How To Draw Up The Lease Contract For Construction Vehicles
Date of signing date
Contract No.
Lessor: * * * * * freight company
Tenant: construction team three * * * * construction company
1. The Lessor agrees to lease the four tons of the weight release vehicle to the lessee according to the need of the lessee, making the following terms through consultation.
Two. The rented car is limited to the use of sand, cement, bricks, timber and precast boards. The lessee only has the right to dispatch, and the driving safety and technical operation are the responsibility of the taxi driver.
Three, the lessee shall be responsible for the maintenance of the vehicle to be rented. If the vehicle equipment is damaged during the time of the rent withdrawal, the lessee shall be responsible for the restoration of the original status or compensation, and the rental fee shall be paid according to the repair period. The damage caused by the driver's improper driving by the lessor shall be borne by the lessor. If the lessee fails to use the leased vehicle properly according to the contract, the lessee shall not pay the rent that the tenant can not use, and the lessor shall also pay the liquidated damages for the leaseholder's yuan every day.
Four. lease period For a year, from 19 to 19, if the lessee continues to use or Discontinue use Consultation should be made to the lessor 5 days ago, otherwise the rental fee will be leased according to the contract or the vehicle will be repatriated according to the contract period.
Five, the rent is $1 per month. Effective date of contract It starts monthly, and rents on a monthly basis. It charges less than one month per month.
Six. The fuel used is the responsibility of the lessee.
Seven, liability for breach of contract. The lessor shall not return the vehicle without authorization, otherwise it will double the claim to the lessee according to the rent. The lessee must pay according to the time stipulated in the contract and the rent. Otherwise, each day will be charged a day's rent.
Eight, other unfinished matters shall be discussed by the two parties and attached separately.
Nine. This contract is in duplicate and each party holds one original copy, which is sent to the relevant authority for record.
Lessor: (seal) the lessee: (seal)
Signature of the legal representative: signature of the legal representative:
- Related reading
- Industry data | 09-10 Season Final Auction South Africa Wool Market Positive Trend
- Visual gluttonous | [Picture] Summer Wear Creates S Curve &Nbsp; No Weight Loss Is Still Visible.
- Expo News | 2010 Shanghai World Expo Jiangsu Activities Week Cultural And Artistic Activities
- Industry data | 服裝行業需求穩步回升
- Industry data | 4月份我國服裝及衣著附件出口回升
- Visual gluttonous | Rosie, A Transformers Girl, Is Slightly Embarrassed In Her Tight Looking Skirt.
- In-depth reporting | Analysis Of The Recovery Of China'S Textile Exports In The First Quarter
- Expo News | Volunteers Hold More Than 100 Children To See The Expo.
- Fashion trend | The Very Simple Black And White Paris Imprint Under The Simple Background
- In-depth reporting | Sports Marketing Of Quanzhou Garment Enterprises Is Becoming More Rational.
- Research On CXWJ1280 Rapier Loom Weaving Machine
- Put Together A Lot Of Ideas To Make Clothes Display Vivid.
- ZARA And AGG Are Fighting.
- 用談戀愛的方式做零售
- The Popularity Of The Internet Is The Preferred Destination For The Chinese Sea.
- Quanzhou Textile And Footwear Enterprises Crack Down On Excess Capacity And How To Get Out Of The Mire?
- Chile'S Largest Export Market For Shoes In Peru In October.
- Dongguan Shoe Companies Face Challenges In 2014 And Look For New Breakthroughs.
- India Men'S Formal Shoes Report Released
- 巴基斯坦非紡織品行業陷入困境 唯鞋業出口“獨好”