• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Chinese And Foreign Processing And Assembly Contract

    2014/4/5 10:36:00 17

    Incoming ProcessingIncoming AssemblyContract

    Party A is: the company, the company, the company.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Teletype: it is called "the", "the", "the" and "the".


    It is a factory in the world.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Party B is: the company is the company of the company.


    Address: the address is: the first, the second and the third.


    Teletype: it is called "the", "the", "the" and "the".


    This contract is signed in the year of the year of the year.


    The two parties have signed the contract through friendly negotiation in order to carry out the raw material processing (or assembly) business, and in accordance with the principle of equality and mutual benefit.


    The first item of processing (assembly)


    Party B shall provide Party A with raw materials (or parts) needed for processing (or assembling) the pieces of products (or parts) that are required for the processing of the products.


    Second quantity and time of delivery and processing of finished products


      乙方將于_______年_______月_______日至_______年_______月_______日,每月向甲方提供_____________原材料(或散件),并負責運至________港港口(或車站)交付甲方;在甲方收到原材料(或散件)后的_______個月內,(或自__________年_______月_______日至_______年_______月_______日)分批將加工(或裝配)后的成品負責運至_______港口(或車站)交付乙方。


    Party B, when supplying raw materials (or parts), shall provide Party A with the percentage of loss per cent of the gross parts of the product. If Party B fails to deliver all raw materials (or loose parts) on time and according to quality and quantity, Party A will pay compensation if Party A stops working to make material losses. If Party A fails to deliver the finished products on time, according to quality and quantity, Party A shall also be responsible for compensation after Party B's proposal.


    Third processing fees


    Party A shall make processing (or assembling) processing fees for Party B, and each piece (or set) shall be counted as RMB. (Note 1)


    Fourth payment methods


    Party B shall deliver the raw materials (or parts thereof) that are not priced to Party A, and the processing fee shall be paid by Party B to Party A at sight. (note two)


    Fifth factory experts and technical training


    According to the actual needs, Party B has the obligation to dispatch experts to Party A and to train the necessary technical personnel for Party A, the number, time, task and cost burden of the factory experts and trainers.


    Sixth freight, insurance premium.


    Party B is responsible for the transportation of raw materials (or parts) to Party A, and the insurance premium shall be borne by Party B. Party A shall be responsible for transporting the finished products to Party B's freight and insurance premium. The transportation insurance for finished products shall be covered by Party A according to the total cost of the original material (or loose parts) plus freight, insurance premium and processing fee of one hundred and ten percent, and war risk, such as land transportation insurance on land transportation insurance. Party A is responsible for covering fire insurance during processing and assembling. (note three)


    Seventh quality tests


    (1) after receipt of raw materials (or parts), Party A shall check its specifications and quality according to the technical standards provided by Party B. If Party B finds that the specifications and quality of the raw materials (or parts) supplied by Party B are not up to the technical standard or the quantity is insufficient, Party B shall be responsible for the replacement or supplement of the inspection report submitted by Party A to Party B.


    (2) after receiving the finished products processed by Party A, Party B shall inspect the goods according to the agreed standards agreed upon by both parties. If Party A fails to cause quality problems due to improper equipment, Party B shall submit the inspection report to Party A, and Party A shall be responsible for repairing or compensation.


    Eighth force majeure


    Due to war and serious natural disasters and other human irresistible incidents agreed by both parties, when a party fails to fulfill the contract, the party in case of such accidents should inform the other party of the accident as soon as possible and negotiate with the other party to extend the time limit for the execution of the contract. No compensation shall be made for the losses arising from the other party.


    Ninth liability for breach of contract


    Any party who fails to fulfill the terms of the contract and causes the other party to suffer economic losses must bear the liability of compensation, and the injured party shall have the right to impose a fine of yuan.


    The tenth arbitration


    During the execution of the contract, if there is any dispute, the two parties should negotiate in a friendly manner. If the case is not settled, the arbitration agency shall be submitted for arbitration. The arbitral award is final and binding upon both parties. The cost of arbitration shall be borne by the losing party.


    Eleventh article guarantee


    In order to ensure that both parties perform the contract and pay the penalty or compensate for the loss in time, the parties shall provide each other with the letter of guarantee issued by their respective banks.


    Twelfth transfers


    The rights and obligations specified in this contract shall not be transferred to any third party without mutual consent.


    Thirteenth effective period


    This contract shall come into force on the date of signing, and shall be valid until the end of the contract.


    Fourteenth renewal


    book contract Before the expiration of the validity period, if a party considers it necessary to renew the contract, he may propose and negotiate with the other party.


    The fifteenth text


    The contract is in two originals, each holding one copy. A copy of it.


    Sixteenth additions or amendments


    If there are any unsettled matters in this contract, the two parties may make supplementary amendments or amendments.


    Seventeenth applicable laws


    The law of the People's Republic of China is the applicable law of this contract.


    Party A: (seal)


    Delegate: (signed)


    Party B: (seal)


    Delegate: (signed)


    Witness: (signed)


    Lawyer: China law firm


    Note 1: Packing charges Excipients, freight charges, insurance premiums and so on, except for processing fees, shall be specified in separate clauses.


    Note two: Party B supplies raw materials (or loose parts), such as the collection or usance letter of credit (open letter of credit), and the export of the finished product without the letter of credit, and the remittance or collection method may make corresponding changes.


    Note three: both sides of this line are subject to the terms and conditions of CIF (CIF). If the price terms are "FOB" (FOB) or other price terms, the burden of freight and premium shall be changed accordingly.

    • Related reading

    Model Of Insurance Cooperation Agreement

    Contract template
    |
    2014/4/4 22:13:00
    57

    Cooperative Agreement On Cpas Liability Insurance

    Contract template
    |
    2014/4/3 18:07:00
    60

    Five Major Manifestations Of Major Misunderstanding In Contracts

    Contract template
    |
    2014/4/2 22:49:00
    27

    Confidentiality Agreement On Relevant Business And Technical Data For Talks Or Cooperation

    Contract template
    |
    2014/3/30 22:31:00
    10

    Contract For Pfer Of Technical Title (Project)

    Contract template
    |
    2014/3/27 11:07:00
    18
    Read the next article

    Daily Sales Volume = Daily Passenger Flow * Payment Rate * Customer Price

    Through this simple calculation method, we know that as long as we can think of ways to increase the passenger flow rate, the rate of purchase and the three indicators of passenger price, we can directly improve the daily sales performance of the store. Next, we will specifically analyze the impact of department store pformation design on these three indicators, so as to explain the business strategy of fashion department store pformation design.

    主站蜘蛛池模板: 一级做a毛片免费视频| 国产专区在线视频| 国产成人av免费观看| 亚洲乱码一区av春药高潮| 4480新热播影院| 欧美在线观看视频网站| 国产精品高清一区二区三区| 亚洲熟妇色xxxxx欧美老妇| 97久久国产亚洲精品超碰热 | 美女把腿扒开让男人桶爽国产| 日韩av午夜在线观看| 国产免费久久久久久无码| 久久久久久久亚洲AV无码 | 国产真实乱对白精彩久久| 亚洲一级毛片免费看| 国产露出调教91| 日韩a级毛片免费观看| 国产三级在线视频播放线| 丰满白嫩大屁股ass| 精品欧洲男同同志videos| 娇妻借朋友高h繁交h| 人久热欧美在线观看量量| 91亚洲va在线天线va天堂va国产| 欧美性生交活XXXXXDDDD| 国产日产卡一卡二乱码| 久久亚洲精品AB无码播放| 美女黄色一级毛片| 天天摸天天做天天爽水多| 亚洲欧美视频一级| 四虎精品视频在线永久免费观看| 日韩在线看片免费人成视频播放 | а√在线地址最新版| 激性欧美激情在线aa| 国产精品国产三级国产在线观看 | 欧美日韩另类综合| 日本中文字幕网| 再深点灬舒服灬太大了短文d| 99久在线国内在线播放免费观看| 欧美国产在线视频| 国产午夜视频在线观看| 一级毛片试看三分钟|