• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Home Decoration Project Contract

    2011/1/4 16:36:00 42

    Home Decoration Contract

    The employer (Party A): the company is a member of the company.


    Residence: telephone, telephone, telephone, telephone, telephone, fax, telephone, fax, telephone, fax, fax, telephone, fax, telephone, fax, telephone, fax, telephone, telephone, telephone, telephone, etc.


    Principal agent: telephone, telephone, telephone, telephone, telephone, fax, telephone, fax, telephone, fax, fax, telephone, fax, telephone, fax, telephone, fax, telephone, telephone, telephone, telephone, telephone, telephone, etc.


    The contractor (Party B): Mr.


    Residence: telephone, telephone, telephone, telephone, telephone, fax, telephone, fax, telephone, fax, fax, telephone, fax, telephone, fax, telephone, fax, telephone, telephone, telephone, telephone, etc.


    The legal representative is: telephone, telegraph, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone operator:


    The designer of this project is: TD, TK, TK, TK, TK, TK, TK, TK, TK, TK, TK, TK, TM, TM, TM, TM, TM, TM, TM, TM, TM, TM, TM, TM, etc.


    The head of the construction team is: head of the construction team.


    In accordance with the provisions of the contract law of the People's Republic of China and relevant laws and regulations, Party A and Party B, on the basis of equality, voluntariness and consensus, have reached the following agreement on the decoration and decoration of the employer's family room (hereinafter referred to as the project):


    The first engineering survey


    1. the name of the project is: the name of the project is: the first, the second and the second.


    2. The project location is: location, location, location, location, and location.


    3. Scope of contract: see the budget form attached to the contract.


    4, the mode of project contracting: the two sides agree to adopt the following modes of contract:


    (1) contractor contractor and material.


    (2) the contractor has contracted labor and some auxiliary materials, and the employer has provided the main materials for decoration.


    (3) contractor contractor and employer.


    (Annex) the contractor / employer's list of materials for decoration and decoration signed by the two parties.

    )


    Second construction drawings


    The construction drawings of the two parties shall be provided by the following modes:


    (1) the employer shall design and provide the construction drawings and drawings in two copies, the employer and the contractor each.


    (2) the employer entrust the contractor to design the construction drawings, and the design fee (capital) shall be paid by the employer (the cost is not in the price of the project).


    After confirmation of the construction drawings by both parties, the supplier shall be responsible for obtaining the confirmation or approval of the departments concerned before the agreed date of commencement.


    Construction drawings are made in two copies, each party holding one copy as the appendix to this contract.


    Third party A's work


    1, the day before the start of work, all vacated or partially vacated houses, remove obstacles (except contracts have been cleaned up), take protective measures against furniture and furnishings that fail to vacate all houses, and prepare for contractors to enter.


    2, handle all kinds of application and approval procedures needed for engineering construction to ensure that Party B can enter the construction smoothly, except that the laws, regulations and rules should be handled by Party B.


    3, provide water supply and power supply that meet the construction requirements, and coordinate the relationship between neighbourhood and management.


    4. Take part in the supervision of the quality and progress of the project and take charge of the entry and completion confirmation.


    5. During the construction period, it is still necessary to use part of the building. It should be responsible for the protection of the construction site, and should pay attention to providing various convenient conditions for the construction.


    6, pay the project cost according to the agreed time limit, and pay all kinds of taxes and fees that should be borne by them according to the regulations.


    Fourth article B work


    1. participate in the construction drawings or practices to explain the meeting or the scene, and draw up the construction plan and plan for the confirmation and confirmation of Party A.


    2. in the construction, we must strictly carry out the safety construction, sweeping standards, fire prevention regulations, construction codes and quality standards.


    3. without the approval of Party A or the approval of the relevant departments, the original building structure and all kinds of equipment and pipelines should not be arbitrarily dismantled.


    4. protect the furniture, furnishings and water and electricity pipelines of the original rooms, and ensure the smooth flow of the upper and lower pipes in the living room.


    5. for the relevant matters in the construction process, such as the entry of materials, the acceptance of the concealed works, the completion and acceptance, etc., which need confirmation by the first party, the necessary preparation time shall be given in time.


    6. strictly enforce the provisions of the construction site management, do not nuisance and pollute the environment, ensure the cleanliness of the construction site, after the completion of the project is responsible for cleaning the construction site.


    7. before the completion of the project, the site facilities and finished products shall be protected.


    Fifth article about construction period


    1. the duration of the project is: the year of construction, the date of commencement, the date of completion, the date of completion, and the date of completion.


    2. due to the reasons of Party A and its agent (representative), such as not timely supply of materials, untimely payment of works, etc., the construction period will be delayed.

    Due to the delay of the time limit due to Party B and his agent (representative), the duration of the project will not be postponed.


    3. due to the following factors, which lead to the failure to complete the work, the duration of the project is postponed.


    (1) force majeure, such as bad weather, water cut, power failure, natural disasters, war and riots, which are seriously affected by construction.


    (2) changes in the quantities and design changes agreed upon by both parties;


    (3) because of the delay of the project due to the third party that has nothing to do with Party A and Party B, the third party factors include, but are not limited to, the management of the location (small) area and the unreasonable actions of the next door neighbours.


    (4) the delay of the construction period or the waste of testing time caused by the adoption of new materials or new processes by Party A's consent;


    (5) other circumstances agreed upon by both parties as agreed by the two parties.


    Sixth article on the supply and storage of materials


    1. the materials and equipment provided by any party must be qualified products conforming to the laws and regulations, and must meet the standards and design requirements stipulated in this contract.

    The supplier shall deliver the materials and equipment to the construction site on time and on a quantity basis, and notify the other party to check and confirm the signature.


    2. if any material and equipment provided by one party is different from the specifications or specifications, the other party shall have the right to request the replacement, and the provider shall replace it.

    The cost increase resulting from this is partly borne by the provider.


    3. after entering the field, the materials and equipment shall be kept and used by Party B. if the improper waste, damage or loss due to improper storage or improper use shall be borne by Party B, the normal consumption in the course of construction shall be excluded.


    The seventh item is about quality and acceptance.


    1. the project takes the construction drawings, instructions, design changes and the People's Republic of China national standard code for construction of residential decoration and decoration (GB 50327-2001) as the quality assessment and acceptance criteria.


    2. both Party A and Party B should handle the inspection and acceptance procedures of hidden works and intermediate works in a timely manner. If Party A fails to attend the inspection on time, the duration of the project should be postponed.


    3. Party A is responsible for Party A's own command of Party B's personnel or third party personnel for the quality of the works caused by the construction.

    If Party B is responsible for rework, the cost of rework shall be the responsibility of Party A.


    4. after the completion of the project, Party B shall inform Party A of acceptance. Party A shall organize the acceptance within the day after receiving the notice of acceptance and check the pfer procedures.


    5. during acceptance, the qualified rate of the project is up to% of the gross domestic product (the ratio of the above price shall be the same). The maintenance or rework of other unqualified items (excluding the uncompleted project or finished product procedure) will not affect the establishment of the completion date, and Party A shall confirm this.


    6. Party B promises to guarantee the construction project from the date of completion.

    Defective products, improper use, man-made damage and damage caused by non engineering projects are not covered by the warranty.

    If a state administrative department or an industrial organization has issued a specific warranty period or exemption for individual projects or materials before the signing of this contract, the provisions of the state administrative departments or industrial organizations shall prevail.


    7. other warranty or non warranty terms stipulated by the two party: 1.


    It is very popular. It is very popular.


    8. Party A shall not use the project prior to acceptance.


    The eighth item is about the price and settlement of the project.


    1. the parties agree to pay the following works according to the following modes:


    (1) after the contract comes into effect, the employer will pay the project directly to the Contractor by pressing the agreement in the table.


    The amount of payment will be paid at the payment stage or time.


    For the first time, it is the first time for the first time.


    For the second time, it will be paid by the people in the first half of the year.


    For the third time, it will be paid by the people in the first half of the year.


    The total cost of the project is fourth after the acceptance of the project. The total cost of the project is 5%.


    (2) other modes of payment: the first, the second, the third, the second, the third, the second, the right, the right, the wrong, the great.


    2. the parties agree that the settlement method of the project shall be settled according to the following terms:


    (1) fixed price. The total price of this project is the gross domestic product.


    (2) the unit price remains unchanged, calculated according to the actual amount plus the attrition rate, but the total price shall not exceed the gross domestic product price.


    A. latex paint and paint category: wall area (minus doors and windows) + top area +6% * mosaic part of the area;


    B. tile area is: the actual area +6% * actual area;


    C. solid wood flooring area: the actual area +6% * actual area, mosaic part of the area +10% * mosaic part of the area;


    D. woodworking wardrobe class area: the actual area (square meter integer value, the decimal is not enough 0.5 square meters according to 0.5 square meters, exceeding 0.5 square meters according to 1 square meters).


    E. other items are calculated by item.


    F. other projects based on square meters are: the actual area +6% * actual area;


    G. specific quotation after measurement of the project.


    H. The items purchased by Party A agree to be purchased within the budgetary cost, and can be adjusted by Party A's consent.


    3. special expenses agreement:


    (1) in the course of construction, all water and electricity charges incurred at the construction site shall be the responsibility of Party A.


    (2) in the course of construction, the penalty is paid by Party B because Party B's factor is fined by the law enforcement organization or the administrative organ. If Party B's act is caused by Party A's request or command, the penalty shall be borne by Party A.


    (3) the tax annexes are not included in the budgets of the annexes of the contract, and the taxes and fees shall be paid to the relevant departments by Party A according to the actual amount of taxation; the tax and fee already specified shall be borne by Party B.


    (4) if the property management organization receives more than the normal pportation cost in the property area, Party A shall be responsible for negotiating or subsidize the difference to Party B.


    4. Party B shall execute the project according to the budget annex signed by both parties.

    If Party A adds new project, sign another contract.

    In the case of money involved, Party A shall pay Party B before the acceptance of the project in accordance with the prepayment of 50% and the completion of the project by 50%.

    If the material amount is greater than 50% of the item, Party A shall pay Party B the materials according to the actual proportion.


    5. after acceptance of the project, Party B shall send the relevant information to Party A, and the two sides will carry out the project settlement.

    If the employer has no objection within the day after receiving the information, he shall agree to make the project settlement according to the information. The two sides shall fill out the project settlement sheet and sign the contract, and Party A shall pay the Party B's works according to the agreed time limit.


    The ninth project budget document (table) belongs to the appendix of this contract. The items listed in the contract are not allowed to be added randomly except after the accident.

    change

    Delete.


    Tenth responsibilities and penalties


    1. Party B shall be responsible for construction scheduling, safety management and other matters, and other personnel, including Party A, shall not interfere unreasonably.

    Party A directs workers without authorization.

    personally

    Party A shall take full responsibility for any operation and losses and accidents arising therefrom.


    2. the delay in the construction period due to the causes of Party B and his agent (representative) shall be paid to Party A for breach of contract every day for one day.


    3. Party A shall be compensated for the delay due to the cause of Party A and his agent (representative).

    cause

    The cost of labor costs.


    4. if Party A fails to pay Party B's works in full in accordance with the agreed time limit, Party B shall pay the liquidated damages for Party B's deferred payment in accordance with the requirements of the company.


    5. if Party A fails to process the acceptance procedures, Party A shall be responsible for the loss caused by Party A's early use or unauthorized use of the finished products.


    6. when a contract is unable to continue due to one party's cause, the party shall notify the other party in time, terminate the contract, and compensate the party for the corresponding economic losses.


    7. if Party B is affected by the force majeure, it shall take timely measures to avoid the loss expansion and notify Party A of the relevant circumstances.

    Otherwise, the expanded portion of the loss should be liable for compensation.


    The eleventh parties, if there is dispute over the execution of the contract, shall be settled amicably through negotiation: if the negotiation fails, it may be submitted to the people's court for litigation.


    Twelfth supplementary provisions


    1. the contract is in two copies, each party holding one copy, with the same legal effect.


    2. the termination of this contract is automatically completed.


    Party A (signature): Mr. Gai Zhang, the first party (signature): the company is a company.


    On site representative (signature): Site Representative (signature):


    The name of the certificate is: the name of the document, the name of the document, the name of the document: "the", "the", "the", "the", "the", "the", "the".


    The issuing body: the first, the first, the second, the third, the second, the third, the right, the right, the wrong.


    Identification number: the number of documents: No.


    This is the year of the year.

    • Related reading

    Company Cooperation Contract Template

    Contract template
    |
    2010/12/31 14:17:00
    257

    Principal-Agent Import Agreement

    Contract template
    |
    2010/12/24 11:41:00
    85

    Government Procurement Tendering Agreement

    Contract template
    |
    2010/12/24 11:41:00
    129

    Futures Brokerage Contract

    Contract template
    |
    2010/12/23 16:05:00
    68

    Futures Trading Commission Agreement

    Contract template
    |
    2010/12/23 15:54:00
    71
    Read the next article

    Franchise Contract

    The sixteenth item is about any employee, agent, representative, affiliate of the franchisee who has confirmed the franchisee, and so on, and does not make any statement to the franchisee.

    主站蜘蛛池模板: 嫩草视频在线免费观看| 精品伊人久久久久7777人| 欧洲精品码一区二区三区| 欧美成人中文字幕dvd| 天堂中文在线资源| 国产一区二区在线视频| 久久久午夜精品理论片| 1000部拍拍拍18勿入免费凤凰福利| 直播视频区国产| 天天想你电视剧| 亚洲精品国精品久久99热| 91香蕉视频导航| 欧美姓爱第一页| 国产探花视频在线观看| 亚洲啪啪av无码片| 日本色图在线观看| 日韩精品无码一区二区三区AV| 国产国语videosex| 中文字日本乱码| 精品午夜寂寞黄网站在线| 天天在线综合网| 亚洲日本国产精华液| 日本高清xxxxx| 日本亚洲高清乱码中文在线观看| 国产三级无码内射在线看| 久久精品中文字幕无码| 青青操免费在线观看| 日韩精品专区在线影院重磅| 国产免费131美女视频| 久久人人妻人人做人人爽| 美女视频一区二区| 夫妇交换性3中文字幕| 亚洲成人在线免费观看| 国产喷水女王在线播放| 最近中文字幕免费完整| 国产成人综合日韩精品无码 | 精品国产一区二区三区久久影院 | 国产精品熟女视频一区二区| 亚洲酒色1314狠狠做| a级毛片毛片免费观看永久| 欧美精品免费在线|