&Nbsp In The Era Of Meager Profit; Effective Operation -- China'S Clothing Industry: Entering The Era Of Lean Production
In today's world, production technology is advancing by leaps and bounds, and no progress is being made. Moreover, under the situation of global economic integration, competition is becoming more and more intense. In terms of global economic activities, the market is diversified, personalized and advanced in the market demand.
This kind of market demand in the manufacturing industry shows a variety of small production patterns.
Therefore, the manufacturing industry must change its concept and pform from the original manufacturing industry to the manufacturing service industry.
Therefore, reform is necessary. Only by reform can we survive and develop.
Fu Dongliang, chief consultant of Nan Bo Wan Business Management Consulting Co., Ltd.
A master of business administration, a master of psychology and a senior economist at the Waseda University, Japan.
In the aspects of clothing enterprise strategic management, garment enterprise process management, clothing enterprise brand management, clothing enterprise financial management and other aspects, it has been the chairman of the Hongkong L2 International Clothing Co., Ltd., the chief researcher of the China Brand Strategy Research Institute, the chief consultant of the South Silk Bay enterprise management consulting Co., Ltd., and the senior consultant of the more than 30 famous enterprise special enterprise development strategic planning.
Yes, I did.
Guangdong, Hong Kong and Macao
Some thoughts on the research of clothing industry and "government failure"
Garment foreign trade
Economic analysis, etc., published "breakout clothing brand" and other books.
"In the era of meager profits, for garment enterprises, we must first enhance the added value of brands, and secondly, we should pay attention to process optimization and strengthen management so that enterprises can run more effectively."
Fu Dongliang said.
Single piece production system is effective.
The single piece flow is a production system that can effectively run the garment enterprises in the meager profit era.
According to the introduction, the objective of the single piece production system is to ensure the establishment of a vertical and flexible production line to ensure low cost, efficiency and waste reduction, and improve the quality and service quality.
Fu Dongliang believes that the purpose of the production system is to eliminate all kinds of waste hidden in the enterprise so as to gain more benefits.
Waste includes: waste of waiting, waste of inventory, waste of pportation, waste of action, waste of defective goods, waste of processing, excessive waste of production, and rapid and multifaceted improvement of results.
After checking the samples with the guest, the merchandiser will check the samples.
Order
When the information is distributed to all relevant functional departments, it is the starting point for employees to complete sewing work and focus on the delivery of products to the packaging department.
Fu Dongliang introduced that the main contents of the system consist of mind, technology and body.
Among them, "heart" means that ideology must be established first.
The idea of single piece flow is very different from traditional production concept. Improvement must start with consciousness reform.
"Skill" means the meaning of technique.
It is about what methods to adopt to make ideas and ideas out.
It includes streamlined production, stable production, smooth production and supermarket production.
"Body" means the meaning of experience and practice.
This is the secret of improving the success of the whole piece flow.
Only by doing so can we find out the problems before we can improve them.
Streamlined production is the most important stage.
Streamlined production can be said to be the most important stage of the single piece flow. Its basic idea is to avoid making bad products and produce the finished products one by one through the production process.
There are the following conditions for establishing streamlined production: first, single piece flow, followed by arrangement of equipment in accordance with the sequence of process, production speed synchronization, multi process operation, multi worker operation, staff standing and walking operation, machine equipment miniaturization, parking arrangement U type and so on.
Streamlined production has the following specific requirements: first, the whole staff consciousness reform; the second is to set up an exemplary model group; the third is to select the demonstration production line; fourth, the current situation investigation and analysis, to make an understanding of the current production line; fifth, to set the production distance time according to the style; sixth, to decide the quantity of equipment and personnel; seventh to arrange the production line with "thin flow and fast" and counter clockwise flow; eighth to allocate the process, and ninth to single piece flow.
Finally, we should expand horizontally.
When the demonstration group members are accustomed to the new way of work, and the production line is gradually stabilized, the whole factory has a place to observe and learn. Other production line workers also have a certain understanding of streamlined production. At this time, each production line in the factory can be quoted in accordance with the establishment process of the demonstration group.
Stable production is a real improvement activity.
Streamlined production can only be regarded as an amendment activity. The real improvement activities should start with stabilizing production, including the stability of personnel and other factors.
The stability of personnel is to stabilize the production line by standard operation and to reduce the effect of the workers, while maintaining the stability of personnel and the flow of employees will not be too frequent. The stability of machines is often caused by machine failure and wastes much time in the process of production. Therefore, it is necessary to make the machine stable and operational with a mobility rate of 100%. The stability of quality is the single item pursuit of zero defects, and the implementation quality of "three no" policy (not making defective products, not pmitting defective products, not accepting defective products).
Finally, the stability of management.
The single piece flow should improve the traditional concept, and management is an important factor.
Managers should first understand the concept of consciousness, so as to have the ability to see and discover problems. Secondly, we should make use of auxiliary tools such as electronic billboards, warning lights, bottleneck process lights, etc. to make the production site easy to display problems and production activities to be pparent, so that an abnormal phenomenon on the scene can be detected and improved immediately.
Smooth production, first arrange the list.
How can we do well in smooth production? First of all, the scheduling should be arranged in a single row, so that the style of the production line has a continuity, that is, the changes between the styles will not be too large, and there are similarities, so that employees will not have too many technical problems when they open new models.
Secondly, the skill level of each employee in the production line can reach the level of multi capability and seamless pfer.
Again, the daily output arrangement should have a curve. The first day of the operation is 85%, and the second day is 117%, and it will keep 130% in the second week.
The highest level of smooth production is mixed flow production, that is, the style of cloth and sewing method is similar, even if the size is different, it is arranged on a production line to cross production at different intervals, so that equipment, space and manpower can be used without waste.
Single piece flow is different from traditional production mode.
The main differences between the single piece flow and the traditional production mode include the arrangement of parking spaces, the different direction of production line, the different control modes of cutting pieces, and the related problems of production mode.
First of all, the arrangement of parking spaces is that the single flow requires parking spaces to be arranged in U and counterclockwise direction. During the production process, cross reflux and backflow are strictly prohibited, so that the streamline production of the production line is achieved. In traditional production mode production lines, sometimes the arrangement of parking spaces causes cross reflux between certain processes.
The different direction of production line is the requirement of single piece flow to establish an elastic production line.
According to the quantity of the order and the time of delivery, the styles, daily output and the number of operators are changed at any time. That is to say, the staffing needs to be changed as the demand changes. This requires higher skills for employees, and the need for training multi skilled workers.
The traditional production mode has no such requirements.
The method of controlling the distribution of chips is different from that of a single piece of flow. It is strictly controlled according to the rhythm time and is released by "water spiders", so that the flow is smooth. This is also a condition for streamline production.
In the traditional production mode, the time of the release is usually two hours, so the whole production line is very chaotic. The number of sewing joints between different departments is not consistent, so it is easy to pile up goods.
Single piece flow is standing production, traditional production mode is sitting production.
Many people do not understand why they should stand up and work hard. Why do they have to stand up?
"Standing production makes the upper and lower processes easier to pfer, and is also convenient for process deployment and balancing process.
For example, after you sew, you can go to the middle scalding, which will reduce the waste of time. If you sit and work, you should stand up and burn after sewing, which will be more troublesome.
Fu Dongliang said.
Relevant experts also believe that standing production can save space and facilitate visual management.
The single piece flow calls for U type parking spaces, so that there will be a channel in the middle, which is also convenient for visual management.
Before sitting in production, the parking lot was in disorder. Under the machine, there were many dead ends and chores. It was not easy to find and handle. After standing up, the space was large, and every problem could be found clearly everywhere.
Wage calculation to enhance system integrity
The traditional production mode adopts the personal piecework wage system, and the employees do much more and do little. So they will only do their best to do the work they are responsible for, so that it will easily lead to uneven process, unsmooth flow, stacking goods, poor quality and so on, and more fatal is not easy to find problems. Once the rework occurs, the whole batch will be found.
The piecework wage system implemented in the single line production line is completely different. Each employee is part of a group, and the workload is equal. The money they earn is divided equally. This will strengthen their team spirit, and there will not be any dispute between employees or between employees and QC on the production line.
Naturally, after a long period of time, the production line is more stable and emotional, and this group is more united and productive.
Everyone will have a herd mentality. I will follow what others do. They all want to be valued in the collective.
In traditional production mode production line, employees are individual individuals, lack team spirit, lack team spirit, team spirit, only their own, they will be overseen, they will be overseen, and, they will be overseen, and, they will be overseen, and, they will be overseen, and, they will, and, do not, and, and, do not, and, and, to oversee, the concept of quality is also strengthened.
{page_break}
Group counting requires that each employee has the same skill level, so that the process can be balanced, but in practice, the skill level of the employees is still different. The group pieces will make the skill poor people work harder and keep up with the pace. Therefore, the implementation of group pieces can bring the latter up and improve the skill level. On the traditional production mode, the skill level of the production line is uneven, there is no way to restrain them from improving their skills consciously, and the process is not easy to allocate, so there is often a phenomenon that the flow is not smooth and the goods are stacked up.
The single piece flow emphasizes the overall benefit. The production line must pursue the balance of overall benefits. That is to say, the benefits of each employee are equal, and the benefit imbalance between employees is not allowed. The traditional production mode does not have the requirements in this respect, so the actual calculation is personal benefit, so that the company and employees are not good.
In the aspect of non-standard action completion, the single stream production line is made by "water spider" on time, and the employee can not leave the post without any reason.
In traditional production mode production line, it is usually the batching staff who takes the target production of Kanban for every two hours to put the cutting piece on the cutting table at once. This wastes time and can not control the size of the cutting piece, and it is easy to form a packet flow, and the process is unbalanced and goods are stacked.
In the single piece production line, the "water spider" completes the arrangement, sorting and pruning of the cutting pieces, reducing the non-standard movements of the employees, reducing the workstation rhythm time and improving the efficiency.
The traditional production mode of the production line is usually done by the employees themselves, resulting in too many non standard movements of employees, increasing the workstation's rhythm time, and the efficiency will be reduced.
In the single piece flow, more emphasis is placed on team spirit of employees. Otherwise, it is impossible to implement single piece flow to streamline production.
First of all, let's imagine that the workload is not equal and the staff do not help each other. The whole production line will be in a mess.
Without team spirit, the team is not angry and lifeless.
The implementation of the group piecework system requires higher team spirit. Employees are only a small part of the group, and only when they are put together can they have greater strength.
Secondly, when employees have team consciousness, the deployment process is easier.
Because single piece flow requires single piece flow, it is necessary to deploy the process. If the team spirit of staff is not enough, the deployment process is very difficult, so that the production line will be stacked up, and the relationship between employees will not be harmonious.
Finally, the group piecework wage system is implemented, and the wages of employees are evenly divided. Therefore, team spirit is more important. Everyone should put their heart and soul into it. They should not be too fussy. Less work means less money. They should help others, help others and help themselves, and you need help from others too. Therefore, we should regard the production line as our home and everyone is a member of this family. We should unite and help each other and make progress together.
- Related reading
"Thousand Years Of Extreme Cold" Climate Gimmick Makes Warm Products Sad And Happy.
|- Instant news | Hot Spot: Autumn Clothing Market In Humen, Hot Summer And Autumn Winter Clothes
- Footwear industry dynamics | Responding To The "Low Carbon Economy" Era, &Nbsp; &Nbsp; Shoes And Clothing Enterprises Should Pay Attention To Energy Conservation And Emission Reduction.
- Colorful circles | 美國Oakley推出限量版3D眼鏡
- Industry perspective | Cotton Prices Soared &Nbsp In 2010; 2011 Harm Now.
- Collocation | 針織衫,過時不過氣(二)
- Consumer rights protection | Stores Buy Shoes Out Of Quality Problems &Nbsp; Look For Businesses To Return Rejected.
- neust fashion | Brand SOPHNET And Famous Brand New Eastpak Package
- Attract investment | 2010 Ningbo Textile Enterprises Accelerate Pformation And Upgrading
- Collocation | Knitted Sweater Is Out Of Date. (1)
- Attract investment | 2010 "Keqiao Works" To Attend Shanghai Fashion Week.
- Quanzhou Children'S Shoes Collectively Play "Health Card"
- Min Pai Men'S Clothing Is The Main Brand Of "Eco" Brand In 2011.
- Faye Wong: It'S Simply Overloaded With Fashion.
- The Body Is The Biggest Selling Point -- Big Name Endorsement, "Destiny" Sports Star.
- Clothing Is No Longer "Cheap".
- Hangzhou: Store Costumes, Price Wars, Online Shopping
- Mcglaughlin Was Questioned For Marketing.
- Dongguan Brand Clothing And Apparel December Launched In Hefei
- He Has Accelerated The Expansion Of The Sales Network.
- Treksta Uses High Technology To Build The World'S Top Outdoor Brand