• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    The Gansu Section Of Jingxin Expressway Opened &Nbsp, And The Eastern Economy Opened Up A Shortcut To Xikou.

    2011/3/29 13:34:00 49

    High Speed Gansu Economy

    Reporter 28 days from

    Xinjiang

    Authorities have learned that the new Gansu expressway, known as the "convenient northwestern corridor", has started all over the Hami line from Ming Shui to Hami.

    It is reported that the total investment amount of the project is 3 billion 600 million yuan, with a total length of 178 kilometers, and is expected to be opened to traffic in 2013.

    With this high-speed construction, the mileage of Beijing to Urumqi will be shortened from 4079 km to 2664 km, which will form the nearest sea exit to Huoerguosi and Tianjin port.


    It is reported that Beijing to

    Urumchi

    The National Highway (Jingxin Expressway) Gansu Ming River to Xinjiang Hami section of the civil engineering project starting point for Xinjiang and Gansu near the Ming Shui near the end of the Hami area camel circle and Lian Huo Interchange Interchange line, the project along the desert and Gobi area mainly.


    Designed speed 120 km


    The construction of Gansu Ming Shui to Xinjiang

    Hami

    The total investment of the project is 3 billion 600 million yuan, the design speed of the project is 120 kilometers, the double separation expressway is the first phase, and the first phase of the project is 2 years, and it was completed in 2012.

    The two phase of the project will start in the second half year.

    After completion, it will become a fast pportation channel for Xinjiang to the northwest, North China, East China and Central Asia, and occupy an important position in the national expressway network.


    Reporters learned from relevant departments on 28 th that the construction units of the four contract sections of the expressway construction project headquarters of Gansu Ming Shui to Hami section of Xinjiang have recently mobilized large machinery into the construction site. The construction units have carried out paving and watering operations according to the design plan, and third contract sections have built a 1200 cubic concrete mixing station in the depths of Gobi.


    At the beginning of this year, the Transport Department of Gansu and Xinjiang two provinces jointly signed the "cooperation agreement on strengthening the construction and pportation management of inter provincial highway passages", and agreed that Xinjiang and Gansu will jointly promote the construction of the "Three North" major Corridor project with the three provinces and regions of the Inner Mongolia Provincial Transport Department, and start work in accordance with the same standards, and comprehensively speed up the construction of Expressway in Gansu Province.


    A shortcut for the eastern economy to "go west"


    Among them, the new Gansu Expressway from Ming Shui to Xinjiang section opened in the first half of the year, and is expected to be opened to traffic in 2013.

    The "Three North" main road from east to Heilongjiang, West to Xinjiang, Huoerguosi, across Heilongjiang, Jilin, Liaoning, Hebei, Tianjin, Beijing, Inner Mongolia, Inner Mongolia, Inner Mongolia, 9 provinces, districts and cities, with a total length of 5400 km.

    The Beijing Urumqi Expressway (the Beijing new line) is an important part of the "Three North" main road. Its starting point is Beijing. Zhangjiakou, Hohhot, Linhe, Ejinaqi and Hami end up Urumqi.

    After the completion of the highway, the distance between Beijing and Urumqi can be shortened by 1415 km, so that the mileage of Beijing to Urumqi will be shortened from 4079 km to 2664 km, forming the nearest coastal outlet of Huoerguosi to Tianjin port, and also a shortcut for the eastern economy to "go west".


    Jingxin expressway is known as the "convenient northwestern corridor". The artery of pportation is the sixth radiation of the national highway network planning, with a total length of 2582 km.

    The expressway passes through Beijing, Zhangjiakou, Jining - Hohhot - Baotou - Linhe - Ejinaqi - Hami - Turpan to Urumqi, once it is through, it will be the most convenient highway access from Beijing to Beijing, which is 1136 kilometers shorter than the existing channel: e - Datong - Erdos - - - - - - - - - the - operation of the operation mileage by 1270 km.


     

    • Related reading

    A Case Study On The Business Structure Of The World'S Top 10 Logistics Companies

    Logistics skills
    |
    2011/3/28 16:34:00
    348

    Some Logistics Companies Increase Freight &Nbsp; Express Company Intends To Raise Prices Again.

    Logistics skills
    |
    2011/3/28 14:31:00
    58

    Emergency Logistics Optimization Based On Supply Chain Perspective

    Logistics skills
    |
    2011/3/28 14:19:00
    175

    5 Tips To Win Market Segmentation

    Logistics skills
    |
    2011/2/25 16:51:00
    130

    "Comb" And "Solution" Of Traffic Volume Prediction

    Logistics skills
    |
    2011/1/28 19:24:00
    200
    Read the next article

    金志國狼性煉造對團隊管理的啟示

     金志國是國企里少有的“狼性派”,酒量超群,行事強悍,也善于思考,率領一個狼性團隊。   有人問過金志國,什么是他心目中一個強悍領導的關鍵?金志國認為有4點:其一是有可為有可不為的戰略定位力,這是一方面,就是方向把握的能力。其二是踩油門和踩剎車的控制能力,我們善于踩油門,欲望很大,什么都想干。其三是風險管理和控制力。其四是整個的潛力管理能力。

    主站蜘蛛池模板: 国产超碰人人爽人人做人人添| 毛片免费观看的视频在线| 日本a免费观看| 国产乱子伦农村XXXX| 久久久久久亚洲精品成人| 中文在线免费看视频| 老师我好爽再深一点的视频| 无遮无挡爽爽免费视频| 国产h视频在线观看| 中文字幕无线码免费人妻| 羞羞网站在线免费观看| 性xxxxx大片免费视频| 免费特级黄毛片| aaaaa级少妇高潮大片| 欧美色欧美亚洲另类二区| 国产精品成在线观看| 亚洲伊人色一综合网| 99久热任我爽精品视频| 日韩一级片网址| 国产特黄一级片| 九色综合久久综合欧美97| 韩国免费A级作爱片无码| 无遮挡亲胸捏胸激吻视频| 午夜理伦三级播放| h在线观看网站| 欧美成人家庭影院| 国产成人av一区二区三区在线观看 | 亚洲中文精品久久久久久不卡| 久热中文字幕在线精品免费| 日韩avdvd| 动漫美女吸乳羞羞动漫| 99久久人人爽亚洲精品美女| 男人进去女人爽免费视频国产| 在线国产你懂的| 亚洲av无码精品色午夜果冻不卡 | 手机在线看片国产| 日韩欧美一二区| 周妍希美乳三点尽露四季图片| bbbbbbbw日本| 热re99久久精品国99热| 国产精品另类激情久久久免费|