Equipment Repair Template
The following terms are hereby negotiated through the amicable negotiation between the company and the company (hereinafter referred to as the ordering party) and through friendly negotiation.
The first definition
The "acceptance manual" refers to a document provided by the contractor and confirmed by both parties for the inspection equipment to be in conformity with the technical specifications and the specified data standards.
"Specified data" refers to the drawings, data and other information necessary for the implementation of this agreement related to this system.
"Defects or defects" refers to the equipment (structure or performance) that does not meet the relevant requirements of the acceptance manual.
"Site acceptance" is the final acceptance of the equipment repaired by the designated manufacturer according to the acceptance manual.
"Technical specification" means schedule A of this agreement.
Second repair items
Project content
The performance of the equipment must comply with the specified performance, meet the specifications of technical specifications and data, and submit all applicable, necessary drawings, data and other technical information.
The Contractor shall accept the necessary supervision and inspection of the contractor during his work.
The Contractor shall prepare and submit 2 copies of the draft acceptance manual for the given supplier before September 2002.
The authorized party shall consider and agree to the acceptance manual within the day.
The provisions of this Agreement shall be inconsistent with the provisions of the annex, subject to the provisions of this agreement.
If the inspection manual is inconsistent with the technical specification or the specified data, the technical specification and the specified data shall prevail.
Third repairs
Fourth payments
After receiving the invoice from the contractor, the ordering party must pay the contractor the following time limit:
After the equipment is repaired, the vehicle must be paid 320 thousand yuan once a month after acceptance.
Fifth delivery and acceptance
The Contractor shall complete the repair and commissioning work of the equipment before November 25, 2002, and complete the inspection stipulated in the acceptance manual. At the same time, the Contractor shall sign the equipment acceptance document and prove that the inspection has been completed.
The acceptance documents should be marked with the defects that both parties agree and should be corrected by the Contractor within the agreed time period.
Site acceptance should take place in November 26, 2009.
Sixth changes
Any changes to the main contents or schedules of this contract shall be made in writing from the date of entry into force of the contract. Details shall be made of the effect of the change on the specifications, price, performance, design, acceptance date, replacement performance of the delivered or ready to deliver spare parts, and other important items of this agreement, and shall be signed by both parties.
In order to repair defects or improve equipment, the contractor may make minor changes or corrections to the technical specifications, provided that such changes do not seriously affect the total purchase price, functional characteristics, performance and replacement performance of spare parts.
Seventh guarantees
The contractor will not guarantee that the equipment will not meet the technical specifications due to defects in the material and process of the equipment and design imperfection.
From the date of acceptance of the equipment and parts, if the failure occurs within six months, the Contractor shall be responsible for the replacement or repair within 7 days from the receipt of the notice of the notifying party, and the expenses incurred therefrom shall be borne by the contractor.
If the Contractor fails to fulfill the above warranty, he shall bear all losses arising from the contractor.
Eighth others
This contract is a complete agreement between the parties hereto. All statements, negotiations, letters, commitments, agreements, consultations and contracts made by the previous two parties or their agents concerning any matter or thing that are applicable or involving the contract shall be revoked, whether written or oral.
Contractor party
Specific date
- Related reading
- Receptionist skills | 公務禮儀的要點
- Document management | Filing And Filing Scope Of Documents And Archives
- Document management | 文件材料的收集管理
- business etiquette | Main Points Of Daily Communication Etiquette
- Document management | General Rules For Filing And Filing System Of Documents And Archives
- business etiquette | Etiquette For Foreign Affairs
- Document management | Management Of Audio-Visual Archives
- Document management | 聲像檔案的整理
- Document management | Preservation Of Audio-Visual Archives
- Document management | The Development And Utilization Of Audio-Visual Archives
- Garment Processing Contract
- Garment Processing Contract
- Simple Contract Model
- Language Arts In Communicative Activities
- A Concise Way To Communicate In Foreign Trade
- How To Win In Negotiations
- Office&Nbsp, Lady's Forbidden Area
- Business Introduction Or Greeting Skills
- E-Mail There Should Be Traditional Letter Etiquette.
- Fashion Shorts For This Season's Fashion Trend