40% of the total project price.
Fifth stage: when the installation works are completed, Party A will pay 10% of the total project price of Party B.
Sixth stage: after the acceptance of the project, Party A will pay 10% of the total cost of the total project price.
7. penalty for breach of contract: Party B shall be responsible for the penalty due to Party B's failure to finish on time, and shall be liable to a penalty for breach of contract, which shall be calculated at 1% of the total price per day.
8. increase or decrease project: if Party A needs to modify, increase or reduce its project plan, the increase or decrease of the total price should be calculated according to the order prescribed by both parties.
If additional quantities are required, the new unit price should be negotiated separately.
If Party A abandonment the completed works or the materials that have arrived at the site for modifying the original plan, after acceptance, Party A shall pay the cost and material cost completed by Party B according to the unit price stipulated by both parties.
9. supervision progress: the supervisory personnel or representatives sent by Party A shall supervise the progress of the project and have the right to supervise and guide.
Party B shall be properly constructed according to instructions of Party A's personnel or representatives, and shall not be ignored by any pretext.
10. project stop: if Party A notifies Party B that the project will be stopped, the reason is not that Party B shall be responsible for it. Party B may stop and request Party A to pay or deduct the amount of the project completed, the material arrived at the construction site and other reasonable expenses.
11. engineering custody: the works completed and the materials, tools and equipment remaining at the construction site at the beginning of the project shall be kept by Party B.
In addition to disasters that human beings can not resist, Party B shall bear all responsibility for damage in custody.
In case of natural and man-made disasters, Party B should give details of the damage and bring forward the price and date of restitution to Party A for the purpose of checking the payment.
If Party A decides not to continue construction, it will terminate according to the tenth provision of the contract.
12. project guarantee: except for natural disasters or due to improper use of Party A, Party B shall ensure that the quality of the project is good for 1 years after acceptance by Party A.
13. incidental clause: Party B shall be responsible for compensation if Party A or other personnel are injured due to the fault of Party B in the course of the project.
However, the damage is caused by the fault of the other engineering personnel contracted by Party A or Party A, and shall be entirely responsible by Party A.
14. Annex: the appendix of this contract shall be deemed to be part of this contract and shall be equally authentic.
The attachment includes: (1) drawing; (2) the valuation list.
15. contract form: this contract is in two copies, each party holds one copy.
Two copies are kept for archiving and archiving for future reference.
16. additional terms: mainframe maintenance - Party B shall provide free and regular maintenance service to 12V-400ZC mainframe for 1 years after Party A's acceptance, and maintain normal operation every six (6) months.
This contract shall enter into force on the date signed by both parties.
Party A: Party committee, Party committee, Party committee, Party committee, Party committee:
The following are: 1.
Contractor (Contractors). The contractor and the owner of the installation project (Promoters) have reached a tacit agreement and signed a contract through negotiation or tendering. The contractor must carry out the construction according to the engineering drawings and the special requirements of the owner, and bear the maintenance business within a certain time. In order to complete the installation task, the contractor also needs to provide construction equipment, special tools, construction supervision engineers and the required labor force.
Project contracting includes General Contractors and Specialist Contractors. The contractor is responsible for the progress, quality, assurance and acceptance of the project. The owner must pay the project schedule on time.
International engineering installation and engineering contracting is a more practical and widely accepted mode of economic and technological cooperation.
- Related reading
- Company news | The First One To Set Up Factories In The United States, How Did This Cotton Leading Enterprise Fare Under The Trade Friction?
- News Republic | The Number Of Gap Brands In China Has Reached 200 Breakthroughs For The First Time.
- neust fashion | Milk Tea Air Jordan 4 "Mushroom" Will Be On Sale Soon!
- Fashion shoes | Nike Air Max 97 Shoes New "Green Glow" Color Matching Release
- Fashion brand | Alfa Industrial X EVISUKURO 2019 Joint Series Is About To Debut, Uniform Street.
- Expert commentary | After The Mid Autumn Festival, The Purchase Price Of New Cotton Rises Everywhere To Boost The New Cotton Market.
- Expert commentary | Dye Prices Rose Again, Polyester Raw Materials Decline In The "Golden Nine Silver Ten" Market Is Not Promising.
- Daily headlines | "I Haven'T Been So Happy For Many Years!" See How Honghe Stirred Up The "Initial Heart" Of The Sweater.
- Daily headlines | Saudi Arabia Gives A Timetable For Resumption Of Production. Demand Is Not Strong, PTA And MEG Are Beginning To Shiver.
- Fashion shoes | New Hundred Lun X Bodega Joint Shoes New "No Bad Days" Color Matching Landing At The End Of The Month
- Japanese Brand Xishan 2010 Autumn Winter Fashion Work Boots
- Private Enterprises In Wenzhou Have Pformed Into New Industries.
- WTAPS 今年秋冬的Brogue Mid Boots
- 60 Textile Industry Standards Implemented In December 1St
- 美國知名休閑鞋履明年春季時尚單品
- H&M&Nbsp; 2011 Spring Dress Lookbook Preemptive Look!
- Gourmet Releases Spring Shoe Latest 2011
- Four Major Marketing Strategy Diseases, Torture Private Enterprises Profit Model
- J.Crew&Nbsp; 2011 Spring And Summer Women'S Sports Leisure Youth Tune!
- Stimulation Is The Best Marketing Tactic.