• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Chinese And Foreign Processing And Assembly Contract

    2014/4/5 10:36:00 17

    Incoming ProcessingIncoming AssemblyContract

    Party A is: the company, the company, the company.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Teletype: it is called "the", "the", "the" and "the".


    It is a factory in the world.


    Address: the address is: the first, the second and the third.


    Telegraph registration: it is registered in the following:


    Party B is: the company is the company of the company.


    Address: the address is: the first, the second and the third.


    Teletype: it is called "the", "the", "the" and "the".


    This contract is signed in the year of the year of the year.


    The two parties have signed the contract through friendly negotiation in order to carry out the raw material processing (or assembly) business, and in accordance with the principle of equality and mutual benefit.


    The first item of processing (assembly)


    Party B shall provide Party A with raw materials (or parts) needed for processing (or assembling) the pieces of products (or parts) that are required for the processing of the products.


    Second quantity and time of delivery and processing of finished products


      乙方將于_______年_______月_______日至_______年_______月_______日,每月向甲方提供_____________原材料(或散件),并負(fù)責(zé)運(yùn)至________港港口(或車站)交付甲方;在甲方收到原材料(或散件)后的_______個(gè)月內(nèi),(或自__________年_______月_______日至_______年_______月_______日)分批將加工(或裝配)后的成品負(fù)責(zé)運(yùn)至_______港口(或車站)交付乙方。


    Party B, when supplying raw materials (or parts), shall provide Party A with the percentage of loss per cent of the gross parts of the product. If Party B fails to deliver all raw materials (or loose parts) on time and according to quality and quantity, Party A will pay compensation if Party A stops working to make material losses. If Party A fails to deliver the finished products on time, according to quality and quantity, Party A shall also be responsible for compensation after Party B's proposal.


    Third processing fees


    Party A shall make processing (or assembling) processing fees for Party B, and each piece (or set) shall be counted as RMB. (Note 1)


    Fourth payment methods


    Party B shall deliver the raw materials (or parts thereof) that are not priced to Party A, and the processing fee shall be paid by Party B to Party A at sight. (note two)


    Fifth factory experts and technical training


    According to the actual needs, Party B has the obligation to dispatch experts to Party A and to train the necessary technical personnel for Party A, the number, time, task and cost burden of the factory experts and trainers.


    Sixth freight, insurance premium.


    Party B is responsible for the transportation of raw materials (or parts) to Party A, and the insurance premium shall be borne by Party B. Party A shall be responsible for transporting the finished products to Party B's freight and insurance premium. The transportation insurance for finished products shall be covered by Party A according to the total cost of the original material (or loose parts) plus freight, insurance premium and processing fee of one hundred and ten percent, and war risk, such as land transportation insurance on land transportation insurance. Party A is responsible for covering fire insurance during processing and assembling. (note three)


    Seventh quality tests


    (1) after receipt of raw materials (or parts), Party A shall check its specifications and quality according to the technical standards provided by Party B. If Party B finds that the specifications and quality of the raw materials (or parts) supplied by Party B are not up to the technical standard or the quantity is insufficient, Party B shall be responsible for the replacement or supplement of the inspection report submitted by Party A to Party B.


    (2) after receiving the finished products processed by Party A, Party B shall inspect the goods according to the agreed standards agreed upon by both parties. If Party A fails to cause quality problems due to improper equipment, Party B shall submit the inspection report to Party A, and Party A shall be responsible for repairing or compensation.


    Eighth force majeure


    Due to war and serious natural disasters and other human irresistible incidents agreed by both parties, when a party fails to fulfill the contract, the party in case of such accidents should inform the other party of the accident as soon as possible and negotiate with the other party to extend the time limit for the execution of the contract. No compensation shall be made for the losses arising from the other party.


    Ninth liability for breach of contract


    Any party who fails to fulfill the terms of the contract and causes the other party to suffer economic losses must bear the liability of compensation, and the injured party shall have the right to impose a fine of yuan.


    The tenth arbitration


    During the execution of the contract, if there is any dispute, the two parties should negotiate in a friendly manner. If the case is not settled, the arbitration agency shall be submitted for arbitration. The arbitral award is final and binding upon both parties. The cost of arbitration shall be borne by the losing party.


    Eleventh article guarantee


    In order to ensure that both parties perform the contract and pay the penalty or compensate for the loss in time, the parties shall provide each other with the letter of guarantee issued by their respective banks.


    Twelfth transfers


    The rights and obligations specified in this contract shall not be transferred to any third party without mutual consent.


    Thirteenth effective period


    This contract shall come into force on the date of signing, and shall be valid until the end of the contract.


    Fourteenth renewal


    book contract Before the expiration of the validity period, if a party considers it necessary to renew the contract, he may propose and negotiate with the other party.


    The fifteenth text


    The contract is in two originals, each holding one copy. A copy of it.


    Sixteenth additions or amendments


    If there are any unsettled matters in this contract, the two parties may make supplementary amendments or amendments.


    Seventeenth applicable laws


    The law of the People's Republic of China is the applicable law of this contract.


    Party A: (seal)


    Delegate: (signed)


    Party B: (seal)


    Delegate: (signed)


    Witness: (signed)


    Lawyer: China law firm


    Note 1: Packing charges Excipients, freight charges, insurance premiums and so on, except for processing fees, shall be specified in separate clauses.


    Note two: Party B supplies raw materials (or loose parts), such as the collection or usance letter of credit (open letter of credit), and the export of the finished product without the letter of credit, and the remittance or collection method may make corresponding changes.


    Note three: both sides of this line are subject to the terms and conditions of CIF (CIF). If the price terms are "FOB" (FOB) or other price terms, the burden of freight and premium shall be changed accordingly.

    • Related reading

    Model Of Insurance Cooperation Agreement

    Contract template
    |
    2014/4/4 22:13:00
    57

    Cooperative Agreement On Cpas Liability Insurance

    Contract template
    |
    2014/4/3 18:07:00
    60

    Five Major Manifestations Of Major Misunderstanding In Contracts

    Contract template
    |
    2014/4/2 22:49:00
    27

    Confidentiality Agreement On Relevant Business And Technical Data For Talks Or Cooperation

    Contract template
    |
    2014/3/30 22:31:00
    10

    Contract For Pfer Of Technical Title (Project)

    Contract template
    |
    2014/3/27 11:07:00
    18
    Read the next article

    Daily Sales Volume = Daily Passenger Flow * Payment Rate * Customer Price

    Through this simple calculation method, we know that as long as we can think of ways to increase the passenger flow rate, the rate of purchase and the three indicators of passenger price, we can directly improve the daily sales performance of the store. Next, we will specifically analyze the impact of department store pformation design on these three indicators, so as to explain the business strategy of fashion department store pformation design.

    主站蜘蛛池模板: 伊人成影院九九| 四虎影院wwww| 一级毛片在线免费播放| 武林高贵肥臀胖乳美妇| 国产大学生粉嫩无套流白浆| 一区二区三区欧美视频| 欧美三级在线播放| 大黑人交xxxx| 久久精品久噜噜噜久久| 男女生差差差很痛的app| 国产日韩成人内射视频| 一卡二卡三卡在线观看| 朋友把我玩成喷泉状| 制服丝袜日韩欧美| 久久久精品久久久久三级| 富二代官网下载在线| 五十路在线观看| 男人桶女人视频30分钟看看吧| 国产日韩欧美不卡在线二区| kk4kk免费视频毛片| 日韩专区亚洲精品欧美专区| 人文艺术欣赏ppt404| 青青青青久在线观看视频| 在线观看片免费人成视频播放| 久久亚洲av无码精品色午夜| 波多野结衣动态图| 国产swag剧情在线观看| 夜夜未满18勿进的爽影院| 少妇高潮无套内谢麻豆传| 九色视频最新网址| 波多野结衣中文一区| 国产AV寂寞骚妇| 亚洲jizzjizz在线播放久| 天天操综合视频| 久久久99视频| 欧美中文在线观看| 亚洲酒色1314狠狠做| 美国十次啦大导航| 国产成人免费午夜在线观看| 97在线观看中心| 巨大挺进湿润黑人粗大视频|