• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Responsibilities Of Planning And Material Accounting

    2010/11/15 13:17:00 20

    Planning Material Accounting Responsibilities

    (1) conscientiously abide by the state's financial policies, regulations and systems.


    (two) settle accounts and keep accounts according to the accounting rules.


    (three) responsible for the price adjustment of external materials and the adjustment of backlog materials.


    (four) accepting units Material Science The plan should be recorded, archived, summarized, and the amount of material needed to be marked, the time needed to be used and the amount of accounts needed to be set up. In order to grasp the resources and balance, timely submit the application plan for the material plan, and provide and specify the technical requirements. The material plan of the whole project requires that the above work be done in two days within a week, and report to the chief of the Department in writing immediately.


    (five) fill in the check list of incoming goods, and check the contract number, name, specification, type, quantity, unit price and total price in detail. If the credentials of odometer, pound code sheet, checklist, certificate, certificate of quality, certificate of consignment, insurance list, receipt and so on are all complete, check with the storehouse, check the acceptance situation, there is a problem to refuse payment, and immediately contact with the supplier, and the goods can not be paid until they arrive. Only after acceptance of all the indicators is acceptable, can the inspection documents be filled and the accounts paid.


    (six) materials according to the project plan According to the progress schedule, the quota will be issued. Need Plan alteration and substitution shall be signed and approved by the technical department and the engineering supervisor. In addition to the material requisition for infrastructural projects, other production, maintenance, units and individual transfer materials must be approved and signed by the section chief, and the internal materials of the infrastructure must be signed by the director.


    (seven) from 26 days to 3 days per month, we will input the receipts, requisition lists and allocation documents to the computer, and report the income, consumption and inventory of the materials to the school finance. All statistical reports should be reported before 3 days of each month. The number must be accurate and the time should be timely. Before 10 every month, report the financial statements of last month to the school finance section and supply section chief.


      (eight) use computers to set up the consumption ledgers and inventory dynamic tables of individual engineering materials. After the completion of the single project, the materials consumption statement of the project should be printed in time and reported to the budget section. The inventory dynamic report will be reported to the chief of the Department and the warehouse 5 days before the end of each month.


    (nine) other temporary tasks assigned by the completion office and the branch leaders.

    • Related reading

    Nine Responsibilities Of Chief Of Budget Section

    Accounting teller
    |
    2010/11/15 13:16:00
    111

    項目預算員崗位職責

    Accounting teller
    |
    2010/11/15 13:15:00
    56

    Management Core Of Financial Personnel

    Accounting teller
    |
    2010/11/15 13:04:00
    54

    The Setting, Registration Requirements And Basis Of Cash Journal

    Accounting teller
    |
    2010/11/13 11:34:00
    301

    How To Deal With Cash Long And Short Money?

    Accounting teller
    |
    2010/11/13 11:33:00
    468
    Read the next article

    APEC參會領導人不統一著裝 夫人集體“搶鏡”

    APEC領袖會議的重頭戲之一,就是看各國領袖是要穿日本什么服裝拍大合照。

    主站蜘蛛池模板: 精品伊人久久大线蕉地址| 一区二区视频在线免费观看| 欧美另类黑人巨大videos | 日韩精品极品视频在线观看免费| 最好2018中文免费视频| 国产精品66在线观看| 亚洲人成伊人成综合网久久久 | 无码人妻精品一区二区三区蜜桃| 国产八十老太另类| 久久免费区一区二区三波多野| 黄瓜视频在线观看| 日本午夜电影院| 四虎永久免费影院| 一区二区三区观看| 狠狠色综合网久久久久久| 国模视频一区二区| 亚洲国产欧洲综合997久久| 亚洲欧美日韩精品久久奇米色影视| 综合一区自拍亚洲综合图区| 成人午夜视频精品一区| 免费无码黄网站在线观看| 中文字幕理伦午夜福利片| 糟蹋顶弄挣扎哀求np| 女人张开腿让男人桶视频免费大全 | 国产亚洲人成网站在线观看| 中文毛片无遮挡高清免费| 精品久久人人妻人人做精品| 外国女性用一对父子精液生子引争议| 亚洲欧美国产精品完整版| 99这里只有精品66视频| 精品亚洲一区二区三区在线播放| 天天综合视频网| 亚洲成aⅴ人在线观看| 国产91精品在线| 欧美、另类亚洲日本一区二区| 国产美女视频网站| 亚洲欧美中文字幕在线网站| 五月婷婷一区二区| 拔擦拔擦8x华人免费久久| 免费播放在线日本感人片| 18videosex日本vesvvnn|