• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Adjustment Of Synchronous Belt Of Shoulder Pads

    2010/8/23 14:16:00 17

    Shoulder Pads

    With the increase of use time,

    Machine parts

    Wear is inevitable, especially the synchronous belt skidding, resulting in the machine can not be used normally.

    When the operator changes to the new synchronous belt, but because of the adjustment is not in place, it is easy to cause breakdowns, such as needle jumping, disconnection and no feeding. Therefore, the adjustment of synchronous belt is also the key to ensure the whole operation of shoulder pads.


    The structure of shoulder pads is basically the same as that of the upper sleeves, but there are more cutter mechanisms than the upper sleeves.

    With the increase of use time, machine parts inevitably wear out, especially the synchronous belt skidding, causing the machine to be unable to use normally.

    If the operator changes to the new synchronous belt, but because the adjustment is not in place, it is easy to cause the breakdown of the needle jumping, disconnection and no feeding.


    To solve this problem, the following is a summary of the adjustment operation of the replacement of the synchronous belt of the shoulder pads by taking the 697 of the type of shoulder pad machine as an example for reference by colleagues.


      

    Shoulder pads

    After changing the new synchronous belt, we can first hit the upper axle to the right. After installing the belt pulley, the upper axle must not move about and fix the upper shaft synchronous pulley, install the take-up rod and place it in place, put the needle rack (the needle slider should fall into the slot of the needle rack), then install the pin rack block, the fixing block and the foot guide rail.


    Second, connection.

    Presser foot

    And feed the foot pressing connecting rod, locate the upper shaft needle bar, feed the presser foot up and down movement and the positioning screw on the cutter driving cam, tighten the fastening screws; basically locate the pin cam to connect their respective connecting rods, and install presser foot, machine needle, needle bar cover, head side cover, belt wheel cover, synchronizer and so on.


    After installing the above components, we need to make the following adjustment:


    Adjustment of feeding of 1. needle and pendulum needle


    The correct timing of the machine needle and pin feeding is: when the feed is finished, the tip of the machine just leaves the pinhole of the lower feeding tooth and is in the same plane with the lower feeding tooth.

    Check the time phase of the feeding tooth and the machine needle, unscrewed the 3 screws to drive the cam, and turn the cam to the correct position, so that the needle is located in the center of the lower feeding tooth, then tighten the 3 screws of the driving cam.

    Improper adjustment will lead to faults such as the size of the needle, the tight bottom line and so on.


    Adjustment of cam driven by 2. and lower feeding teeth


    The correct time phase is: the needle descends to the bottom dead point, and the lower feeding tooth reaches the highest point.

    The upper and lower movements of the feed are controlled separately by the respective axes of the upper and lower axes, while the upper shaft has a positioning platform. When removing, the positioning screws must be removed and only the fastening screws are left.

    When adjusting the lower shaft cam, we can adjust the lower shaft synchronous pulley or directly adjust the cam. If the adjustment is not in place, there will be no feeding, bottom line start and so on.


    3. adjustment of feeding presser and presser presser foot.


    The upper and lower movements of the feed presser and the presser presser are controlled by the upper cam with the same cam (the cutter is driven by the cam).

    When the cam is installed, it can identify the positioning platform on the upper shaft. When the two presser work, the upper and lower switches are exchanged. The correct exchange phase is: the needle drops to the lower dead center, and the feed pressure foot also descends to the minimum, and the presser presser foot reaches the highest (the presser presser foot plate bottom is away from the needle plate 5mm).

    Loosening drives the first connecting rod screw on the cam, adjusts the exchange height of the two presser feet. If the adjustment is not in place, there will be failures such as failure of feeding or too small needle.


    Adjustment of 4. machine needle and rotary shuttle


    The correct hook time of the machine needle and the rotary spindle is that when the machine needle picks up, the spindle point is located along the needle thread hole of the machine, along the 1mm, loosening the two screws of the lower fan gear of the rotary spindle to adjust the hook time. (after adjusting the fastening screws of the first connecting rod shaft on the cam, adjusting the two corresponding six angle screws, the needle bar can be adjusted early or late).


    The left and right clearance between the spindle and the needle is 0mm to 0.01mm. The screws of the rotary spindle base are adjusted to adjust the left and right movements of the pendulum frame, and the needle can touch the needle slightly. If the adjustment is not in place, there will be a breakdown such as jumping and breaking.


    In addition, attention should be paid to the wear of the shuttle spindle when adjusting. (the new shuttle point is about 2mm with the supporting line hook). If the wear is serious, the new shuttle should be replaced in time.

    • Related reading

    Yarn Exhibition: Exhibitors And Purchasers &Nbsp; Industrial Chain Linkage

    Supporting resources
    |
    2010/8/23 12:04:00
    27

    Gao Le Company'S Steam Dyeing Machine Is Popular.

    Supporting resources
    |
    2010/8/23 12:00:00
    37

    H&M&Nbsp; Sales Increased In July

    Supporting resources
    |
    2010/8/23 11:59:00
    25

    Never Blindly Develop The Biomass Fiber Industry

    Supporting resources
    |
    2010/8/23 11:56:00
    72

    Wujiang Shengze: The Development Path Of "China'S First Market"

    Supporting resources
    |
    2010/8/23 11:54:00
    56
    Read the next article

    2010年秋冬服裝產品批發價將提升10%-15%

    日前從青島海關了解到,今年以來,由于全球棉花供不應求,進口棉價高企,推動國內棉花價格一路走高,導致品牌服裝的商場零售價格已普遍上漲10%-15%,預計今年秋冬服裝產品批發價還將提升10%-15%。

    主站蜘蛛池模板: 国产精品jizzjizz| 欧美一级免费看| 好吊色欧美一区二区三区四区| 四虎成年永久免费网站| 久久久久久影视| 色天天综合久久久久综合片| 日本三级韩国三级在线观看a级 | 国产v精品成人免费视频400条| 久久综合久久综合九色| 国产在视频线精品视频2021| 曰批全过程免费视频网址| 国产女高清在线看免费观看| 呦交小u女国产秘密入口| 中文字幕乱码人妻一区二区三区| 色噜噜视频影院| 废柴视频网最新fcww78| 免费看国产精品麻豆| aaa日本高清在线播放免费观看| 洗澡被王总干好舒服小说| 国产黄色一级片| 亚洲区小说区激情区图片区| 精品一区二区三区色花堂| 日韩一中文字幕| 四虎a456tncom| www.天天操.com| 精品欧美一区二区3d动漫| 女性成人毛片a级| 亚洲第一香蕉视频| xxxx黑人da| 日本高清成本人视频一区| 国产99久久九九精品无码| 一本加勒比HEZYO无码人妻| 激情五月综合网| 国产精品亚洲一区二区三区在线| 久久综合久久久久| 肌肌对肌肤肤30分钟软件大全免费 | 在线免费你懂的| 日本高清免费不卡在线| 和僧侣的交行之夜樱花| 99热这里只有精品99| 樱桃黄高清完整版在线观看|