• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    How To Formulate Contracts For Ocean Pportation

    2015/5/1 22:44:00 24

    Ocean PportationContractsTemplates

    Contracting parties:

    Party A agrees to entrust the Transportation Bureau (hereinafter referred to as Party B) for the purpose of consignment of goods, and Party B agrees to undertake the shipment.

    In accordance with the requirements of the "economic contract law" and the "maritime pportation management regulations", the two sides have concluded this contract through negotiation, so that both parties can abide by it.

    Article 1 pport method

    Party B shall dispatch one vessel of tonnage and tonnage (ship's cargo hoisting equipment), which shall be shipped from port to port in accordance with the requirements of the current charter party pport.

    Second goods centralization

    Party A shall, within the specified time specified by Party B, centrally sell the goods in the port at the port of Canton, and Party B shall send the ship within five days after the goods are assembled.

    Third shipping time

    Party A agrees to arrange the unloading of the goods after receiving the port of arrival, and shall be implemented by Party B and ready to receive the goods (the opening date is specified by Party B).

    The loading time is within hours from the time when the ship arrives at the port.

    Fourth terms of arrival

    When the ship has completed the formalities, the goods will be pported to the port of destination within hours.

    Otherwise, it will bear the delay fee according to the third regulation.

    Fifth article

    Sailing contact

    Party B shall notify Party A to prepare for unloading after the completion of the loading of the vessel, and notify Party A to send the pilot on time, if the vessel is to be pilotaged, and the cost shall be borne by the party.

    Sixth ship unloading time

    Party A guarantees that Party B will arrive at the anchorage area of the port and remove the cargo from the anchor hour.

    Otherwise, Party A will pay a delay of 0.075 yuan per ton to Party B in excess of time. In the course of loading and unloading, the time of loading and unloading operation due to weather will be deducted from the actual influence time by Party A and Party B's visa.

    Seventh pport quality

    When Party B is loading, Party A shall send the personnel to supervise the installation, instruct the workers to carry out the operation according to the rules and seal the hatch after loading, and Party A can escort the escort (free one person) with the ship.

    Party B guarantees that the original shipment is responsible for the quantity and quality of the goods pported by the party except for losses arising from the safety conditions of the ship.

    Eighth article

    Transportation cost

    According to the first class freight rate of the first class freight rate, the freight charge of the ship's tonnage cargo is 50% yuan, and the total cost is RMB.

    ---

    Port loading charges are calculated according to the relevant rates of port and port charges.

    The cost of unloading ships shall be directly handled by Party A directly with the port of arrival.

    Ninth

    Cost settlement

    After the contract is signed by both parties, Party A shall prepay to Party B the cost of pportation in advance.

    After the unloading of the ship, Party B will settle the bill with Party A on the basis of the cost of pportation.

    The tenth is the original contract in two copies. Each party holds one copy, one copy of each copy, and one record for each department.

    If there are any unsettled matters in this contract, the two sides shall make full consultation with the relevant provisions of the maritime pport administration of the traffic department.

    The supplementary provisions have the same effect as this contract.

    This contract is submitted to the notary public office for notarization (or by the administrative department for Industry and Commerce).

    Party A, Mr. Gai Zhang,

    The representative is: "Wei" ("signature").

    Bank of deposit:

    Account No.:

    Party B: Gai Zhang

    The representative is: "Wei" ("signature").

    Bank of deposit:

    Account No.:

    Year of the year


    • Related reading

    設備搬遷合同如何擬定

    Contract template
    |
    2015/4/29 21:04:00
    22

    How To Prepare Vehicle Waybill?

    Contract template
    |
    2015/4/28 20:22:00
    22

    Model Documents For Tendering Of Port Works (Trial)

    Contract template
    |
    2015/4/25 14:07:00
    33

    Company Leasing Business Contract Procedure Template

    Contract template
    |
    2015/4/24 22:36:00
    16

    Contract For Tendering And Bidding Of Engineering Construction

    Contract template
    |
    2015/4/23 20:50:00
    15
    Read the next article

    The Problem Of Modern Enterprise Management

    Different factors may have different preferences, capital, skills, information and endowments. The rational elements have the participation of the main body in the contract of the enterprise, and contribute their resources to the enterprises to try to get rewards from the operation of the enterprises.

    主站蜘蛛池模板: 国产黄大片在线视频| 国产又爽又黄无码无遮挡在线观看 | 七仙女欲春3一级裸片在线播放 | 精品国产v无码大片在线观看| 野花社区视频在线观看| 老师邪恶影院a啦啦啦影院| 麻豆天美精东果冻星空| 美女又黄又免费的视频| 狠狠色丁香久久婷婷综合 | 国产一区二区三区日韩精品| 免费国产在线观看不卡| 免费看少妇作爱视频| 亚洲欧美日韩综合一区久久| 九九久久精品国产AV片国产| 丰满肥臀风间由美系列| igao视频网站| 99精品热女视频专线| 亚洲www在线观看| 欧美xxxx狂喷水喷水| 美妇岳的疯狂迎合| 欧美精品第一页| 欧美国产日韩a在线视频| 欧美另类69xxxx| 穿透明白衬衫喷奶水在线播放| 欧美婷婷六月丁香综合色| 欧美在线视频网| а√在线地址最新版| 美女AV一区二区三区| 成年人在线免费观看网站 | 动漫美女被免费漫画| 中文天堂网在线最新版| 国产又污又爽又色的网站| 欧美一级中文字幕| 国产真实伦偷精品| 亚洲av永久无码精品水牛影视| 色多多福利网站老司机| 欧美三级不卡视频| 国产欧美另类精品久久久| 九九99re在线视频精品免费| 2020亚洲欧美日韩在线观看| 美女把尿口扒开让男人桶到出水|