• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Chinese And Foreign Processing And Assembly Contract

    2014/4/5 10:36:00 17

    Incoming ProcessingIncoming AssemblyContract

    Party A is: the company, the company, the company.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Teletype: it is called "the", "the", "the" and "the".


    It is a factory in the world.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Party B is: the company is the company of the company.


    Address: the address is: the first, the second and the third.


    Teletype: it is called "the", "the", "the" and "the".


    This contract is signed in the year of the year of the year.


    The two parties have signed the contract through friendly negotiation in order to carry out the raw material processing (or assembly) business, and in accordance with the principle of equality and mutual benefit.


    The first item of processing (assembly)


    Party B shall provide Party A with raw materials (or parts) needed for processing (or assembling) the pieces of products (or parts) that are required for the processing of the products.


    Second quantity and time of delivery and processing of finished products


      乙方將于_______年_______月_______日至_______年_______月_______日,每月向甲方提供_____________原材料(或散件),并負責運至________港港口(或車站)交付甲方;在甲方收到原材料(或散件)后的_______個月內,(或自__________年_______月_______日至_______年_______月_______日)分批將加工(或裝配)后的成品負責運至_______港口(或車站)交付乙方。


    Party B, when supplying raw materials (or parts), shall provide Party A with the percentage of loss per cent of the gross parts of the product. If Party B fails to deliver all raw materials (or loose parts) on time and according to quality and quantity, Party A will pay compensation if Party A stops working to make material losses. If Party A fails to deliver the finished products on time, according to quality and quantity, Party A shall also be responsible for compensation after Party B's proposal.


    Third processing fees


    Party A shall make processing (or assembling) processing fees for Party B, and each piece (or set) shall be counted as RMB. (Note 1)


    Fourth payment methods


    Party B shall deliver the raw materials (or parts thereof) that are not priced to Party A, and the processing fee shall be paid by Party B to Party A at sight. (note two)


    Fifth factory experts and technical training


    According to the actual needs, Party B has the obligation to dispatch experts to Party A and to train the necessary technical personnel for Party A, the number, time, task and cost burden of the factory experts and trainers.


    Sixth freight, insurance premium.


    Party B is responsible for the transportation of raw materials (or parts) to Party A, and the insurance premium shall be borne by Party B. Party A shall be responsible for transporting the finished products to Party B's freight and insurance premium. The transportation insurance for finished products shall be covered by Party A according to the total cost of the original material (or loose parts) plus freight, insurance premium and processing fee of one hundred and ten percent, and war risk, such as land transportation insurance on land transportation insurance. Party A is responsible for covering fire insurance during processing and assembling. (note three)


    Seventh quality tests


    (1) after receipt of raw materials (or parts), Party A shall check its specifications and quality according to the technical standards provided by Party B. If Party B finds that the specifications and quality of the raw materials (or parts) supplied by Party B are not up to the technical standard or the quantity is insufficient, Party B shall be responsible for the replacement or supplement of the inspection report submitted by Party A to Party B.


    (2) after receiving the finished products processed by Party A, Party B shall inspect the goods according to the agreed standards agreed upon by both parties. If Party A fails to cause quality problems due to improper equipment, Party B shall submit the inspection report to Party A, and Party A shall be responsible for repairing or compensation.


    Eighth force majeure


    Due to war and serious natural disasters and other human irresistible incidents agreed by both parties, when a party fails to fulfill the contract, the party in case of such accidents should inform the other party of the accident as soon as possible and negotiate with the other party to extend the time limit for the execution of the contract. No compensation shall be made for the losses arising from the other party.


    Ninth liability for breach of contract


    Any party who fails to fulfill the terms of the contract and causes the other party to suffer economic losses must bear the liability of compensation, and the injured party shall have the right to impose a fine of yuan.


    The tenth arbitration


    During the execution of the contract, if there is any dispute, the two parties should negotiate in a friendly manner. If the case is not settled, the arbitration agency shall be submitted for arbitration. The arbitral award is final and binding upon both parties. The cost of arbitration shall be borne by the losing party.


    Eleventh article guarantee


    In order to ensure that both parties perform the contract and pay the penalty or compensate for the loss in time, the parties shall provide each other with the letter of guarantee issued by their respective banks.


    Twelfth transfers


    The rights and obligations specified in this contract shall not be transferred to any third party without mutual consent.


    Thirteenth effective period


    This contract shall come into force on the date of signing, and shall be valid until the end of the contract.


    Fourteenth renewal


    book contract Before the expiration of the validity period, if a party considers it necessary to renew the contract, he may propose and negotiate with the other party.


    The fifteenth text


    The contract is in two originals, each holding one copy. A copy of it.


    Sixteenth additions or amendments


    If there are any unsettled matters in this contract, the two parties may make supplementary amendments or amendments.


    Seventeenth applicable laws


    The law of the People's Republic of China is the applicable law of this contract.


    Party A: (seal)


    Delegate: (signed)


    Party B: (seal)


    Delegate: (signed)


    Witness: (signed)


    Lawyer: China law firm


    Note 1: Packing charges Excipients, freight charges, insurance premiums and so on, except for processing fees, shall be specified in separate clauses.


    Note two: Party B supplies raw materials (or loose parts), such as the collection or usance letter of credit (open letter of credit), and the export of the finished product without the letter of credit, and the remittance or collection method may make corresponding changes.


    Note three: both sides of this line are subject to the terms and conditions of CIF (CIF). If the price terms are "FOB" (FOB) or other price terms, the burden of freight and premium shall be changed accordingly.

    • Related reading

    Model Of Insurance Cooperation Agreement

    Contract template
    |
    2014/4/4 22:13:00
    57

    Cooperative Agreement On Cpas Liability Insurance

    Contract template
    |
    2014/4/3 18:07:00
    60

    Five Major Manifestations Of Major Misunderstanding In Contracts

    Contract template
    |
    2014/4/2 22:49:00
    27

    Confidentiality Agreement On Relevant Business And Technical Data For Talks Or Cooperation

    Contract template
    |
    2014/3/30 22:31:00
    10

    Contract For Pfer Of Technical Title (Project)

    Contract template
    |
    2014/3/27 11:07:00
    18
    Read the next article

    Daily Sales Volume = Daily Passenger Flow * Payment Rate * Customer Price

    Through this simple calculation method, we know that as long as we can think of ways to increase the passenger flow rate, the rate of purchase and the three indicators of passenger price, we can directly improve the daily sales performance of the store. Next, we will specifically analyze the impact of department store pformation design on these three indicators, so as to explain the business strategy of fashion department store pformation design.

    主站蜘蛛池模板: 久久久精品人妻一区亚美研究所| 在线播放亚洲第一字幕| 麻豆高清区在线| 欧美日韩亚洲成色二本道三区 | 久久久久久久亚洲AV无码| 久久伊人色综合| 曰批全过程免费视频免费看| 国产欧美日韩视频在线观看一区二区| 亚洲乱码中文字幕综合| 老司机免费在线| 最近中文字幕在线中文视频| 国产成人综合日韩精品无| 久久精品成人一区二区三区 | 国产麻豆综合视频在线观看| 国语精品高清在线观看| 亚洲精品成a人在线观看| 97色伦图片97综合影院| 欧美精品一区二区精品久久| 国产精品无码翘臀在线观看| 亚洲va欧美va国产综合久久| 91免费国产在线观看| 日本口工全彩无遮拦漫画大| 国产一级一级一级成人毛片| 中文字幕一精品亚洲无线一区| 精品少妇人妻AV一区二区三区| 好男人好影视在线播放| 亚洲色图欧美在线| 500福利视频导航| 最新精品亚洲成a人在线观看| 国产在线视频区| 中国一级黄色片子| 男人j放进女人p全黄午夜视频| 国内精品久久久久久久97牛牛 | 夜鲁鲁鲁夜夜综合视频欧美| 亚洲欧美日韩在线精品2021| 亚洲jizzjizz在线播放久| 欧美重口绿帽video| 国产精品久久久久久亚洲小说| 久久成人国产精品| 精品国产福利第一区二区三区| 国内精品久久久久久久久蜜桃 |