• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Project Loan Contract

    2010/10/18 9:18:00 51

    Project Loan Contract

    Project loan contract


    Contract No.:


    The lender:


    The borrower: the company is in charge.


    The two sides jointly abide by the "loan contract regulations" issued by the State Council and sign the contract.


    Article 1 approves the project of the borrower (item name and main content) according to the project approval authority and the official number. The total investment is RMB 10 million yuan, of which the self raised amount is RMB 10000 yuan, other yuan is 10000 yuan, the loan unit is applied for (loan type), the loan is ten thousand yuan.


    The second borrowers agree to borrow ten thousand yuan according to the borrower's loan below.

    The term of the loan is: from year to month, from month to month.

    The borrower shall pay interest rates according to the interest rates stipulated in various loan methods and collect interest from the borrowers.

    The purpose of borrowing is to purchase equipment, such as yuan, Tai, Tai, and Wan Yuan.


    The third party guarantees that within the approved loan amount, the fund will be provided in time according to the time limit stipulated in the loan contract. If it fails to provide loans on time due to its responsibility, it should pay the borrower a penalty for breach of contract and the number of days delayed.

    The liquidated damages shall be paid by the lender according to the loan interest rate of this loan.


    The fourth borrowers ensure that the principal is returned as follows:


    Every year, the moon is ten thousand yuan.


    Every year, the moon is ten thousand yuan.


    In the year of the year, the moon is ten thousand yuan.


    The fifth borrowers repay their principal and interest. The two sides agree to pay the following funds according to the relevant regulations:


    The official seal (official seal)


    1. after the loan project is put into operation, the newly increased pre tax profit will be $10000.


    2. after the loan project is put into operation, the new tax increase will be $10000.


    3. its own funds (including renovation and upgrading funds, trial production fees for new products and production development fund)


    4. the depreciation of new fixed assets is $10000.


    5. the cost of the loan project to the competent department is $10000.


    6. other funds are $10000.


    The sixth lending parties shall have the right to supervise the borrowers in accordance with the approved project implementation plans, design plans and contractual provisions.

    Loan

    Without the consent of the lender, the borrower shall not change the content of the project and the purpose of borrowing at will. Otherwise, the lender shall have the right to withdraw or stop the loan, and add part of the interest to the misappropriated part of the loan.


    Seventh, if the borrower fails to repay the loan on time, the guarantor or the guarantor unit shall bear the responsibility to repay the principal and interest.


    The eighth contract is effective after signing the contract by the borrower, the lender and the guarantor, and terminates after the repayment of the principal and interest of the loan.

    The original contract is three copies: the borrower, the lender and the guarantor each have one copy; four copies are submitted to the people's Bank of China one or two.

    branch

    The local administration for Industry and Commerce and the Inland Revenue Department.


    Borrower: (unit)


    Legal representative: (duty, name)


    Lender: (unit)


    Legal representative: (duty, name)


    Guarantor: (unit)


    Sign

    date

    In the first place,


    Place of signature:

    • Related reading

    General Proxy Agreement

    Contract template
    |
    2010/10/16 9:44:00
    63

    Facade Leasing Contract Template

    Contract template
    |
    2010/10/15 14:05:00
    130

    Translation Contract Template

    Contract template
    |
    2010/10/14 13:18:00
    137

    Sign The Concession Contract Four

    Contract template
    |
    2010/10/5 17:34:00
    76

    Outsourcing Processing Agreement Sample

    Contract template
    |
    2010/10/4 17:48:00
    523
    Read the next article

    Fighting Against The Workplace

    We all know Miss Hu in our department loves to tell the truth. Miss Liu, who was campaigning with her manager for a few days, did not come to work for a few days. She told her boss that Miss Liu had been gambling for several days, so she could not come to work.

    主站蜘蛛池模板: 欧美成人精品第一区二区三区 | 爱情岛论坛亚洲高品质| 老司机免费午夜精品视频| 日韩中文字幕在线视频| 国产在线视频不卡| 久久综合九色综合网站| 国产福利在线观看你懂的| 晓青老师的丝袜系列| 国产成人 亚洲欧洲| 久久人人爽人人爽av片| 色老头成人免费综合视频| 手机在线看片国产日韩生活片| 国产乱子伦一区二区三区| 中文精品久久久久国产网址| 肥臀熟女一区二区三区| 恸哭の女教师大桥未久| 免费国产怡红院在线观看| 99爱在线视频| 欧美巨大黑人hd| 国产无遮挡吃胸膜奶免费看视频| 久久精品麻豆日日躁夜夜躁| 韩国理论片中文字幕版电影| 无码不卡av东京热毛片| 全彩acg★无翼乌火影忍者| a级成人免费毛片完整版| 欧美高清在线精品一区| 国产精品久久久久久久久久免费 | 黑人巨大sv张丽在线播放| 日本人成动漫网站在线观看| 向日葵app下载网址进入在线看免费网址大全 | AV无码小缝喷白浆在线观看| 欧美日韩高清在线观看| 国产片免费福利片永久 | 91老湿机福利免费体验| 李丽莎1分37钞视频最大尺度| 国产在线精品一区二区不卡| 中文字幕在第10页线观看| 狠狠色综合网站久久久久久久| 国产色a在线观看| 久久精品一区二区东京热| 精精国产www视频在线观看免费|