• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Supply Contract (Equipment And Instrument)

    2015/1/11 13:49:00 11

    SupplyContractEquipment And Instrument

    The demand side (Party A):

    The supplier (Party B): the company is a member of the company.

    1. type and quantity of equipment

    Party A will buy Party A, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, etc by Party B.

    2. contract price

    2.1 the total contract price of the contract is RMB, HK $, HK $, HK $, RMB, capital (RMB).

    2.2 the total price of the contract is delivered in Guangzhou, excluding pportation and packing charges.

    3. payment and settlement methods

    3.1 during the day of signing the contract, Party A shall pay the gross sum of the contract amount of the gross sum of the contract, which is% of the total amount of the contract, that is, the amount of the gross amount of the contract.

    3.2 after the signing of this contract, Party A will pay the gross sum of the contract amount of the gross sum of the contract (%), that is, the amount of the gross amount of the contract, which is to be paid by wire pfer to Party B as settlement and delivery.

    3.2 Party B issues settlement with Party A.

    4. equipment lead time

    Party B shall issue the goods referred to in this contract at the place where Party B is located within two days after receipt of the full amount of Party A.

    5. equipment delivery

    5.1 place of delivery: the pportation mode and freight charges shall be borne by Party A.

    5.2 Party A shall delay the delivery date stipulated in the contract, and inform Party B in written form before the date of delivery, otherwise, Party B shall have the right to require Party A to pay for the delay, freight and so on.

    6. receipt of equipment

    6.1 after the arrival of the equipment, Party A inspected and signed the equipment.

    Party A shall send back to Party B by postal courier. If Party A fails to return the "receipt" within one week after the arrival of the goods, it shall be deemed to have received the qualified processing.

    6.2 if Party A finds that the specifications or quantities of the equipment are not in conformity with each other, Party B is responsible for replacement or supplement, and therefore Party A shall bear the corresponding delay.

    Liability for breach of contract

    7. installation, commissioning and guidance of equipment.

    7.1 Party B shall provide free drawings and technical information for the installation and commissioning of the equipment and provide gratuitous guidance services. If the technical difficulties are encountered during commissioning of Party A, Party B can send engineers to Party A's construction site for guidance under the requirements.

    7.2 Party B engineer's on-site guidance time will not exceed the time limit of the time limit, but Party B will no longer charge other service charges.

    8.

    After-sale service

    8.1 Party B shall be responsible for one year's free warranty (except for man-made and force majeure factors causing damage to equipment) after receipt of equipment from Party A.

    8.2 during the free warranty period, all parts of the machine damaged naturally shall be sent back to Party B by mail and repaired and replaced free of charge.

    If there are serious problems and can not be solved by telephone, fax or mail, Party B shall send engineers to Party A to inspect the instructions, and the expenses incurred shall be borne by Party B.

    9. liability for breach of contract

    9.1 if Party B fails to deliver the goods without proper reasons, Party B will pay liquidated damages to Party A every day on the basis of the total amount of the contract.

    9.2 if Party A fails to pay within the stipulated time, it shall pay liquidated damages to Party B on the basis of the total amount of the contract per day.

    9.3 because party a refuses to accept the goods without any reason, the loss caused to Party B shall be borne by Party A.

    Ten

    Force majeure

    Due to force majeure, the contract can not be fulfilled or cannot be fulfilled according to the agreed conditions. The party affected by the force majeure condition shall notify the other party in writing as soon as possible. The two parties can negotiate to solve the exemption or partial exemption from fulfilling the responsibility of this contract, postpone the performance of this contract or terminate this contract, and the two parties may also renegotiate the performance measures.

    11. dispute resolution

    Disputes arising from the execution of this contract shall be settled through friendly negotiation. If the negotiations fail, the parties may bring a lawsuit to the people's court where Party B is located.

    12. the entry into force of the contract

    12.1 the contract will become effective after signature and seal by fax of both parties, and the original document will be exchanged by postal express.

    12.2 there are two copies of the contract, each with a total of one, two, two, two, one and two.

    13. other matters.

    Other unsettled matters shall be settled through friendly negotiation between the two parties.

    Party a unit: the first party, the company is:

    Party B's unit: it is a company of the following:

    Party A's representative: Mr.

    The address of the unit is:

    Tel: telephone, telephone, telephone, telephone, telephone, etc.

    The date of signing: the first, the second and the third.

    Party B's unit: it is a company of the following:

    Party B's representative: Mr., the

    The address of the unit is:

    Tel: telephone, telephone, telephone, telephone, telephone, etc.

    The date of signing: the first, the second and the third.


    • Related reading

    How To Draw Up Contract For Purchase And Sale Of Equipment

    Contract template
    |
    2015/1/10 22:05:00
    35

    Development Of A Mechanical Trial Sale Contract

    Contract template
    |
    2015/1/9 22:08:00
    16

    How To Draw Up The Contract For The Sale Of Equipment

    Contract template
    |
    2015/1/8 18:33:00
    20

    How To Draw Up The Contract Of Carriage Of Goods?

    Contract template
    |
    2015/1/8 18:10:00
    12

    Beijing Commodity Consignment Contract (Business Super Stock)

    Contract template
    |
    2015/1/7 17:02:00
    11
    Read the next article

    Key Issues In Financial Analysis Report

    The financial analysis report must be closely integrated with the company's business operation, deeply understand the business background behind the financial data, and reveal the problems existing in the business process.

    主站蜘蛛池模板: 国产成人精品怡红院| 97精品国产一区二区三区| 欧美日韩精品一区二区三区高清视频 | 天天拍拍夜夜出水| 亚洲人av高清无码| 美女脱了内裤打开腿让人桶网站o 美女脱了内裤打开腿让你桶爽 | 久久精品国产久精国产| 精品久久久久久无码中文野结衣| 国产精品入口麻豆高清在线| 中文字日本乱码| 欧美日韩视频精品一区二区| 国产乱子伦在线观看不卡| 99久久99久久精品国产片果冻 | 亚洲情xo亚洲色xo无码| 能看毛片的网站| 国产精品免费精品自在线观看| 中文字幕一精品亚洲无线一区| 欧美成人看片一区二区三区| 四虎影视永久地址四虎影视永久地址www成人 | 一区二区三区电影在线观看| 最近中文字幕mv手机免费高清| 免费人妻无码不卡中文字幕18禁| 黄网站免费在线| 大胸妈妈的朋友| 久久99精品久久久久久水蜜桃 | 一男n女高h后宫| 最近新免费韩国视频资源| 你懂的在线视频| 青青在线国产视频| 国产精品第13页| 一级毛片免费视频网站| 最好看的中文字幕视频2018| 人妻aⅴ无码一区二区三区| 边吃奶边摸下我好爽免费视频| 国产色无码精品视频国产| 两个人一上一下剧烈运动| 最新免费jlzzjlzz在线播放| 亚洲视频在线观看网站| 美女被免费网站在线视频免费| 国产欧美精品区一区二区三区 | 亚洲精品第一国产综合野|