• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    How To Draw Up A Contract For The Sale Of Equipment Is Best.

    2015/1/15 22:01:00 16

    EquipmentSale And PurchaseContract

    The company (hereinafter referred to as the buyer)

    The company (hereinafter referred to as the seller) has, through friendly negotiation, made the following clauses:

    The first definition

    The "acceptance manual" refers to a document provided by the seller and confirmed by both parties for the inspection equipment to meet the technical specifications and the specified data standards.

    "Specified data" refers to the drawings, data and other information necessary for the implementation of this agreement related to this system.

    "Defects or defects" refers to the equipment (structure or performance) that does not meet the relevant requirements of the acceptance manual.

    "Spot acceptance" means the final acceptance of the equipment installed by the seller in accordance with the acceptance manual.

    "Technical specification" means schedule A of this agreement.

    Second sales subjects

    The seller is willing to sell and the buyer is willing to purchase the following equipment:

    Equipment technical requirements

    The performance of the equipment must comply with the specified performance, meet the specifications of technical specifications and data, and submit all applicable, necessary drawings, data and other technical information.

    The Seller shall prepare and submit to the buyer 2 copies of the draft acceptance manual before September 2002.

    The buyer will consider and approve the acceptance manual within days.

    The provisions of this Agreement shall be inconsistent with the provisions of the annex, subject to the provisions of this agreement.

    If the inspection manual is inconsistent with the technical specification or the specified data, the technical specification and the specified data shall prevail.

    Third prices

    ...

    Fourth payments

    After receiving the invoice from the seller, the buyer must pay the seller the following time limit:

    4.1 after signing the contract, the deposit will be paid 30% of the total price.

    4.2 the buyer will pay 60% of the total price after delivery of the equipment and installation and commissioning.

    4.3 the sum of the total retained price is 10%.

    equipment

    Payment within twelfth months after commissioning.

    Fifth delivery and

    Check before acceptance

    The Seller shall complete the installation and commissioning of the equipment before November 25, 2002 and complete the inspection stipulated in the acceptance manual; at the same time, the seller must sign the equipment acceptance certificate to prove that the inspection has been completed.

    The acceptance documents should be marked with the defects that both parties agree and should be corrected by the seller within the time agreed between the parties.

    Site acceptance should take place in November 26, 2002.

    Sixth article

    change

    Any changes to the main contents or schedules of this contract shall be made in writing from the date of entry into force of the contract. Details shall be made about the effect of the change on the specifications, price, performance, design, acceptance date, replacement performance of the delivered or ready to deliver spare parts, and other important items of this contract, and shall be signed by both parties.

    In order to repair defects or improve equipment, the seller can make minor changes or corrections to the technical specifications, provided that such changes do not seriously affect the total purchase price, functional characteristics, performance and replacement performance of spare parts.

    Seventh guarantees

    The Seller guarantees that the equipment will not meet the technical specifications due to defects in the equipment and materials, as well as imperfect design.

    If the equipment and parts fail from the date of acceptance, if the seller fails within 1 years, the Seller shall be responsible for the replacement or repair within 7 days after receiving the notice of the new company, and the expenses incurred therefrom shall be borne by the seller.

    If the seller fails to fulfil the above warranty, he shall bear all losses caused by the buyer.

    Eighth others

    This contract is a complete agreement between the parties hereto. All statements, negotiations, letters, commitments, agreements, consultations and contracts made by the parties or their agents before the agreement are applicable to or in connection with any matter or thing involved in the agreement, whether written or oral.

    Seller

    Buyer


    • Related reading

    How To Draw Up Contracts For International Sale And Purchase

    Contract template
    |
    2015/1/15 21:51:00
    10

    How To Formulate The Agreement On The Pfer Of Intellectual Property Rights

    Contract template
    |
    2015/1/14 20:00:00
    53

    Letter Of Credit And Equity Bearing Contract

    Contract template
    |
    2015/1/14 19:46:00
    5

    How To Draw Up The Agreement For Capital Raising

    Contract template
    |
    2015/1/13 21:54:00
    158

    How To Draw Up Futures Commission Agreement

    Contract template
    |
    2015/1/13 21:46:00
    6
    Read the next article

    Moderately Debt Management And Creating Financial Leverage Effect

    In addition to the advantages of Taxation, enterprises can also reduce their agent costs. Because in the environment of corporate debt management, management will always face the pressure of repayment, which may virtually reduce the abuse of residual cash by management, thereby inhibiting blind investment behavior.

    主站蜘蛛池模板: 自慰系列无码专区| 日韩精品无码一区二区三区| 1000部啪啪未满十八勿入免费| 2021最新热播欧美极品| 91影院在线观看| 精品视频一区二区三三区四区 | 色婷五月综激情亚洲综合| 精品国产乱码一区二区三区麻豆| 激情小说亚洲图片| 极品丝袜老师h系列全文阅读| 扁豆传媒视频免费观看| 在厨房里被挺进在线观看| 国产成人亚洲精品无码青青草原 | 黄色网在线播放| 精品国产乱码久久久久久郑州公司| 欧美精品99久久久久久人| 日本特黄特黄刺激大片| 夜夜爽免费888视频| 国产成人午夜福利在线观看视频| 全彩无修本子里番acg| 亚洲人成人77777网站| 一级网站在线观看| 成人毛片免费看| 娇小xxxxx性开放| 国产精品99久久久久久www| 四虎影视www| 亚洲国产精品一区二区三区久久| 亚洲国产成人va在线观看| 中文字幕电影在线观看| 49289.com| 精品国偷自产在线视频| 中文字幕免费人成乱码中国| 久久国产精品久久| 中文字幕一区在线播放| 37大但人文艺术a级| 精品水蜜桃久久久久久久| 欧美巨大bbbb| 好男人在线神马影视www在线观看| 国产成人影院在线观看| 亚洲精品午夜国产va久久成人| 久久99久久精品视频|