    Construction And Installation Contract

    2010/11/8 10:48:00 46

    Construction And Installation Contract

    In the year of 20__, the joint Ocean Shipping Company Limited (hereinafter referred to as Party A) signed the project contract with the blue sky Marine Equipment Co., Ltd. (referred to as Party B).


    1. installation engineering name: 12V-400ZC mainframe.


    2. project location: the first party is the port of the first, the second, the second and the third.


    3. scope of works: drawings and valuations attached to this contract.


    4. completion date: the installation work will cooperate with Party A.

    Port

    Installation works will be completed within sixty (60) days after completion of construction, including 12V-400ZC main engine test run.


    5. the total price of installation works: the total cost of the project is $1 billion.


    6. payment for installation works:


    The first stage: when Party A begins to implement the contract, Party B will pay Party B 15% of the total project price, that is, the total amount of USD.


    Second phase: Party A shipbuilding in A port

    engineering

    At the beginning, Party B will be paid 15% of the total price of the project, that is, the total amount of USD.


    The third stage: when installing pipelines,

    First party

    The total cost of the works to Party B is 10%, that is, the amount of US dollars.


    Fourth stage: when the main equipment of the main engine arrives at the construction site, Party A pays Party B 40% of the total project price.


    Fifth stage: when the installation works are completed, Party A will pay 10% of the total project price of Party B.


    Sixth stage: after the acceptance of the project, Party A will pay 10% of the total cost of the total project price.


    7. penalty for breach of contract: Party B shall be responsible for the penalty due to Party B's failure to finish on time, and shall be liable to a penalty for breach of contract, which shall be calculated at 1% of the total price per day.


    8. increase or decrease project: if Party A needs to modify, increase or reduce its project plan, the increase or decrease of the total price should be calculated according to the order prescribed by both parties.

    If additional quantities are required, the new unit price should be negotiated separately.

    If Party A abandonment the completed works or the materials that have arrived at the site for modifying the original plan, after acceptance, Party A shall pay the cost and material cost completed by Party B according to the unit price stipulated by both parties.


    9. supervision progress: the supervisory personnel or representatives sent by Party A shall supervise the progress of the project and have the right to supervise and guide.

    Party B shall be properly constructed according to instructions of Party A's personnel or representatives, and shall not be ignored by any pretext.


    10. project stop: if Party A notifies Party B that the project will be stopped, the reason is not that Party B shall be responsible for it. Party B may stop and request Party A to pay or deduct the amount of the project completed, the material arrived at the construction site and other reasonable expenses.


    11. engineering custody: the works completed and the materials, tools and equipment remaining at the construction site at the beginning of the project shall be kept by Party B.

    In addition to disasters that human beings can not resist, Party B shall bear all responsibility for damage in custody.

    In case of natural and man-made disasters, Party B should give details of the damage and bring forward the price and date of restitution to Party A for the purpose of checking the payment.

    If Party A decides not to continue construction, it will terminate according to the tenth provision of the contract.


    12. project guarantee: except for natural disasters or due to improper use of Party A, Party B shall ensure that the quality of the project is good for 1 years after acceptance by Party A.


    13. incidental clause: Party B shall be responsible for compensation if Party A or other personnel are injured due to the fault of Party B in the course of the project.

    However, the damage is caused by the fault of the other engineering personnel contracted by Party A or Party A, and shall be entirely responsible by Party A.


    14. Annex: the appendix of this contract shall be deemed to be part of this contract and shall be equally authentic.


    The attachment includes: (1) drawing; (2) the valuation list.


    15. contract form: this contract is in two copies, each party holds one copy.

    Two copies are kept for archiving and archiving for future reference.


    16. additional terms: mainframe maintenance - Party B shall provide free and regular maintenance service to 12V-400ZC mainframe for 1 years after Party A's acceptance, and maintain normal operation every six (6) months.


    This contract shall enter into force on the date signed by both parties.


    Party A: Party committee, Party committee, Party committee, Party committee, Party committee:


    The following are: 1.


    Contractor (Contractors).

    The contractor and the owner of the installation project (Promoters) have reached a tacit agreement and signed a contract through negotiation or tendering.

    The contractor must carry out the construction according to the engineering drawings and the special requirements of the owner, and bear the maintenance business within a certain time.

    In order to complete the installation task, the contractor also needs to provide construction equipment, special tools, construction supervision engineers and the required labor force.


    Project contracting includes General Contractors and Specialist Contractors.

    The contractor is responsible for the progress, quality, assurance and acceptance of the project.

    The owner must pay the project schedule on time.


    International engineering installation and engineering contracting is a more practical and widely accepted mode of economic and technological cooperation.

    • Related reading

    Contract For Postal Enterprise Operation

    Contract template
    |
    2010/11/6 9:36:00
    89

    Contract For Housing Decoration

    Contract template
    |
    2010/11/5 10:01:00
    53

    Contract For Development Of Barren Hills

    Contract template
    |
    2010/11/4 9:56:00
    54

    Hotel Contract

    Contract template
    |
    2010/11/3 13:36:00
    141

    Hotel Contract Agreement

    Contract template
    |
    2010/11/2 9:44:00
    464
    Read the next article

    Levi'S: US Dollar Depreciated &Nbsp; Jeans Price Had To Rise.

    "More chemical fiber and less cotton material" has become a "saving" tactic for Western clothing industry to deal with record cotton prices. The surge in cotton prices has begun to spread to the garment industry, and some factories even raise the factory's ex factory price by 30%.

    主站蜘蛛池模板: 中文字幕无线码一区二区| 国产福利91精品一区二区| 国产720刺激在线视频| 国产三级精品三级男人的天堂| 亚洲乱色伦图片区小说| 中国娇小与黑人巨大交| 第一福利在线观看| 欧美日韩亚洲一区| 无码视频免费一区二三区| 国产在线果冻传媒在线观看| 亚洲熟妇AV乱码在线观看| 久久久久99精品成人片试看| 521色香蕉网站在线观看| 欧美疯狂ⅹbbbb另类| 小魔女娇嫩的菊蕾| 全免费a级毛片免费看无码| 久久精品女人天堂AV免费观看| 99精品热视频| 苍井空浴缸大战猛男120分钟| 日本动漫打扑克动画片樱花动漫 | 香蕉视频一区二区三区| 日韩一区二区三区电影在线观看| 国产麻豆媒一区一区二区三区| 亚洲福利一区二区三区| 18女人腿打开无遮掩| 男人扒开双腿女人爽视频免费 | 大香网伊人久久综合网2020| 国产伦精品一区三区视频| 久久99精品久久久久久久久久| 美女开嫩苞视频在线播放| 婷婷国产成人精品视频| 四虎影视8848a四虎在线播放| 久久天天躁狠狠躁夜夜2020一| 日本阿v精品视频在线观看| 欧美精品久久天天躁| 国产第一福利影院| 久久久久久曰本av免费免费| 精品少妇一区二区三区视频| 成年女人黄小视频| 国产中文字幕第一页| 一本色综合久久|