Akesu Textile Industrial City (Development Zone) Sewage Treatment Project Construction And Entrusted Operation General Contract, Construction Supervision Tender Notice
< p > Akesu textile industrial city (Development Zone) sewage treatment project < /p >
< p > construction and commissioning of general contracting, construction supervision tender notice < /p >.
< p > 1, bidding conditions < /p >
< p > the sewage treatment project of Akesu textile industrial city (Development Zone) has been approved by the new development ring [2014] 1113. The tenders are the planning and Construction Bureau of Akesu textile industrial city (Development Zone) and the Akesu Textile City Development Co., Ltd., and the construction funds are central budget funds and autonomous regional matching. The project has already had the bidding conditions, and the public bidding for the project construction and entrusted operation general contract and construction supervision is being carried out. < /p >
< p > 2, project outline and tender scope < /p >
< p > 2.1 project outline < /p >
< p > the project is located at < a href= "http://www.91se91.com/news/index_p.asp" > Akesu < /a > the south side of the textile industrial city south, 300 meters south of the outer ring road, and 13.5 kilometers of atalu road. The sewage treatment project mainly consists of printing and dyeing textile industry sewage, and the sewage discharge scale is 50 thousand cubic meters / day. The sewage treatment adopts the technology of "physicochemical precipitation + hydrolysis acidification + biological treatment + coagulation sedimentation filtration + ozone contact oxidation" process, after treatment, the water quality reaches the B standard of "sewage discharge standard for sewage disposal plant" (GB18918-2002). < /p >
< p > main contents of the project: the newly built scale is 50 thousand cubic meters / day sewage treatment plant 1, including printing and dyeing wastewater pretreatment room, grille, adjustment pool, coagulating sedimentation tank, hydrolysis acidification pond, filter cloth filter, ozone oxidation tank, advanced catalytic oxidation pond, two sedimentation tank, aeration filter, sludge dewatering room, contact disinfection pond, etc. the sewage plant auxiliary building and mechanical and electrical equipment installation; 2 new building accident pool (total volume of 60 thousand cubic meters); 12.7 km of newly built water pipeline; 56.17 km of new tail water pipeline. < /p >
< p > project duration is 487 days. The planned commencement date is September 1, 2014. The planned completion date is December 30, 2015 < /p >
< p > commissioned years of operation: ten years after the project was put into use. < /p >
< p > 2.2 bidding scope < /p >
< p > 2.2.1 tendering for sewage treatment project construction and entrusted operation general contract. The bid winning enterprise is responsible for the construction of the project (all the contents included in the bill of quantities), equipment commissioning, completion acceptance and trial operation. After acceptance, it is responsible for the operation and maintenance of the project and will be handed over to the project owner after the expiration. < /p >
< p > 2.2.2 for construction supervision and bidding for contents contained in construction drawings and bill of quantities. < /p >
< p > 3, bidders qualification requirements < /p >
< p > 3.1 bidders qualification requirements for construction and general contracting operations: < /p >
< p > 3.1.1 the tender enterprise must be a legal person registered in People's Republic of China within its capacity to bear civil liability independently. It has good corporate reputation and strong financing ability. It must provide 30 million yuan in good faith margin; < /p >
< p > 3.1.2 has the qualification of two level or above of municipal public works construction contract issued by the administrative department, and the qualification of a professional contractor of environmental protection engineering, and has the first class qualification of general contracting of mechanical and electrical installation works; < /p >
< p > 3.1.3 has effective safety production license; < /p >
< p > 3.1.4 has the qualification of operation of environmental pollution control facilities (industrial waste water) issued by the environmental protection administrative department; < /p >
< p > 3.1.5 project manager shall have the registered architect's qualification certificate for the municipal public utilities or above, or the qualification of construction engineer of the mechanical and electrical engineering registration level; < /p > two.
< p > 3.2 bidders qualification requirements for construction supervision: < /p >
< p > 3.2.1 the tender company must be a legal person with independent civil liability, and has good corporate reputation; < /p >
< p > 3.2.2 has class a qualification for construction supervision of municipal public works; < /p >
< p > 3.2.3 shall be registered as a supervision engineer qualification certificate for municipal utility engineering. < /p >
< p > 3.3 the bidding enterprises of other provinces shall handle the the Xinjiang Uygur Autonomous Region entry archives; < /p >
< p > 3.4. The tender does not accept the consortium bidding; < /p >
< p > 3.5 this tender project will be subject to qualification examination: qualification after trial. < /p >
< p > 4, bid evaluation method and bid opening place < /p >
< p > 4.1 the general score method is adopted for the construction and general contracting of tendering and bidding; < /p >
< p > 4.2 the comprehensive evaluation method is adopted for bidding evaluation of construction supervision; < /p >
< p > 4.2 the opening place of the project: four floor of bidding Center, Akesu, < /p >
< p > 5, the information to be submitted for tender application is < /p >.
< p > 5.1 construction and general contracting of tendering and bidding shall submit the following information: the legal representative's identity certificate, the authorized representative of the legal representative, the identity card of the principal, the business license (duplicate), the qualification certificate (duplicate), the safety production permit, the operation qualification certificate of the environmental pollution treatment facilities (industrial waste water), and the qualification certificate of the construction engineer to be sent to the project. < /p >
< p > 5.2 the following documents shall be submitted for the bidding application of construction supervision: the identity certificate of the legal representative, the letter of attorney of the legal representative, the identity card of the principal, the business license (duplicate), the qualification certificate (duplicate), and the registered engineer qualification certificate of the chief engineer who intends to send the project. < /p >
< p > 5.3 above, check the original copy with the official seal. < /p >
< p > 6, the time and place for bidding and purchase of bidding documents < /p >
< p > for those who wish to participate in the tendering, please apply from August 6, 2014 to August 10, 2014, from 10:00 a.m. to 13:00 p.m., from noon to hour (Beijing time) at Xinjiang Tendering Co., Ltd. and purchase the tender documents. < /p >
< p > 7, announcement announcement medium < /p >
< p > name of tenderee: Akesu textile industrial city (Development Zone) planning and Construction Bureau < /p >
< p > Akesu < a href= "http://www.91se91.com/news/index_c.asp" > textile city < /a > Development Co., Ltd. < /p >
< p > address: No. 6 Shanghai Road, Akesu textile industrial city (Development Zone) < /p >
< p > bidding agency: Xinjiang Tendering Co., Ltd. < /p >
< p > < /p >.
- Related reading
Zhuji City Administration Law Enforcement Bureau Clothing Procurement Project
|- 24-hour non-stop broadcasting | Sun Huaibin: Economic Analysis And Future Trend Of Textile And Garment Industry
- Fashion frontier | The Coming Of The "Crossing" Era
- Live video | 2012 Fashion Street 01
- News Republic | Warm Clothing Is Sold By High Tech &Nbsp; "Insulation Rate" Is Not In The Label Range.
- Live video | 2012 Fashion Street 02
- Web page | Wu Kesong: Marketing Director Of Shenzhen Dibei Beibei Garments Co., Ltd.
- Fashion frontier | Yue Sun's Comeback Is The Mainland Version Lady&Nbsp, Gaga.
- Shoe Express | BELLE Shoes Brand Network Channel Operation Has Characteristics.
- Local hotspot | Quanzhou Sports Brand Expands New Market, Space Spanformation Tide Fashion
- Instant news | Three Large Export Provinces, Sharply Reducing Foreign Trade Growth
- 上海市質(zhì)監(jiān)局發(fā)布皮涼鞋質(zhì)量安全風(fēng)險預(yù)警
- How To Choose Suitable Riding Helmet
- 如何選購適合騎行安全帽
- Smart Positioning Shoes To Solve The Safety Problems Of Children'S Market
- O2O Is Not A Panacea. Self Employment Of Department Stores Will Face Enormous Inventory Pressure.
- Integrating Greater China Business, Cave Shoes Crocs Asia Growth
- Bojun Software Is Invited To Participate In Beijing 2014 Clothing Retail Survival Strategy
- Hebei'S Clothing Wholesale Platform Brings Industry Into The New Mobile Era.
- Pengzhou Makes Efforts To Build Textile And Garment Industry Base
- 國內(nèi)紡服行業(yè)效益低主因:經(jīng)濟低迷和行業(yè)轉(zhuǎn)型